Lincoln Road/Glinton Junction today.

Working on the electrical cabinets at Glinton Junction.

 

IMG_9570c.jpg.7d7362cfcfe4a57726cf6aaf6c9c97b8.jpg

 

A lot of electrics in the six foot.  The back of the 60mph sign for entering the Junction is on the extreme right.  The green bridge top centre is Foxcovert Road footbridge, the brick one beyond it carries the A15 southern bypass from Glinton to the Paston Parkway.  The new signal which is nearer to the brick bridge than Foxcovert Bridge controls the existing Up Line from Spalding and entry to Glinton junction for the dive under.  This now comes under Peterborough PSB control, whereas previously this stretch was controlled by Lincoln.  Lincoln control now starts just this side of Foxcovert Road for the Down Line (the signal is hidden just beyond the Junction by the trees).  Lincoln controls the Up Line as far as Folly Bank (Peakirk).

 

IMG_9570b.jpg.7a0c250d57109c08ede76fa6480bbd9a.jpg

 

The re-instated field is getting wire mesh fencing alongside the reduced width access road.  More black drainage pipes have appeared this week, a truck loaded with smaller diameter pipes was delivered this afternoon.  Not sure where they are intended to go.

 

IMG_9570a.jpg.d2fee9210b36bd6de4d4b382ac2ec9e1.jpg

 

Near to Lincoln Road extra drainage channels were put in to the embankment last week, where the soil has been laid bare.

 

IMG_9571c.jpg.cba685e36edfed1e55763965898d1170.jpg

 

The top soil creeps ever closer.  The extent of the fence posts put in so far, along the access road can be seen in the background.

 

IMG_9573c.jpg.d2bed100dfbda5967e70e828eabeec66.jpg

 

Under the A15 bridge (the northern A15 route from Glinton into Peterborough, Werrington Parkway), showing the back of the new signal that controls the Down Line from the dive under to Glinton Junction.

Interesting how the ground ducting terminates and the wires then carried on the deflection wall.  All that room under the bridge and someone forgot to allow enough room in the cess for the ducting.

 

IMG_9572c.jpg.9e40f7bcf186b0023a83700252291d07.jpg

 

 

 

 

  • Like 8
Link to post
Share on other sites

14 hours ago, rodent279 said:

Does anyone know what the gradients are in the dive under?

 

From Marholm junction

  • 1:337 falling for 345m
  • 1:271 falling for 165m
  • 1:112 falling for 781m
  • 1:155 rising for 899m
  • 1:124 rising for 330m
  • Level for 190m
  • 1:370 falling for 135m

To Glinton junction

 

Line speed is 60mph throughout including both junctions.

 

  • Thanks 1
  • Informative/Useful 7
Link to post
Share on other sites

2 hours ago, Shwam3 said:

 

From Marholm junction

  • 1:337 falling for 345m
  • 1:271 falling for 165m
  • 1:112 falling for 781m
  • 1:155 rising for 899m
  • 1:124 rising for 330m
  • Level for 190m
  • 1:370 falling for 135m

To Glinton junction

 

Line speed is 60mph throughout including both junctions.

 

 

Thank you for that info.

No wonder I was way out at 1:80 .  I guesstimated the distance as 800 metres from Marholm Junction to the dive under south portal from Cock Lane bridge, 600metres north + 200metres south.  That was 500 metres short of the actual distance. :O   I must stop viewing it through the telephoto lens and get a better perspctive.:pilot:

Link to post
Share on other sites

Off topic but ECML related: 

Modern Railways has reported that one of the factors behind the delay to the ECML May 2022 TT change is power supply issues at Grantham North FS & Retford FS, with WPD.

  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Premium
1 minute ago, Phil Himsworth said:

Western Power Distribution?

 

Grantham and Retford aren't very west, but maybe...

 

WPD are the power distributor for ....

 

 

... the East Midlands!

