Jump to content

GRC

Members
  • Content Count

    141
  • Joined

  • Last visited

Everything posted by GRC

  1. The train automation programs from what I can tell and certainly how iTrain works are based on profiling the locomotives. Once the automation program knows how far the train moves at each speed setting it can very accurately predict the train stop position. If you plan on running unprofiled locomotives then a 3 sensor block with a stop block at each end of the overall block reduces the requirement for profiling. The stop blocks cound be current or spot detection depending on requirement.
  2. Great size for n gauge. Will follow your build with interest
  3. Many thanks for your great photo’s in the Templecombe post,  sort of modelling it myself and they are from angles I haven’t seen before so very useful.  Gavin...

    1. unravelled

      unravelled

      Thanks, I'm glad they are useful.

  4. I couldn’t make the May meeting but will keep my eye open for this one. All the boards are still in the garage from the first event and only been out once since then
  5. Picked a couple of dates mid April. Can’t do beginning of April as show and then away and not available in May after the Bank Holiday
  6. I still have the layout from last time and only used it once since last time. Can’t commit at the moment as I already have a show with Sturminster Halt in April but once you have a date I can review. Thanks for the prod Crompton. Not been here for a while ..
  7. Changed tack, Now onto a room based layout called Dorset Shire. Based on Broadstone, Shillingstone and Templecombe

    1. PhilEakins

      PhilEakins

      Must be a darned big room.

    2. Ian J.
  8. Changed tack, Now onto a room based layout called Dorset Shire. Based on Broadstone, Shillingstone and Templecombe

  9. /www.chilions.org.uk/modelrail.html Going to be at Chichester on the 24th Oct with Crawley yard in the WSNG Modular layout
  10. Sturminster Halt will be at the Milland Village Hall for the Liphook and District MRC's Open day along with me :-)
  11. One day for me please, cream crackerd after the last event.
  12. Any chance we could get a date before Easter whilst the modeling season is in full swing rather than waiting until June ? Dates permitting count me in anyway :-)
  13. Great work on finding that Mark. Nice to know thas one potential problem we had resolved. I don't think anyone really used the wired controllers apart from the yards so something that keeps the wifi connection up is all good.
  14. Been busy today doing some final work on the scenery and the stock. Fitting kadee's to some stock to provide auto uncoupling capability and improve the look. Done some test running on the main boards to try and get all the glue off the track and make sure the. Ballast is clear of the rails. Few niggles for tomorrow and then it's all into the garage ready for Saturday.
  15. Going to add a mug to my list. Unfortunatly i suspect we will all be driving so no wine or beer .
  16. Signal box done now. Where did the day go :-) And with the picture
  17. 4 "layout " working days to the meet. Whats everyone workng on ? Here its More grass, more sand, details , jmri mimic panel, electrics and the stock
  18. Test running and fit today to make sure were ready for the 27th. Still a lot of scenic work to do but the fit appears to be ok . Done some fettling on the tracks to make the running smoother. Still having some problems with the points and electrics but that can wait until the boards are upside down. Fitted the Train Tronics controller so the signal is now working but the station lights will have to wait until after the show. The test running was fairly successful with both the 3P and 4F performing well. Have a larger pile of wagons to change the couplers on now. Spent a couple of hou
  19. Tested the packing again today, All still fits together with the scenery on apart from one Telegraph pole which will have to be a moveable feature with the trees when they get made.
  20. Ill need help with my boards can do most bits but not the lift up and drop down at the end of the day
  21. This is interesting and one to come back to if wifi doesnt work. I think we need to persevere in the wifi space because if we can get it to work we wont need any throttle infrastuctuure and that has to be easier for everyone.
  22. Thanks very much, lots like it in Dorset so a good fit. unfortunately I couldn't find a picture of the the actual house that was there back in the 20's so thought this was a good compromise, Filled the space nicely anyway. working back towards the goods shed now :-)
  23. Did some gardening last weekend
×
×
  • Create New...