Hello! I'm getting to the Signaling part of my layout and I'm stumped. After looking at a few threads I was starting to get it, but I think I need the opinions of people who know what they're talking about. I have attached a (admittedly terrible, as the track planning system I was using wasn't cooperating) diagram of the layout as it isn't fit for eyes. I'll accept the criticisms to it, but in short it's a shrunken down attempt at a GWR branchline terminus. I was wondering what, if any, signals I may have to put in?
Thanks,
Ryan