Jump to content
 
  • entries
    15
  • comments
    93
  • views
    14,861

Baseboards and Planning


MinerChris

1,454 views

blog-0385316001339945415.jpgAs suggested in the last entry, Congdon's Shop's home will be in boxfiles that were picked up cheaply from a supermarket. I am still not entirely sure what the future holds with my job, but conceivably I could be flying once a week to a mine site in the middle of nowhere. I'm not saying that the layout would be taken, but it would be nice to have the option.

 

The baseboards themselves have been constructed from plywood and fit into the boxfiles. This gives the baseboards the slightly unusual dimensions of 357 x 235mm or 1' 2 1/16†x 9 3/16†in old money, as it allows a couple of mm to remove the layout whilst maximizing the available space. I'm not sure whether this means Congdon's shop is a “boxfile layout,†especially as two boxfiles have been used for the scenic sections and is quite likely that buildings, scenery and stock will be dumped in a further (two). I'll leave that description for others to discuss. The baseboards are 33mm thick, which leaves enough room for some control below the layout.

 

Construction was based on the same basic structure as south yard, plywood sides glued together by short lengths of hardwood. The 3mm plywood was cut using a high tech stanley knife. For anyone considering the same method, it is much easier to start with a new blade, which I discovered about halfway through after a trip to Wickes. Cutting accuracy was a problem, especially cutting the long side pieces and hence a plane was used in order to ensure that all of the side pieces were the same width.

 

blogentry-15793-0-22781300-1339944471.jpg

 

Using this KISS principle, it should have been really hard to make a mistake. However a slight step was observed about half way along the join between the two boards. This was corrected by sliding a knife in the joint, clearing out the dried glue, applying fresh glue before clamping the rise down.

 

Departing from south yard, I decided to incorporate an additional plywood baton down the centre of the boards in order to try to stop any warping or sagging. South Yard has only very slightly sagged in the centre of the board. Additional diagonals had also been cut out but upon consultation it was decided that these weren't needed and would be a hindrance.

 

The other departure was the two blocks of softwood incorporated into the joint side of each baseboard. This will eventually be for the C & L pattern makers dowels, to ensure correct alignment. More by coincidence than planning, the recess incorporated by this is slightly larger than the depth of the dowels.

 

I couldn't find the dimension of these online, so for those who are planning to use them in the future; the screws supplied are 3/4†length with 16mm thread showing when installed, the plate is 1†diameter and 3mm thick. finally the dowel itself 8mm diameter and 11mm length.

 

blogentry-15793-0-09088500-1339944463.jpg

 

Keeping the two boards together will be done by a couple of bolts through the softwood blocks. As can be seen in the photograph, when these holes were drilled it dragged some of the side of the block out, coupled with this the bolts are also very tight. Eventually when I make my escape from Cornwall and get access to a drill once again, I will ream these holes out and glue the shown brass tube on the inside. The bolts will pass through these tubes, which I hope will be a more accurate and neat solution that will be less susceptible to wear.

 

The track plan has been drawn based on the layout of platforms and sidings at Callington. This should mean that one day the layout could be back converted with the addition of more modules and buildings. Unusually this means that coaches have to be propelled back out of the station for the loco to be able to run around, which also happens to be excellent for space saving. A standard CAD package was used to draw the diagram in layers with templates for the points recycled from the planning stages of ST Ruth.

 

blogentry-15793-0-64813200-1339944458.jpg

 

The platform length was determined by the longest train that I was planning to run, which turned out to be a three car Class 118 DMU. Loco hauled trains will only be comprised of 2 coaches, but in reality 3 coaches for specials can be accommodated with a slight overhang. I will concede that the sidings are probably too long, but there are photographs of lots of wagons surrounding Callington station, so who knows maybe not?

 

I will be using easitrac to build the trackwork, including the milled turnout bases. The turnouts and solitary signal will be controlled using microservo's, should I be able to get them to work. DG couplings will be released using the Gaugemaster EM-1 electromagents to allow for some shunting activities. I only plan to have one controller for wiring simplicity, but isolating switches will be incorporated to allow for more than one loco to be on the layout at a time. Trains will be fed to the layout by cassettes, which will be compatible with my dad's (so I can “borrow,†if I need extra!)

 

Once the track plan was decided upon, the diagram was printed out and laid over the baseboards. This highlighted possible issues with the tie bars fouling the sides and were then adjusted accordingly. It also allowed me to check the clearances around the layout between the sidings.

 

blogentry-15793-0-63341300-1339944465.jpg

 

This also gave me an opportunity to play “paper trains,†the results of which can be seen in the photographs below with the limited amount of stock that I have.

 

blogentry-15793-0-10903600-1339944468.jpg

BHE- WW hybrid Class 118 DMU waits at the platform, and for painting.

 

blogentry-15793-0-92594300-1339944460.jpg

A perhaps unlikely scene, Dapol 14xx and autocoach’s waits at platform, whilst the Dapol 2-6-2MT shunts association vans in the yard. Both locos are awaiting replacement chassis, 14xx from the association and the 2-6-2T from Nigel Hunt.

 

Construction will be delayed for a couple of weeks, due to recovering funds from an celebratory splurge to Hattons for getting an first in my degree. More details of which may appear on the ST Ruth blog soon. Some eagle eyed readers may have noticed a bottle and glass of beverage in one of the photographs, however the question has to be asked “Have I Earned it?!†(groan...). Predecessors of this glass may have had something to do with the splurge. :wackoclear:

  • Like 6

10 Comments


Recommended Comments

  • RMweb Premium

all 2mm modellers need beer :angel: if your using the merg kit and software the signal should be easier than you think I use 3.7g servos for my points with no problems and test rigged signal using one as well which bounced quite happily

  • Like 1
Link to comment
  • RMweb Gold

Cracking blog entry Chris.

