Jump to content
 

Badger's Cross 2. Modern image DCC layout.


Thesmudge
 Share

Recommended Posts

I spent some working on the layout this weekend. I have added a couple of point motors to the lower section and then added thin boards to the upper level so that I could create a loop and test the track. In the areas where I don't need access to the lower level I have added the final boards and have started to lay the track and some scenery in this area. Also created a lift out section on the lower level to make it easier to get into the room.

Edited by Thesmudge
  • Like 5
Link to post
Share on other sites

I have completed a little bit more this week, I took the old platforms from Badgers Cross, cut into two added a strip of extra material and then filled the gaps. I think the wider platforms look more realistic (or they will once the station has a roof and details added).

 

D328529F-C542-4893-B690-8B808BD1D2FB.jpg

 

E74F7B6A-D80A-4001-A190-F138F849F4E2.jpg

 

301EA3EF-F3AC-44A2-A8E8-17315B35C5EC.jpg

 

2C67F557-0ECE-415B-BCAF-0AFB872A7F2F.jpg

  • Like 8
Link to post
Share on other sites

Me and my brother have taken the day off work to crack on with the layout. I managed some time over week evenings to erect the back scene boards and paint them sky blue.

 

The area and scenics around the station was just placed for today to gauge ideas and make for more interesting photographs. We heavily tested, tweaked and improved the running of the layout. There were a few issues that presented themselves during the testing, certain wagons or loco's would have issue at certain areas so we tried to test as much rolling stock as possible. (Issues ranged from ballast on a point caused derails, a small area of track was out of gauge tolerance and a carriage would ride up and detail and we had a couple of areas where board heights were a 1-2mm different and the track needed a bit of folded paper adding to help the transition.) pleased to report that the helix's were trouble free.

 

78C280B8-748B-4504-8560-B03DCFB69024.jpg

 

4A3E2413-27D1-4A1E-8640-219CD2D06E93.jpg

 

F5160139-86F6-479A-865A-8EFB3DE0FF8A.jpg

 

2535A7F4-CDD0-45CC-8557-F7113979E5CD.jpg

 

35FFDA3F-9F2E-4DF9-B703-58E53F037A38.jpg

 

E44F7298-DEC5-4510-B986-2CAD7DCD6140.jpg

 

4FE4D310-5BAD-420D-A9B2-0579947AF68F_1.j

 

70AD8662-D1FE-452B-A783-E4920B98B2B6.jpg

 

52F16BDC-6603-4D11-9C8E-738CF944363D.jpg

 

A0BFB9EC-D914-4AD2-99AF-0A2C606A14A6.jpg

 

CC719791-E26E-42F1-A152-5412969C3624.jpg

 

 

7A437542-87B5-4878-B49A-AF65049B7A4B.jpg

 

D75E6AFE-88D0-49B8-AC6A-D3B8BD944FB8_1.j

 

A6262814-C470-4601-8757-77C2BD6C0503.jpg

 

C8BED4E9-3EC7-4BD2-811B-5C6C6ACF4EAB.jpg

 

9D8B7051-42A0-4FA7-9DD8-35AEBA6BC4F8.jpg

 

5BFF5FB2-399B-43CB-A1D6-A6E8A699ACB6.jpg

 

AB16CF76-5A30-48BE-840E-7607395FF81B.jpg

 

4D8E47D3-FE81-41F9-9E62-55326524B3D9.jpg

  • Like 6
Link to post
Share on other sites

O.M.G.     What a wonderful ' mancave' .......'bunker'........'escapist room' .........model railway studio even. 

 

Wow what a layout developing here and with such speed......do you have time to attend any form of employment  :jester:

Amazing those helix and just amazed as to the way you have just gone ahead and built them , what sort of haulage are you getting upwards etc Not sure how you would deal with a major incident on them though. !!!!!

Will follow with great interest as I feel that a couple of helix on my forth coming Chester Northgate layout is the way forward in dealing with junction and triangle formation. 

 

Keep up the excellent work and I hope the music is played loud and proud  :sungum:  :sungum:  :sungum:

  • Like 2
Link to post
Share on other sites

Thanks for the kind comments, both of the helix have access for a person to stand in their centres and collect any stock. The gradient is shallow respectively, so far we have not found the limit, on the previous Badgers Cross we had ramps with twice the angle and these would allow quite large trains!

 

As for work, I enjoy what I do and have always followed this ethos: Work hard, play hard.

  • Like 2
Link to post
Share on other sites

  • 2 weeks later...

Over the last couple of weeks I have bought some new points and started to fix the yard area down. I also added a couple of sidings close to the station, these are the programming tracks. We had a small running session this morning unfortunately not many pictures were taken but one of my new class 60.

 

2C129A24-7373-4AFE-A293-99280DF3C1C3.jpg

 

29110C93-AFD3-4394-A5D9-DE92667E0668.jpg

 

7B2EB296-1BDA-420C-A31E-E89CD64D3617.jpg

 

F82186C9-E6ED-465D-BEE2-933DD963C431.jpg

 

EF724997-64E9-4207-A217-E9B423314E72.jpg

  • Like 6
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...