Hi everyone,
I need some help understanding how the point rodding would have looked/worked at Fawley in Hampshire.
I am modelling Fawley and for the most part I understand how things would have worked, however, I don't understand how the point rodding would have worked for the points numbered '4' in the attached picture... there is only a single run of point rodding to the 2 sets of points numbered '4' looking at the picture attached... would the loop point have been clipped and the rodding operate only the platform road point? Or would the single length of rodding operate both points on one pull of lever '4'?
Also is the symbol like a cross on the points labelled '6' a facing point lock??
Hopefully I have explained this clearly.. as you can see I am no signalman but I do want to get this right.
many thanks in advance!
Richard.