The Other Terminus - Construction Starts
Evening all,
Not been able to do alot as I'm getting ready for a new year at College. But, I've finalised on the track layout and it fits everything I wanted from it. Here's some pictures including my new N15 Maunsell N15 4-6-0 No. 736 'Excalibur':-
Unlike my preivous pictures, there is still the two coach runround loop with a headshunt that can hod a Hornby princess. However, I've now got a 3 road carriage yard (where me Maroon Mk1 is) so I can have the fantastic Bachmann Carriage shed on my layout when its installed. Also, I've added a small Engine shed area near the platform (where Tornado is on the top picture).
Once I get paid, I need to buy 3 Left Hand points, a Right hand point and a catchpoint before I can start track laying. However, I'm debating if to use underlay or not. I'm planning to use the Hornby underlays but I'd like to know if anyone's used it before or have it installed at the moment on thier layout and what it's like before I buy it. Anyone have it on here?
Until next time,
Jon
0 Comments
Recommended Comments
There are no comments to display.
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now