Bristol Barrow Road - Block Instrument Shelf & Lever Frame
The lever frame is now painted and is ready to go into the box as is the Instrument Shelf complete with the Block Instruments and Bells.
Painting the levers was relatively straight forward although I must admit the chevrons on levers 14 & 15 - the Down Main and Up Main Detonators - took a steady hand with the black chevrons added using a 0.25 rotring pen. Levers 19,29 and 22 are also all Facing point locks and consequently are painted black [bottom] and blue [top].
Adding the red and green to the block instruments was not as successful as I had hoped as the narrow nibbed pens used bled and required some cleaning up afterwards.
Now all I need to do is adapt the white metal castings for 2 stoves, booking in shelf and stool, notice board, chair and clock.
I have decided to add some lighting and will use the brass stove flue pipes for the power supply.
6 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now