East Coast Mainline Blockade for Werrington Junction diveunder


Recommended Posts

I am also please to report that the  'podium' actually works.:crazy:

IMG_4739.jpg.05c57fbe85f2eba7f4557ca91a1af0e2.jpg

 

I managed to dismount from my horse, ungracefully.

IMG_4753.jpg.f66b0cde1b7ab1f4b611431d72d887dd.jpg

 

Then collect my medal for achieving fastest speed over the new rubber.........

IMG_4749m.jpg.753bf1c7c1b40ea003033b8cef803b23.jpg

 

........only to come to grief descending the steps.:jester:

IMG_4750.jpg.13b4e030ae98e5e40f55173e7de4ce06.jpg

 

 

  • Like 3
  • Round of applause 1
  • Funny 4
  • Friendly/supportive 4
Link to post
Share on other sites

2 hours ago, chris p bacon said:

Was there a round of applause from the Orange army :D

 

A nice member of the orange army took the photos.  They are a great bunch of people, always ready and willing to share info and have a laugh.:friends:

 

Another snippet of information confirmed today is that there is to be a retaining wall built opposite the one under Hurn Road bridge, so quite a lot of future piling to do.

  • Like 3
  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Premium
2 hours ago, Fat Controller said:

Probably York.

I think it's still possibly Peterborough, but bearing a "route" plate rather than a simple "P"

The Peterborough boundary is (was?) at 82m 20ch or just under three miles up the line.

Link to post
Share on other sites

  • RMweb Premium

Based on ess1uk's latest comment, I've done a bit more digging. It would seem my earlier suggestion of (probably) Peterborough (or possible future control from York ROC) is incorrect. WS7005 is the first signal on Lincoln SCC WS workstation on the Down Spalding.

  • Thanks 2
  • Informative/Useful 2
Link to post
Share on other sites

2 hours ago, dvdlcs said:

Wonder if they are going to clean up the graffiti that is on the bridge piers before they leave site?

 

No, it is not their property.

It has been mentioned locally about brightening up the John Clare mural on the north side wall between the two bridges of the A15.  I will see if I can find out whether this still on the agenda.

 

< I fell off my horse a few posts back but I've got on my high horse this time for a rant>

 

If I had my way I would eliminate those morons from society that spoil our landscape.

Since the lockdown this year when a lot more people have been out walking and cycling the amount of litter around this site, lanes and cycleways has increased substantially.  The bridges are strewn with discarded food and wrappers, cans and plastic drinks bottles.  In this hot weather they basically stink. :bad:

  • Agree 1
  • Friendly/supportive 3
Link to post
Share on other sites

Some photos today from my roving reporter friend.

 

New access road/path coming towards Marholm Brook/west side of Cock Lane footbridge.

DSC_1635.jpg.149ebf94d3721110cecca3d7ebd6da81.jpg

 

Drainage on the east side of Cock Lane footbridge nearing completion.  The land around it will need building up quite substantially.

DSC_1644c.jpg.f9f3544ee78959de0b67dc78d400463f.jpg

 

Some heavy road/rail gear getting ready for the weekend, more near the trees in the background of the photo above and half a dozen flat rail trolleys

DSC_1643.jpg.81dcd0f00aa6164249c6d6e28f3f6c14.jpg

  • Like 4
  • Informative/Useful 5
Link to post
Share on other sites

  • RMweb Premium
58 minutes ago, Donington Road said:

 

 

 

If I had my way I would eliminate those morons from society that spoil our landscape.

Since the lockdown this year when a lot more people have been out walking and cycling the amount of litter around this site, lanes and cycleways has increased substantially.  The bridges are strewn with discarded food and wrappers, cans and plastic drinks bottles.  In this hot weather they basically stink. :bad:

Probably so do the miscreants...:)

  • Like 1
  • Agree 2
Link to post
Share on other sites

Saturday 8th August. The arrival of a crane and trucks. Photo's from around the A15 bridge, Hurn Road bridge and the temporary footbridge:

20200808_091758.jpg

20200808_091811.jpg

 

20200808_100832.jpg

20200808_101400.jpg

20200808_101933.jpg

20200808_101851.jpg

20200808_101345.jpg

Edited by Crun
  • Like 7
  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Premium

Some more from me from the past two or three days.

