Jump to content
 

Crun

Members
  • Posts

    937
  • Joined

  • Last visited

Everything posted by Crun

  1. Off topic. Duchess of Sutherland on the NVR hauling the 12:00: https://www.instagram.com/p/CZy9OyqNrZe/?utm_source=ig_web_copy_link
  2. I must ride out that way this week. Decent weather this week after all the high winds and rain of the weekend.
  3. Sunday 6th February Views from around the new section of Hurn Road. Tarmac next... Looking west:
  4. Thanks for these Mick and Trackside ECML. I must make the most of the sunny weather and get out on my bike around Hurn Road and the Cock Lane bridge areas. Cheers all!
  5. A view from Cock Lane bridge of three security devices guarding a mystery object:
  6. Sunday 16th January Views of the concrete removal and the diversion through the temporary works HQ on Hurn Road:
  7. Saturday 15th January Off topic A view of an Azuma, from the city centre Nene Valley Railway car park, waiting at a red on the March line. For the second weekend in a row there are works trains on the ECML and diversions. Also power lines down south of Peterborough I just heard:
  8. Trains on the ECML, mostly around Werrington Junction. Use of the dive-under captured. January 4th, 10th, 12th and 13th 2022. A YouTube film by Trackside ECML:
  9. Saturday 8th January 2022 Views of diversions on the March lines from London Road: Works on the ECML from the Oundle Road:
  10. Thanks for the news. I am staying home with my hot soup etc... I hope to be out on the bike next week, weather permitting.
  11. Does anyone know why the dive-under is not being used by freight for all journeys up and down the joint line?
  12. Off topic. According to a thread on RailUK forums there were track circuit problems on the Up fast this morning: https://www.railforums.co.uk/threads/peterborough-p3-up-fast-line-block.226768/#post-5476191
  13. No trains seen using the dive-under from 15:00 to 16:20. I caught this on the Stamford line:
  14. Wednesday 22nd December Views from Hurn Road. Looks like a hedge is being planted. I suppose there'll be some kind of ditch or fence constructed between the field and Hurn Road... Looks like a TARDIS and a grit tub:
  15. "From after the last train on Christmas Eve until before the first service on Monday 27 December, engineers will be working to renew sections of track and the points on a nearby railway junction just north of the station."
  16. Off topic but Peterborough related: Points upgrades to take place at Peterborough train station this Christmas https://www.peterboroughtoday.co.uk/news/transport/points-upgrades-to-take-place-at-peterborough-train-station-this-christmas-3501506
  17. From Legolash on RailUKforums (railforums.co.uk): I managed to receive a signalling diagram for the the diveunder which allowed me to map the gradient data. I had to manually draw the tracks but I will receive an NR version early next year to draw more accurate locations. railmap.azurewebsites.net/Public/GradientsMap https://www.railforums.co.uk/attachments/1639683338396-png.107125/
×
×
  • Create New...