Jump to content
 
  • entries
    54
  • comments
    185
  • views
    41,472

Wiring the Layout


Ian Morgan

1,050 views

6th June 2010: This week saw the completion of the track wiring, and the successful test running of trains all over the layout. Copper tape bus bars run beneath the tracks, and small 'dropper' wires link the rails to the tape (two per length of rail). There was just one missing link wire found. Wiring up the point operating servos is still to be done. From the photos you can see one Merg Servo4 board mounted under the baseboard. Two more of these will be fitted to control the remainder of the points, and the, as yet, non-existant uncoupler magnet devices.

 

blogentry-11458-0-69170600-1302356339_thumb.jpg

 

One inovation I have added is to allow instant switchover from analogue DC operation to DCC operation. The rails are divided up into sections, as normal. Individual lengths of rail in a section are linked up by the copper tape runs beneath the layout. The point 'frog' sections are kept as short as posible, and are fed from microswitches operated by the point mechanisms, switching between the two adjacent stock rails. Each rail 'section' is kept separate on the layout, and are fed by wires from a single multipole connector (an old Centronics parallel printer socket with 36 pins.

 

blogentry-11458-0-57815300-1302356588_thumb.jpg

 

I then added wire links inside a plug to connect the sections together. For analogue DC, siding sections are linked to 'frog' sections so that they are isolated by the points. Another plug, for DCC operation, would link together all the left-hand rails, and all the right-hand rails, and leave the 'frog' sections unconnected.

 

blogentry-11458-0-53118300-1302356760_thumb.jpg

 

26th June 2010: A weekend exhibiting Coley Park at Yeovilton followed by a weekend in Slovenia on a business trip slowed progress, but last week saw the completion of the wiring for the point operating servos to a 'temporary' switch box which will be replaced by Merg CBUS control one day. Unfortunately, two of the Merg Servo4 controller circuits I built last summer failed to respond to the setting up box. I only had 5 of the 7 points working.

 

However, I checked the Merg forums and it seems that there was a fault with programming the PIC microcontrollers for the kits last year (since fixed). An email to the Merg kitmaster saw a speedy response, and two new microcontrollers turned up in the post this morning. They are now fitted and working, and the two faulty ones will be returned for re-programming. Many thanks to Martin (Merg kitmaster).

 

The fiddle yard has one length of track laid and wired up, but that is all for now.

 

I have also added some more bits of wood to the underside of the baseboards to protect the wiring, servos and circuit boards during transit, and have purchased wood and bits to build the lighting gantry, but it was just too hot to do much today.

 

So, at the AGM, there will be plain, unballasted track and no scenery, but quite a lot going on underneath the baseboards, and hopefully trains running (analogue DC and/or DCC).

 

5th July 2010: We had a great weekend at the Expo - lots to see and spend money on. Dave Stratton lent a hand carrying and operating, allowing me to roam a bit with the video camera.

 

I had the layout operating with nearly a week to go, and I chose to give the track a last minute paint job. I did not find time to add rust to the rails, just a spray of undercoat, and some paint slapped on the concrete and timber sleepers. It took an hour to scrape the rail tops and free up the point blades, but it was ready to go when the doors opened.

 

The layout performed a treat all the weekend, once the rails and wheels were cleaned and the back-to-back of several wagon wheels reset using the gauge. I am really glad I concentrated on getting the track right rather than pressing on with the scenery, as it is a pain to sort out with delicate buildings in the way. Now I can start laying ballast. I was definitely not going to do that before the Expo.

 

Uncoupling was achieved using a hand held rare-earth magnet waved about underneath the baseboards. 50 small rare earth magnets have now arrived in the post (ebay) which I will now produce a mechenism for. To shunt the kick-back siding, couplings had to be added to the other end of locomotives which previously only needed one coupling for shunting on Coley Park. It does add some interest to what is a much smaller goods yard though.

 

The servos and merg Servo4 control boards worked perfectly and did not require any attention all weekend - very promising.

 

The ability to switch from analogue DC to DCC and back again was of interest to some people, and when a wheelchair-bound friend turned up, we managed to lower the complete layout for him, using the adjustable trestles, returning it to our height later. This was not as easy as hoped, and will probably not be repeated, but it does show that we can chose what height to set up at before each exhibition.

 

I just have this out-of-focus pic of Dave shunting:

 

blogentry-11458-0-95366100-1302357100_thumb.jpg

  • Like 2

4 Comments


Recommended Comments

  • RMweb Gold

I hadn't clicked that you had built 'Brunswick' until I saw the photo of Dave and recognised him from the 2FS website. That would be a nice layout to document on here too some day.

 

Great to see the DC/DCC ease of changeover - I wonder how often you will switch between the two?....

Link to comment

Hi Ian, Just came across your blog and love the wiring, very neat and something I have thought about mixing DC and DCC. Shame I didn't have very long at the 50th there was so much to take in.

 

Regards

Tom

Link to comment
  • RMweb Gold

Your wish is my command:

 

That was quick - Thanks Ian - Any other gems built between 2001 and 2010 that you feel like sharing? ;)

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...