Jump to content
 

Holby Railway

Members
  • Posts

    80
  • Joined

  • Last visited

Everything posted by Holby Railway

  1. Not sure im Bitter, Attitude was caused by a reason (i will not detail in public) im sure a consideration could be given to Travel Expenses, in exchange for the help, The Control Box for the points is now here, and as far as i can tell complete, i have the motors aswell, i obviously need wire / cable but that can be arranged at a later date, point motors will allow me to stay Analogue but get round my inability to stand and poor eyesight, if you are still willing to give me a chance you are welcome to email HOLBYCITYRAILWAY@GMAIL.COM all track work is 3 years old i bought it all brand new locos etc not new but that is entirely by the by, this is the last railway i will ever own and i want it to be the best i can manage. Previously i was held to ransom by the person that was "helping" his attitude was always "its my way or no way" with everything, its my railway not his, all the money was mine, everything belonged to me so why was it his way or no way? he is now long gone and will no longer be involved, i know what i want, and thats why im asking for help, should you be kind enough to help, you would find a great deal of work has already been done, and anything else can be discussed like gentleman.
  2. at the moment the intention i still to begin dismantling as soon as possible, but the way things are at the moment that will not be until April too many things going on, i thought it would be easier to get help, but it seems i misjudged the MR Community, i was once told appeal for help to the wider community you will have more offers than you know what to do with. Never Mind Thanx Guys HCR IS NO MORE
  3. Redditch is too far away no transport, i used to know Lodge Park & South Crest quite well, but that was 40 years ago
  4. points are all insulfrog, so they isolate the relevant parts when needed, a control box has been built for for controlling the motors, i have not seen it yet, it was built a year ago, im told to expect it and the motors to be returned in the post within the week yes i emailed them, i dont know where Solihull club is, but if i went by bus to these places its a long walk which i cant do, Warley i used to visit twice a year on the open days but Taxi is expensive plus this year i was injured and could not go, hoping for July tho, the amount of wire under the boards is not an issue, if it takes 6 months it takes 6 months, i dont know it beyond my understanding, i had an offer last March somebody reckoned they could do all the point motors in a day, but the sticking point was he wanted to fit DCC to everything, and i do not want it, he said could do all 108 locos for less than £50 total, but when i refused to go DCC he walked away....
  5. im in B16 Tried MRC at Bournville, Solihull & Warley no response after 2 wks that why i posted on here, Wiring is not as complicated as you may think being DC its just 2 wires, obviously point motors need to wired, if anybody wants to be part HCR that can be done, i have ideas that are parked for now but, of somebody came onboard (not with money) then maybe they could be looked at again
  6. looks like im gonna selll up then nobody anywhere willing to help, thanks guys HCR is no more......
  7. Boards are fixed, they are more like shelves held up by brackets, everything under the boards can be moved, Station 1 is slightly more difficult in that it on a windowsill, built up (dont know how) underneath is accessible but the front of the board (blanking boards) need to be unscrewed for access then replaced, control is by switches, a box has been built (i do not have pics) and as far as i know the box is already prepared, switches in place and wired in, power will be provided by the controller, and has been tested once to be sure all was in working order, some adjustments to the railway may be possible to accommodate motors, but that is not something assessed so far - whoever does it, will be able to say what needs to happen or not as it goes, and will find everything easily discussed and then any issues can be resolved, they will find that much groundwork has been achieved so far but now things have reached a halt Model Railways...... theres not much else is there ? 🚂
  8. Boards are fixed, they are more like shelves held up by brackets, everything under the boards can be moved, Station 1 is slightly more difficult in that it on a windowsill, built up (dont know how) underneath is accessible but the front of the board (blanking boards) need to be unscrewed for access then replaced, control is by switches, a box has been built (i do not have pics) and as far as i know the box is already prepared, switches in place and wired in, power will be provided by the controller, and has been tested once to be sure all was in working order, some adjustments to the railway may be possible to accommodate motors, but that is not something assessed so far - whoever does it, will be able to say what needs to happen or not as it goes, and will find everything easily discussed and then any issues can be resolved, they will find that much groundwork has been achieved so far but now things have reached a halt
  9. sorry guys i did not realise i had not posted enough detail, i shall attempt to correct this, firstly i have lived here 40 years so im in no hurry to go anywhere else, im only just 60 so old folks home is not an option, but then, it never will be (i hope). Right basics, HCR (Holby City Railway) is a DC 00 gauge railway (not doing DCC) ideally i would like the motors under the board but will bow to experience if they have to be above then c'est la vie, it is horseshoe shaped, with runround loops at both ends and a passing loop with sidings in the middle, i shall endeavour to attach relevant pics now, as for what type they are, im sorry i dont know, it was a job lot off Flea Bay, 28 in total, im not sure but i think we only require 22 to be connected, once i know how much wire and what sort i would purchase it so other than solder and labour all expenses should covered.
  10. recently i purchased several point motors, somebody i knew was going to do the job, over a year later its still waiting to be done, when challenged last week he said it wont be ready to start for at least another year, so i got rid of him. is there anybody on here PLEASE that would be willing to fit them for me, (currently im awaiting their return) they do not have any wiring but, if somebody tells me what wire and how much is needed it can be provided, im not expecting the work to be done free, but i do have a budget, im in Birmingham, anybody feel like helping please, i think there are 28 altogether..... There are many issues why i cant do them A) i dont do soldering B) i dont understand electrics C) i have mobility issues which prevent me standing for any period of time, thats the main reason i need point motors. D) eyesight no longer sufficient to do this type of work even if i could PLEASE CAN ANYBODY HELP ME ?
  11. really so far i have to go with 69 009, but if they dont do it, then 69 005 looks the best so far, probably for renumbering as 69 017 hoping they dont pass 69 016
  12. i believe its called "Provincial Livery" basically i had a 110 i didn't want, and somebody had a 117 they didn't want so we swapped, back2backs are fine i have a gauge tyres are fine, nearly new by the looks of them, ill check the stiffness and see what that's like, she's been stationary since she failed her test in 2022, parked in a bay, i have even tried her with the 121 at one end to make a 4 car unit but with 2 power cars, the 121 doesn't like the 117 & therefore derails when used with it, but when the 121 runs alone, she's fine.....
  13. ill reply to all in one go (easier) Traction Tyres are fine, back2backs are fine, i have a back to back gauge, she derails when pulling the other 2 cars but is worse when pushing, i've tried adding my 121 at the dummy end to create 2 power cars (as it were) this was a common sight when i lived out at Dorridge, always The Bubble leading, im sure i don't know what the answer is, i used a mixture of Bachmann & Hornby track (all brand new, oldest track is 2022 youngest is 2024), i do not think temperature is a problem as the railway is in the main room (horse shoe shaped around the outside, boards are MDF and 18 inch (45.72cm) wide not finding corridor connections anywhere, most bodies have had them removed, plus mega expensive
  14. i have a Lima Class 117 DMU bought about 3 years ago, foolishly 1 run counted as checked, but i since found problems, Corridor Connections are missing from the Centre Car, and the power bogie just will not stay on the rails, can anybody help please
  15. i have a Lima Class 117 DMU bought about 3 years ago, foolishly 1 run counted as checked, but i since found problems, Corridor Connections are missing from the Centre Car, exhaust pipes are missing (i have a lead on them) but the power bogie just will not stay on the rails, can anybody help please
  16. i have a Lima Class 117 DMU bought about 3 years ago, foolishly 1 run counted as checked, but i since found problems, Corridor Connections are missing from the Centre Car, and the power bogie just will not stay on the rails, can anybody help please

