Inspired by the topics on RMWEB I'm making my first foray into kit building so I've dugout some Kemilway etchings I purchased a few years ago in a fit of magpie fever.
I have etches for CB 3LNER 51'0" Steel panelled lavatory composite, CB5 Brake third and CF1 &2.
As far as I can work out its a twin set shown at the bottom of the page here http://www.steve-banks.org/modelling/197-gresley-51-1-1-2-steel-panelled-stock
But I'm not sure, it would explain why a two coach kit has only four buffers and three bogie screws.
Tbh I'm stuck and don't really know where to start, so far I've formed the tumble home on two sides, but I can't find instructions and I don't know which chassis is for which coach, I can't find the diagrams.
I think the ends fold up on the chassis and the sides fold down. But that's about It.
Any help would be appreciated, I am trying to upload pictures but it says their too big on my iPad and I can use a soldering iron.