Some replacement sections of track were installed last night, the cross over section to the left of the 60, the siding opposite the platform and a small section on the run round loop.
The siding was relaid as two pieces replacing the single piece of track.
I could not close up the gap by the point so replaced it.
At last Im nearer track fixing.
Then as Im going to have dowels with wire to change the points and then ballast the track.
All hopefully during this period of working from home and self isolation.