    1. woodenhead

      woodenhead

      You might struggle to get help via a status update, it's not very obvious and when four other people post their own status updates this one will disappear from any front facing forum page.

       

      Better to post in here:https://www.rmweb.co.uk/forums/forum/25-modelling-questions-help-and-tips/

    2. Huw Griffiths

      Huw Griffiths

      Fair comment.

      I'd definitely suggest re-posting in the "modelling questions" section of this site.

       

      As for the problems you've mentioned, one major issue with old Lima stuff is the "pizza cutter" wheels - you (or someone else) might perhaps be able to grind them down on a drill in a stand. Other options might include replacing the wheels or swapping the bogies for modern Hornby equivalents.

      As for corridor connections, this might depend on whether anyone's planning on "backdating" DMUs - or doing "class 121 / 122 driving trailer" conversions on outer cars. OK - there's more to this - but the corridor connections might not be needed with certain conversions.

       

      I know I'm thinking of doing some conversions in the future - but I wouldn't be much help, because I'm in a different part of the UK.

       

       

    3. Holby Railway

      Holby Railway

      Thanx for the advice

       

      its not a conversion (i dont think) at the moment ive put a BR MK1 on there as its in the middle of a set hoping it doesnt show too much

  17. Ive noticed recently on SM that several people are modelling Clans now, this set me thinking, What are the visual differences between Britts & Clans, with exception of experts would a Britt pass as a Clan in 00 gauge
  18. sorry to disappoint, i have not made a typo, my 08 is 08 880 the fact she is crapped is perfect as i only go for loco numbers that no longer exist
  19. Thank you, so now the question is did 08 880 carry this livery, i shall now leave her alone anyway as i know now at least one did carry it 😇
  20. slightly off topic, i just purchased a Bachmann class 08 (08 880) in Inter City Swallow livery, is this a spoof or did any 08's actually carry Swallow Livery ?
  21. sad news the guy that was doing my engines, has died, im now on the look out for a new guy, somebody that can do rebuilds etc,
  22. not going for a Ba****d the chassis (obtained) is being used as are the wheels, nothing else is kept, the rest is being scratch built by "my guy" starting later this year as he has 2 of mine and 6 others ahead of it, delivery expected in 2024
  23. Im hunting for 9F MUST BE LOCO POWERED, it is to form the basis of 58100 Big Bertha, body condition is not important its helpful if it works but im not greedy, Loco Powered as complete as possible with Tender, if you can help email HOLBYCITYRAILWAY@GMAIL.COM
×
×
  • Create New...