Tonight saw a milestone, the last of the track was laid and then a coal truck and a coach were run through every piece of track and all points to check for running quality; there were only 2 points where the solder had built up and caused slight lifting, the best news being no gauge-widening or narrowing anywhere at all.
The final PWay work, the shed area
From left to right from the public side (North to South)
Down the length of the layout as looking from the South
Down the length of the layout looking from the North
Next week will see the trackwork across the baseboard join cut through and the baseboards separated for the first time in several months.