Jump to content
 

Kingfisher60024

Members
  • Posts

    5
  • Joined

  • Last visited

Recent Profile Visitors

159 profile views

Kingfisher60024's Achievements

21

Reputation

  1. Just found this thread and it has made for a very interesting read! I've long had an interest in the WHL extension and various proposed terminus locations. A few years ago after reading the original idea of terminating on Loch Nevis I designed a railway route to access the Loch. Due to the hills surrounding Mallaig I chose a route that deviated from the current alignment at the village of Morar, ran along Loch Morar to Tarbet and then over the neck of Loch Nevis and onto Inverie. It would be a fairly circuitous route but would avoid the need for massive engineering other than a large bridge at Tarbet over Loch Nevis and provide access to the large natural harbour. I imagined that if it had been built then the Royal Navy would have had an interest due to its sheltered location and the WW2 commando training in the area. Keep up the good work!
  2. I've tried emailing Keith. Fingers crossed i get a reply...
  3. Anyone else had trouble contacting KR models? I'd like to chase up my Fell order but i'm having issues getting a response/reply... Cheers Rob.
  4. Good news! Third loco came today and I'm pleased to report all bits are attached and unbent! Third times the charm
  5. Had a very poor experience with the late crest J27s at the moment. Preordered one from Hattons a while back and the loco arrives with the chimney and a buffer detached along with broken brake rigging. Sent back. It's replacement then arrived with all the bits attached but the coupling rods on the firemans side bent. Awaiting my 3rd loco currently! Not best pleased!
×
×
  • Create New...