 

Where the lines cross Werrington Brook the precast concrete wall that is slotted into the girders is complete.

 

IMG_9822

 

And as Mick posted the drainage works by Cock Lane Bridge were being completed whilst I was there with the manhole covers being concreted into place.

 

IMG_9826

 

The shuttering is up for the bridge abutment on one side of the new Lincoln Road bridge, the young lady climbing down appeared to be in charge.

 

IMG_9827

 

Then from todays possession we can see, just in front of the 66, the section of track to be removed and replaced with a switch and crossing. It looked to me as if the cuts have already been made in the rail, the Kirow crane looked as if they were getting ready to lift the section out.

 

IMG_1500

 

IMG_1501

 

IMG_1502

 

And finally Mick had highlighted, in the last three or four pages, some instructions chalked on the rail, well there's a bit more on there now, the first word is disc and seems to tie in with where the switch will be cut in for the junction.

 

IMG_9831

 

The farmer has started to cut the crops in the field but, without permission, I'd still not walk across to the boundary fence.

Edited by Richard E
  • Like 9
Link to post
Share on other sites

Glinton Junction mid afternoon Saturday and still no track lifted.  Plenty of toing and froing with the crane.  The 66 has been parked under Lincoln Road bridge since early morning, engines still running but no movement.  The crane had left one of its trucks behind at the junction and retreated back to Hurn Road then the track machines came out in force so it looked as though some serious action was imminent as I left.

 

Information from the track gang this afternoon, laying of Marholm Junction is scheduled for week 9 and week 16 next year.:good:

 

IMG_4766c.jpg.ae65fe3e45eaada5dc8c870bba335e98.jpg

IMG_4777c.jpg.b5fe83e7ba25a2c99897a69e37427fc4.jpg

IMG_4788c.jpg.fa034a8f7b0b5da3035e102a99fa7b7c.jpg

IMG_4794c.jpg.04e809c437aa20c34290bbc1167dc72b.jpg

IMG_4797c.jpg.a0a30c5280849a411786a588cb0bef17.jpg

IMG_4798c.jpg.856b3ab5cc35bf8209e26748789132a4.jpg

IMG_4801c.jpg.05959b3379c9d79bbadd00ab62dd8c96.jpg

IMG_4802c.jpg.76dd4c252ca28496ba9f5b036230666b.jpg

IMG_4804c.jpg.bc7b20ef8c89ca40f17231acdcf1bd43.jpg

IMG_4813c.jpg.dba42e9b7deab243b23717c3bf6d4689.jpg

IMG_4819c.jpg.5c8b3cf0c6fe24df046e1f91e885df41.jpg

IMG_4826c.jpg.0c73bde970fb7d96d98e4090614deae6.jpg

 

 

  • Like 7
  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Premium
1 hour ago, Donington Road said:

 

Information from the track gang this afternoon, laying of Marholm Junction is scheduled for week 9 and week 16 next year.:good:

That would seem to be more complex than Glinton Junction as they have to move the up Stamford and connect that in as well

The down Stamford would be simpler

I assume a new Up Stamford will be laid whilst the old one is still in situ as they did with the original diversion.

  • Agree 1
Link to post
Share on other sites

9 minutes ago, melmerby said:

That would seem to be more complex than Glinton Junction as they have to move the up Stamford and connect that in as well

The down Stamford would be simpler

I assume a new Up Stamford will be laid whilst the old one is still in situ as they did with the original diversion.

 

That would be the obvious solution to us but we have been out-foxed many times in the past.:scratchhead:

  • Like 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...