  1. The detailed build of the Goods Yard building at Omagh using 6mm birch ply for the walls and 3mm for the roof. The building, overall measures 900mm x 400mm and is built using original GNR(i) engineers drawings from Dundalk and measurements taken before demolition many years ago.

    20190313_123148.jpg

    20190313_145246.jpg

    20190314_164700.jpg.ab62135bbb691dc6353abd9114781c5e.jpg

    • Like 3
    • Craftsmanship/clever 3
  2. Far from wanting to confuse readers, the past two years has seen my attempts at building a layout fail. With renewed enthusiasm and lots of technique observed at the recent Model Railway Show at Cultra, I have built new baseboards for my new layout, built this time with a view to actually exhibiting, sometime in the future. The baseboards are almost complete, they are mobile and will be an end to end shunting layout featuring a hidden fiddle yard working to Omagh Goods Yard. The next job in hand is to cut the plywood alongside the track work and that will ultimately form my embankment. I was adamant this time to raise the entire track bed to allow a more realistic look. Here are the start of my construction pictures. The layout measures 2800 x 350 including a 700mm hidden fiddle yard. The last shot shows the loosely laid Code 75 streamline track.

     

     

    post-32997-0-35122400-1542830499_thumb.jpg

    post-32997-0-15900600-1542830519_thumb.jpg

    post-32997-0-44099800-1542830553_thumb.jpg

    post-32997-0-28761500-1542830980_thumb.jpg

    • Like 5
  3. Here is some interesting stuff I found as a good representation of coal in 4mm scale. I picked this up on an artificial grass playing field when watching my boys playing footie. It consists of small bits of rubber filler, used between the plastic grass leaves to provide a substitute for earth I believe, providing drainage and a better base for the players. It tends to migrate off the edges of the pitch over time so one can collect the odd handful. The you need to weed out all the stones, threads, dead insects and bits of small footballers.

    The net result is very good – discrete bits of a good size, irregular and in fact very coal-shaped, the right colour and variation with a bit of glint. All in all it is the best model coal I have seen. The small load in the picture weighs only 9g.

    Go and ask you local school or sports club if you can gather a small bag full.

    attachicon.gifIMG_1206.JPG

     

     

    The coal looks very convincing, I'm more intrigued by your 'single lever brake' - maybe you can let us know how you fashioned that.

  4. If I've got the correct poster 

     

    dandrews2000

     

    If you click on the link to his profile it says he was last active Nov 2017, you could try sending a message as a copy would go to his email address.

     

     

    Thanks for your response, I've tried but nothing as yet.

    I'd be interested to know if a track plan exists for the model 'Highly' that he built, it looks superb.

  5. I'm seriously thinking about hinging the section at the opening of my shed door. Although all is wired and operational, a bit of thought and work could give me a hinged flap for easier access. Up until now I never considered doing it but having seen it in use on another layout, I thought it worth considering.

  6. I've now completed all wiring and point motor wiring. These have all been brought back to a panel next my controller and switched using small toggles. Everything is running well and I hope to start ballasting in a couple of weeks. I want to make up a couple of road bridges over the lines before I do this and make some attempt to wire the track on the turntable which will be manually operated.

    • Like 1
  7. Nice set of IRM ballast wagons there, the track does need a bit of ballast down  :good: .

     

    Looking forward the seeing the progress.

     

    Mark

     

     

     

    Mark,

     

    I'll not be rushing into any ballasting. The point motors will hopefully be fitted this weekend though I'm not sure if I'll get them all wired just yet. I have to set up my operating position and think about where I want all cables to terminate. That aside, its always good practice to run locos over the layout for a few weeks before ballasting to test the running.

  8. Some pictures of progress.......

     

    IMG 2033

     

    IMG 2034

     

    IMG 2035

     

    Two additional points to be laid in the morning to extend the headhunt in one of the sidings and allow the release of the goods loco and I'm ready to start fitting point motors.

  9. I'm in Omagh where there was a couple of fantastic shops in the 1980s. Enniskillen is brilliant but they don't keep Code 75 at all. You just cannot beat TrackShack - Isle of Man.  If you place an order before 4pm it arrives the next day like magic. Postage on Flexi track, that arrives in stiff cardboard tubes is £3-£4 max.

  10. I've just completed laying the rough track work to my new layout which focusses on the GNRi anywhere on the Derry Road. Previous efforts to build anything like Omagh have failed and I have decided to enjoy the movement of my GNRi locos and stock on these lines without any influence from any station. The track consists of mainline track work, sidings, turntable and fiddle yard. Points are kept to a minimum so I can enjoy long flowing trains. Hopefully I will return with some pictures later.