Jump to content

Piemanlarger

Members
  • Content Count

    782
  • Joined

  • Last visited

  • Days Won

    2

Piemanlarger last won the day on November 13 2010

Piemanlarger had the most liked content!

Community Reputation

240 Good

Profile Information

  • Location
    Swansea
  • Interests
    Field Target,
    Railways
    Photography.

Recent Profile Visitors

809 profile views
  1. The track kinking culprit? ? Well it can't be my fault!
  2. Been a bit distracted with 1/16 rc tank last couple of days! Might have to sell all the trains and buy more of them lol As no 1 wife has a week off next week, it was now or never for the layout going up at home and a test run. plan B !! 3 of the 6 points now not throwing in 1 or both directions. Ok that should not be too hard to sort out as they were all working prior to ballast. One of the back man dynamis may have finally given up but I had a spare so at least there was steam heard! But somewhat deflated that the station tracks somehow have gone way out of alignment! Middle run round loop and goods loop not too bad and lined up, but station line has kinked and was about 4-5mm out ! So it's ballast sucking machine out at some point next week and track re-alignin ! I think the problem has to do with the station ramps that set a little further off set than I wanted, overnight! Still, means the layout like lockdown is not as finished as we would perhaps like ! Photo shows station rails aligned and how much out other would be. When of course it's station ones that have kinked. Other photo shows the auto coach just coming onto the kink !
  3. Good old Bob of purple things
  4. Bit more fencing done. Station Road this time! Now awaiting purplebob signs in the post. Weathered down small patches of track yesterday. Little and often / mixing shades till it looks right?
  5. Very nice work and I'm sure more to come which I for one shall enjoy seeing. Why not leave the loads removeable so if you fancy a change it can easily be done. Gives variety.
  6. Deliberately lazy day today Sorted the station ramps, now buff Bit of fencing and a " worn " tracklayers / shunter path put in. That's about it. Been looking at 1/16 Rc tanks as a diverstin !!
  7. Crossing kepeers / station master / porter house. His wife said no advertising on the side of the house Making use of an old sleeper !
  8. More jobs for today. Fencing on middle board, started from the rickety lineside hut ( roof to be weathered / rust) but have to finish installation of the water tower on the goods line before I know the fences final path !
  9. Did actually get a few things done late on yesterday. But not quite happy with them. I found the remnants of "fine buff" N guage ballast from my oo guage days. So as I had painted the " slabbed" 422 platform with a grey paint that somehow left a glossy finnish I decided to use the buff stonew to give the platform some " grip" I left the ramps as the paths leading to and from the station are also N gauge fine, but grey! So one of today's jobs is to do the ramps, again! Must say I like the purple Bob's enamel signs. Might only be a small halt station but they making money off advertising ! Track has to be heavily weathered up today around water crane
  10. Track gang been busy this morning as have the station builders. Catch point in place and just awaiting drying time between experiments !
  11. What should chip and stay alive did you use?
  12. What did you use to paint the wheels and underframe on the pannier?
  13. It seems looking at photos in my various books that a ground lever could be mounted in many different guises. So here is a simple one. 2 more to do. 3 with the catch !
  14. Sundays jobs? Where is the goods loop water tower going? 72xx checking clearance Thanks to some technical expertise I have been advised I should be installing 3 catch points. But I only got 1. So it's going in here, which is probably the wrong place as it's too near the slip but as Railway modelling is usually a compromise to some degree. This will have to do?
  15. Ramps are setting. Fillet, paint and fine ballast (for grip) later all being well. There is a technical problem that needs sorting. Unless I put the crane on the platform it needs the path diverting. Already pulled up some hedgerow so it don't look like it's going on the platform! The syringe is doubling as a Dapol signal for now. Do more diverting there too!
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.