Jump to content
 

Earl Bathurst

Members
  • Posts

    861
  • Joined

  • Last visited

Everything posted by Earl Bathurst

  1. Superb modelling look forward to seeing more of this layout. The laser cut mills are they available for sale?
  2. Lovely layout. Great pictures. Look forward to seeing more photographs. Do you have a track plan and size of the layout available? What are you using for uncoupling wagons and coaches?
  3. Thank you for all the help. I am looking to model Era 5 and 6. This is the eras ive seen whilst visiting Germany
  4. I have had an interest in the railways of Germany since my visit in 2009. As with any enthusiasm i got carried away and tried to model everything (disaster). Is there a document or a list with all the different locomotive classes on which shows when they would have been seen on the network i.e. to and from Thanks in advance
  5. Superb modelling. What couplings do you use on your stock? How do you find shunting in 009 scale. I am in the process of planning a layout which will require shunting, any advice would be great
  6. Sounds like you had a good visit. Shame we never got the chance to speak properly at Warley
  7. Aiming for middle of next year but no definite date in case of a problem
  8. Whole rakes of maroon. I have seen images of mixed rakes but not too sure how quick BR would have repainted coaching stock into Blue/Grey after 1968
  9. After the end of steam, how long would you have seen maroon mk1 coaches running in express formations?
  10. I have a few steam locomotives with sound and totally agree with you steam sound still doesn't sound realistic enough. Diesel on the other hand sound fantastic. Class 37 at full cry
  11. Interesting concept. How many in total have decided to take part in the modular idea? Lovely modelling on the images above. look forward to seeing more How do you find the Heljan L and B locos?
  12. Superb Modelling. I will be watching this develop. Already it oozes atmosphere.
  13. Pop over to B08 and have a chat. It would be good to meet up Keep up the great modelling
  14. Are you attending Warley in November?
  15. 3 days until we open the doors for our 10th annual exhibition. Exhibitors Big and Bold (G) Dubmill Sidings(O) Budmouth (O) Gileston Quay (O) Brynllwyd (0-16.5) Harton Gill (P4) SHWT (EM) Oak Lane TMD (OO) Oak Road (OO) Bicsdale (OO) Cato Pass (OO) Long Melford (OO) Readham (OO) Trinity Dock Street Bridge (OO) Bradwell Point (OO) Bovington Road (OO) Penmawr (OO) Corris 1930 (OO9) Four Seasons (OO9) Rheneas Tunnel (OO9) Box Station (N) Tawebyn Valley (N) Traders KS Laser Design Ltd Russel Trains Railroom Electronics Kernow Model Rail Centre GLR Bespoke Services Oxford Diecast (Show Sponsor) WM Collectables Reflective Images Hereford Model Centre Lightmoor Press Henry Thomas (die-cast) Harvey’s Hobbies Ray Heard David Gwynne Gauge O Guild Sales Frome Model Centre War World Scenics DCC Train Automation The Vale of Rheidol Railway D Smith Demonstrations & Societies Swansea Railway Modellers' Group Michelle Davidson (Wagon Building) MERG Gauge O Guild (Fred Lewis) RCTS (South Wales Branch)
  16. Latest update. Detail being added to the platforms. More walls are being build along with a bridge. More to follow on the bridge.
  17. Superb Modelling. I think this layout needs to come back to Swansea next year. Scott
  18. 30 days until we open the doors to our 10th exhibition. Please note new venue
  19. Superb work. Look forward to seeing more pictures of your superb modelling
  20. The bulk of the work on the layout is complete. Detail work begins. More pictures to follow. First full running session also.
  21. I built the coal staithes a few months ago. When Phil drew the plan up I forgot to include them. I found a place for thembut the plan hasn't been updated.
  22. Having built one of the platforms (nearest the retaining wall) I don't think a large station suits the layout. My option isto have no station or maybe a very small platform and station. 2 coaches long for local stoppers. Any thoughts?
  23. Layout update: All track work is down and wired up Retaining walls are completed and weathered. More updates to follow
  24. Impressive modelling. Keep the pictures of your work coming.
×
×
  • Create New...