No we were the very late running 4L76, basically DB took the decision to let it leave EMG after network rail promised road would be open at 21.30, I relieved at Peterborough at 03.50. after it was held back, we made it as far as Manea, waitng for the 4 in front to get remanned, 2 in front of me got Run round at Ely, as we were 100m from the Station, 66017 decided AWS was function negative and came to an abrupt halt.