 

A very nice project indeed and looks to be a good size to take on which should be both fun to build and interesting to operate.

 

I look forward to tracking progress...

 

(Congrats on your First Class Honours degree...Join the club ;))

  • Like 1
Link to comment

Gosh an epic posting. Like the new control box thingy.

 

Beer and buying new trains are both essential parts of modelling but I'd recommend keeping them separate. Waiting to see what mix of liveries comes out of that Hatton's box when it's opened.

  • Like 1
Link to comment

all 2mm modellers need beer :angel: if your using the merg kit and software the signal should be easier than you think I use 3.7g servos for my points with no problems and test rigged signal using one as well which bounced quite happily

 

Nick,

 

I agree Beer and modelling do go hand in hand in fact I have changed county and gone for Devonshire beer this evening.

 

The plan to use servos may not be without problems due to the restricted space below the board. Some thought has to be made how to align the servos to fit them in, my thinking so far is to use an small wire in tube coupling to the tie bar. I will probably use whatever is used to control the signal servos on ST Ruth in order to just add onto their orders and make use of the setting up equipment.

 

Cracking blog entry Chris.

 

A very nice project indeed and looks to be a good size to take on which should be both fun to build and interesting to operate.

 

I look forward to tracking progress...

 

Thanks Pete,

 

I guess it is what I am aiming for with an starting project so the fact I have managed to hit it is good! I should mention however that this is progress from the last 2 months for the baseboards and 2 years for the planning. Hence progress will appear to slow an little.

 

I hope that my writing style isn't too boring, but I aim to chart both successes and failures in the hope that one day in the far future some may learn from my mistakes. Hopefully if I am going off track with something or there is an better way of doing something then someone on here will have an suggestion.

 

 

Gosh an epic posting. Like the new control box thingy.

 

Beer and buying new trains are both essential parts of modelling but I'd recommend keeping them separate. Waiting to see what mix of liveries comes out of that Hatton's box when it's opened.

 

The Control box thingy still needs tidying up (and some wires putting in) and still needs some tweaking to bring it up to drawing office standards. Most of the parts have been bought but the new Truro Maplin keeps running out of the relevant switches, (Student discount, got to use it whilst I still can!)

 

Upon reflection I would agree too that the keeping these two activities separate is an good idea.

 

We could even run a guess the model competition (no prizes but suggestions below please)... The answer may even be an surprise to me... It might not even be the right scale..

 

Best Regards,

 

Chris.

Link to comment

Hello Chris.

 

As the others have said, that is a great post. It has given me a good idea on what you are upto.

 

As for the servos, I would agree with Nick that the MERG sevo driver is very adaptable although I would be interested in knowing what version board and chip others are using as I am struggling to program mine atm!

 

You seem to have an interesting selection of rolling stock too which is cool.

 

Missy :)

 

P.S. Not ALL modellers are dependent on beer! :P

  • Like 1
Link to comment
  • RMweb Premium

I would be interested in knowing what version board and chip others are using as I am struggling to program mine atm!

 

Missy :)

 

 

 

I use a early board and a more modern boards however have found the servosetplus interface the bees knees for setting the various servo versions

 

 

 

 

P.S. Not ALL modellers are dependent on beer! :P

 

 

 

True wine or Gin work as well :haha:

  • Like 1
Link to comment
  • RMweb Gold

As an alternative to the metal dowels and rods to connet your basebaords, have you considered magnetic handbag clasps ?

There act both as the acurate locating device and keep the board together, but are simple use and come apart when required.

(If you are still in Cornwall, you can get these from the haberdashery stall in the Pannier Market, Truro).

Stu

  • Like 1
Link to comment

As the others have said, that is a great post. It has given me a good idea on what you are upto.

 

As for the servos, I would agree with Nick that the MERG sevo driver is very adaptable although I would be interested in knowing what version board and chip others are using as I am struggling to program mine atm!

 

You seem to have an interesting selection of rolling stock too which is cool.

 

Thanks Missy,

 

I will let you and everyone else know how I get on, when I get around to doing it! I actually need to make some points and tie-bars first.

 

 

P.S. Not ALL modellers are dependent on beer! :P

 

I will concede that you don't have to drink beer to model, however it does help me!!

 

 

True wine or Gin work as well :haha:

 

you beat me to that Nick... :laugh:

 

What are these substances that you speak of?? :laugh:

 

 

As an alternative to the metal dowels and rods to connet your basebaords, have you considered magnetic handbag clasps ?

There act both as the acurate locating device and keep the board together, but are simple use and come apart when required.

(If you are still in Cornwall, you can get these from the haberdashery stall in the Pannier Market, Truro).

Stu

 

Stu.

 

It had not even crossed my mind...

 

I think that as I already have the bolts, rod and alignment dowels in my possession I will continue to use these for the main join.

 

It is an very good idea indeed (kicks himself for not thinking of before). I might use these on the cassette adaptor at the end. Do you have any Idea on the amount of weight or force they can take before they separate?

 

Best Regards,

 

Chris.

Link to comment
  • RMweb Gold

Chris,

I used these on my last box file layout, Laterite & Co. The two magnets were enough to hang a second box when held vertically. To pull them apart was almost impossible if pulled straight, but by 'bending' the two boxes on the join they could be 'levered' apart.

HTH

Stu

Link to comment

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...