An evening with Scalescene's paper and card on Friday has resulted in the road bridge being basically complete. A mistake on my part mean that I had to do quite a bit of re-work as I'd not left quite enough room for the bridge to fit against the viaduct wall. Not quite sure how I screwed that up but there you go. The gab between the buttress and the wall which is very noticeable in the photograph will close up when I get the bits stuck in their final positions.
To the right of the road going under the bridge there is going to be a wall with an entrance way into the low level coal yard. To the left will be the ground level buildings for the station.
As you'll all notice the Claud is still missing its smokebox door number but is still heading up a parcels train!
David
- 4
2 Comments
Recommended Comments
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now