Jump to content
 

GJB

Members
  • Posts

    40
  • Joined

  • Last visited

Profile Information

  • Location
    Heanor, Derbyshire

Recent Profile Visitors

368 profile views

GJB's Achievements

90

Reputation

Bookmarks

  1. point rodding
    Stools, Cranks & Point Rodding!

    Before I start painting and ballasting the trackwork I want to tackle the point rodding. A number of years ago I made the mistake on a 4mm layout of ballasting first, I then spent hours digging up small patches of ballast so that I could install the rodding stools! Armed with a copy of GWR journal number 89, Steven Williams GWR modelling part 1 and some useful advice from Mike (Stationmaster) I made a start by drawing a schematic of where the runs needed to go. Once this had been completed I placed an order from Wizard models of MSE's rodding stools, etched brass cranks and 0.8mm Nickel Silver wire. The stools are made from white metal and can be cut quite easily to the required length with a sharp scalpel blade.

     

    Model Signal Engineering stools

    blogentry-5869-0-89515800-1414409690_thumb.jpg

     

    Stools cut to length

    blogentry-5869-0-55861200-1414409752_thumb.jpg

     

    The stools need raising on blocks to make sure that the rodding isn't covered during ballasting. Spare sleepers were cut to suitable lengths and the white metal stools were glued in position using Cyanoacrylate.

     

    Sleeps cut to form blocks

    blogentry-5869-0-76935400-1414411118_thumb.jpg

     

    Stools glued in position on blocks

    blogentry-5869-0-54766800-1414411188_thumb.jpg

     

    Cranks and compensators were built using components from MSE's etched brass fret. Bolt heads were pressed out on the bases, then Carrs 188 solder paste was used to assemble the components using a Miniflame torch.

     

    Etched brass fret of cranks and pulleys from Model Signal Engineering

    blogentry-5869-0-61886300-1414411594_thumb.jpg

     

    Etched brass components

    blogentry-5869-0-29063300-1414411770_thumb.jpg

     

    Assembled components

    blogentry-5869-0-00867000-1414411816_thumb.jpg

     

    The stools were glued in position onto the baseboard tops using cyanoacrylate. A scale 6 foot length of sleeper was used as a jig to maintain the spacing between the individual blocks. A length of 0.8mm Nickel Silver wire was used to ensure that the blocks and stools were in the right alignment with each other.

     

    Stools and blocks glued in position

    blogentry-5869-0-93117500-1414412398_thumb.jpg

    blogentry-5869-0-71869200-1414412431_thumb.jpg

     

    Once the stools had set in position the Nickel Silver wire was cut to length and installed in position on top of the stools. The ends of each run needed to be bent down to meet the cranks and compensators which are set at a lower height than the stools. Once i was happy with the alignment of the wire rodding, it was soldered to any etched brass components and glue onto the stools using cyanoacrylate.

     

    Double slip and compensator

    blogentry-5869-0-14209500-1414413092_thumb.jpg

     

    Double compensator and runs leading under overbridge

    blogentry-5869-0-64382500-1414413122_thumb.jpg

     

    I was concerned that if I used Nickel Silver rodding where it crossed under the track it could lead to shorting if it touched the rails. With this in mind I chickened out and used plastic rod in these areas!

     

    Plastic rodding running under trackwork.

    blogentry-5869-0-24152700-1414413915_thumb.jpg

     

    I need to make a representation of the facing point lock that would have been situated under the bridge. I still need to make the detection bars and the cover, but the cranks and rodding runs have been installed.

     

    Facing point lock

    blogentry-5869-0-37384500-1414418335_thumb.jpg

     

    View towards bridge

    blogentry-5869-0-82530900-1414418474_thumb.jpg

     

    Overall view of progress so far

    blogentry-5869-0-57503100-1414418541_thumb.jpg

     

    Well that's the progress so far! Quite what the 517 in the last picture is doing shunting a coach into the goods shed remains a mystery, but I'm sure someone will have some explaining to do!

     

    I'm planning on staining the sleepers and making a start on the ballasting as the next project on the layout. I also need to decide on a signal box, I'm wondering if I could get away with using this offering from Peco as starting point http://www.peco-uk.com/product.asp?strParents=3309,3316&CAT_ID=3317&P_ID=18185 or would that be a cop out!?

     

    Best wishes

     

    Dave


  2. Marleigh 0 gauge (changing again) whoops
    Marleigh 0 gauge (changing again) whoops

    20190406_161830.jpg


  3. Getting it all together.
    Getting it all together.

    Well, the dye has been cast...... the through Station is no more.......

     

    Track work has been uprooted and a base for the engine shed is in situ......

     

    DSC04914.JPG.330ae2f91453633912af60ab1e2342ac.JPG

     

      GWR water fascilities have been carefully fettled from an old whitemetal kit......

     

    The long awaited cattle dock at the front has been made.....

     

    DSC04918.JPG.c1cd259e8b3729bf7ab8a7210baf9e83.JPG

     

    A replacement signal box, not made by me, but snapped up on ebay made by a longstanding regular seller was snapped up and is fully detailed internally and fits well at the end of what will be a new platform..

     

    DSC04919.JPG.eac4037e1ce6491e64dffff2817e4dc0.JPG

     

    The  new detailed platform will be fabricated platform in the next few weeks using 422 Model Making products....

     

    DSC04906.JPG.e6898b74c268d5d943a3ce7f2d32bdbc.JPG

     

     

    DSC04921.JPG.f30aca51309cb13bde68737bf9feb58a.JPG

     

     

     

     

     

     

     

     


×
×
  • Create New...