Hi there,
I am building my front first Judith Edge kit, a Ruston 165DS, and have got to the part where I need the bolt the floor for the cab and engine bonnet to the footplate.
Are there any tips out there on how to handle the tiny 14BA nuts and bolts, presently it is take me about 20 mins to get each nut on a bolt!!!
there must be a quicker way??
Can any one help?
thanks and Happy Christmas
Martin