Sandboxes and Filler Tubes
The detailing is getting a bit silly now, I need to sit quietly in a darkened room, or just get on with the kitchen!
Trouble is, now I know how the sandboxes are arranged on a Brit and the with daylight visible between the boiler and frames on the 2-8-2, the absence of sandboxes and filler tubes would just bug me.
So, I got busy with some plasticard, EMA Plastic Weld and a scalpel.
There's still some cleaning up to do and the tops of the tubes need trimming to ensire that they just touch the underside of the footplate.
It's all bonded to the boiler lower, so the boxes slip between the frames and are only attached to the tubes.
Now the position of the filler tubes is set, I can get on with making the filler caps etc to go on top of the footplate.
Boxes will be painted red (as will the inside of the frames) so they should be visible.
EDIT:
filler caps etc in place now, here's a quick snap of one of them
Squares of plasticard with 1.25mm copper wire glued into holes in the centre, tops filed flat.
5 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now