I know that to some the devil is in the detail and at this price who can blame them? I'm not sure it would be right for me to request lifting this or tilting that, sandwiches on tables or sick bags when I'll be running it on my 8*4 roundy, based on a preserved line, with no overhead wires, where 3rd rail trains run along magically with no 3rd rail.