Jump to content
 
  • entries
    266
  • comments
    645
  • views
    159,702

Duke Chassis Progress


RedgateModels

358 views

Not much to show really since the last update - although a lot of thought and planning has been done ;)

 

here's the Caprotti gear with plasticard slivers epoxied to the backs of the lubricator castings. These will fit into the slots in the cast lubricator mounts on the chassis. The rear mounting points will be bonded to the already fabricated rear bracket.

 

blogentry-6717-0-02264000-1309442858_thumb.jpg

 

The seconds shot shows the Hornby cylinders modified with the GA castings. The tops of the cylinders were cut away with razor saw and then the castings trimmed up to fit and again epoxied into place.

 

blogentry-6717-0-73630000-1309443043_thumb.jpg

 

I will drill holes in the rear faces of the castings to accept the two rods from the caprotti gear which will give a nice reliable 3 point fixing for the gear which will still allow for removal for painting and servicing.

 

The firebox sides below the footplate have also been glued in place and the front running plate next to the buffer beam has been filed back to the correct angle. The casting as supplied still retains the Britannia arrangement.

 

Should be at least together and running for Saturday :)

0 Comments


Recommended Comments

There are no comments to display.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...