Jump to content
 

ryanstewart2003

Members
  • Posts

    3
  • Joined

  • Last visited

ryanstewart2003's Achievements

1

Reputation

  1. Alright, I have added a bit to the diagram (I should really redo it on scarm, so I apologize for it again) and from what I gathered this is what I should be doing? It would be tons easier if the layout was bigger, I'm sure, but it's only a little over 3ft long due to space
  2. Ah yes, I should've specified that in my post. I typically run ambiguously, but if I had to narrow it down I would probably say post war era/early BR? If that helps at all.
  3. Hello! I'm getting to the Signaling part of my layout and I'm stumped. After looking at a few threads I was starting to get it, but I think I need the opinions of people who know what they're talking about. I have attached a (admittedly terrible, as the track planning system I was using wasn't cooperating) diagram of the layout as it isn't fit for eyes. I'll accept the criticisms to it, but in short it's a shrunken down attempt at a GWR branchline terminus. I was wondering what, if any, signals I may have to put in? Thanks, Ryan
×
×
  • Create New...