Jump to content
 

thedman

Members
  • Posts

    63
  • Joined

  • Last visited

Everything posted by thedman

  1. I believe they should arrive 28th July
  2. The problems at Dalmarnock (now resolved) are not the result (it is not below the level of the Clyde) of tidal flooding or relation to sea level, but simply the Dalmarnock Water treatment works overflowed, forcing water up through the drains/sewers. The next time you travel between Rutherglen and Dalmarnock have a look at the catch pit covers in the cess on the slab that have the metal straps fitted over the top of them.
  3. Hope your going to have 3 MPM’s and plenty of spare bent staples, ahem I mean security fuses. Dont use 9 tiles wall boxes for attaching the nodes to the network. Make sure your SDS does not go on fire! Your techs terminal needs to be an original ‘cypher’ terminal, with tapes! is your interlocking going to have the ‘Newton’ modification when you cold start it?
  4. Have a look at page 8 of the attached link, I am unable to post up the M12 https://www.whatdotheyknow.com/request/293222/response/729672/attach/34/511578 SC039 Kilmarnock Barassie Jn May 15 Ver 1.5 020.pdf#page=8
  5. The closest track layouts off the top of my head to what your are trying to model is Barassie or Thornton North.
  6. I don’t see the need for LP205 or LP206 as these would need to become ‘pre-set’ shunt signals within the main aspect routes and also when 103 could have a LOS up the branch replacing 206 and then the subsequent opposite direction would utilise 112 replacing 205. In regards to your final question, if you had also designed in track circuits on your scheme plan, LP103 & 105 would have in place TER (timed electrical release) where their berth track circuits were occupied for say 30 seconds on their own with the tc of that berth in rear having been cleared for that time also to ‘demonstrate/prove’ that the train had been ‘electrically’ timed to a stand. Another way that we do this, is that if we set a route from 101 to either 103 or 105 and the route from 103 or 105 is not already ‘pre-selected’, 101 signal becomes approach controlled from ‘red’ thus as belt and braces making the approaching train being at a speed of which the driver is prepared/ready to stop. This is a compromise in absolute approach locking as we nether have flank protection applied by existing S&C or by run offs. Once this down direction train was ‘electrically’ proved to a stop and UP direction service could be signalled off the branch. Another way it could be done is that if first a train is signalled from 112 in the UP direction, the interlocking would have a ‘special control’ where if 112 was showing a proceed or had an overlap going past it, a proceed aspect could not be obtained on 101. hope this helps
  7. Mount Florida couldn’t take a 9-car for football traffic at Hamden.
  8. Think I will stick with my DJH version.
  9. Caption for this picture, states February 82 heading into High St Goods along the Goods/slow @ Belgrove.
  10. Graham, Apologies for the delay in replying, I never noticed your post. Hope these are what your looking for. Darren
  11. Pity there is no 117 in Scotrail branded Regional Railways. Ltd Edition anyone?
  12. Also remember that the tail lights are different (hinge horizontal or vertical) dependant if they were Brush or Crewe built.
  13. All of mine appear to be circa 46mm solebar back to back. It doesn't look like this on the pictures but I had to hold the camera at an angle to prevent a shadow. Hope this helps
  14. Your in a kind of chicken and egg situation here. My mythology for building Parkins/RJH/PMRP kits and other which have blank floors without is as follows. 1. Fit my top hat bearings into axle boxes (as deep as the casting depth will allow). 2. Fit my wheel sets dry and then measure the width of the solebar inner edges. 3. Mark a Centre line up the floor and then use this to Centre your already measured solebar width. 4. Tack your solebars in place, make sure your wheels are free running. (I use a craft knife to slide/adjust the top hats in or out) 5. Lastly, make sure your solebars are not fouling your buffer holes. I have 3 or 4 built and painted OTA/SPA and a part built OBA that should all be roughly identical (some were built almost 20 years ago) that I will try and photograph over the festive and post up. hope this helps
  15. I have the pictures to prove it with MM & KB, et al
  16. Great driver, but will always be remembered for second best to Jimmy.
  17. Two name and numbered version to be released by Heljan will be:- 56101 ‘Mutual Improvement’ in trainload coal and 56110 ‘Croft’ in trainload construction
  18. Only on coal traffic and the dog food from Deanside, no Iron Ore as the Ravenscraig circuit had stopped by 92.
  19. The Fife Circle 2G13 etc in 1992 was a VO Mk2 rake in Scotrail colours (reggie railways) with different branding. The senior traction inspector at Edinburgh (LG) made noises of sourcing airbraked stock so that he could utilise 56’s and train drivers on them!
  20. Think he is talking about the Mk2’s used by the push pull 27’s before the Mk3’s arrived!
  21. One question for you Ben, with the caveat of I don’t know how far down the build/design you are! Will the radiator fan vents on the body side (supports) be part of the main body shell of separate?
  22. Thats good to know Ben, one loco you will not be able to model will be 56085 as for some reason it was built without cab front steps!
×
×
  • Create New...