  • Thanks 1
Link to post
Share on other sites

  • RMweb Premium
3 hours ago, Richard E said:

 

WPD are the power distributor for ....

 

 

... the East Midlands!

and the West Midlands and the South West and South Wales.

Being based in Bristol, the name rather fits.

Link to post
Share on other sites

9 hours ago, Crun said:

Off topic but ECML related: 

Modern Railways has reported that one of the factors behind the delay to the ECML May 2022 TT change is power supply issues at Grantham North FS & Retford FS, with WPD.

"Power problems delay £1.2bn East Coast upgrade | New Civil Engineer" https://www.newcivilengineer.com/latest/power-problems-could-delay-1-2bn-east-coast-upgrade-24-08-2021/

Link to post
Share on other sites

  • RMweb Premium
4 hours ago, Crun said:

Saturday 28th June

Views from Lincoln Road bridge:

20210828_110536.jpg

 

20210828_110542.jpg

 

20210828_110551.jpg

 

20210828_110733.jpg

 

20210828_110736.jpg

 

Nice time machine there - 28th June didn't look like that nor was it a Saturday!

Edited by Richard E
  • Funny 4
Link to post
Share on other sites

Something going on where the land bridge was removed across Brook Drain North.

Some hardcore has been put down the embankment and some long beams and flat sections were being placed near the bottom edge of the drain.  Unfortunately I could not see very well as the reeds were obscuring a good view.  A lot of dumpy bags full of materials and plenty of those concrete barriers.

 

IMG_9639cc.jpg.12fb1dc6d324d9805dd8ef30513dbb0b.jpg

 

IMG_9639c.jpg.755dc4ed85d7958837ff0b04d07f244e.jpg

 

905422357_Snapshot-2c.jpg.50432549cbb3045e729444534507fb1d.jpg

 

IMG_9641c.jpg.0755ebac1e78426dd65c90ed0bf945b5.jpg

 

The new Brook Drain is looking far better than the old drain which was stagnent for most of the time.  Plant life is thriving and wildlife seems to be enjoying the new environment.  Well done Network Rail for creating a nice habitat.

IMG_9650c.jpg.ffa667d84ae0943bf793bb82215ee663.jpg

 

IMG_9653c.jpg.45b3cee91e6c6e92f24ae5396218e430.jpg

 

 

 

 

  • Like 17
  • Informative/Useful 1
  • Round of applause 1
Link to post
Share on other sites

The fence has been removed between the two fields (near the dumper) at Lincoln Road.

 

IMG_9697c.jpg.36f580bf2275fa4ad29f0546d5b1dd6c.jpg

 

The dumper was off to collect another load of weeds and undergrowth that is being grubbed out from where the fence was.

It was being dumped near to the site entrance.

 

IMG_9700c.jpg.5841b8daeb13c7d0494c787d99945840.jpg

 

The concrete barriers where being removed.

 

IMG_9699c.jpg.5657b6a4c5f0146ad1eeab4edc9ea050.jpg

 

Waving goodbye to the large dumper at Lincoln Road.

 

IMG_9696c.jpg.afef3ede76766707248b2f406e1cfcec.jpg

 

The S&T gang having a break at Hurn Road.

 

IMG_9698c.jpg.ad12bf4d05a1c9307a096b801b6ff204.jpg

 

 

  • Like 14
Link to post
Share on other sites

11 hours ago, Richard E said:

I see the fencing at Hurn Road is still incomplete.

 

Yes, there is a lot fencing still to be done all over the site.

The Cock Lane footbridge is also closing for seven weeks according to this notice that Trackside ECML sent me this morning.

 

2021-09-03_001.jpg.26f4620f0e0a9661d8270ec87968f641.jpg

2021-09-03_002.jpg.d8325b9c588ae915e9dae932bf8949e5.jpg

 

2021-09-03_003.jpg.e9b22b93f2f8eedd8ef7a1333bbe1ef5.jpg

Edited by Donington Road
added two images
  • Like 3
  • Thanks 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...