Jump to content
 

Tumut Railway Station


faulcon1
 Share

Recommended Posts

Tumut Station opened in 1903 and closed in 1984 and is further down the same line from Gundagai. It's the terminus.

The photos are:

The railway side of Tumut Station

The former load bank

In amongest the trees is the remains of the turntable. No iron horses come here anymore but real horses keep the grass down.

A ground frame with platform

The former station masters house

A plague explaining the restoration of the station and who funded it

The back of the station building. The red plastic fire hose reel cabinet, silver fuse/circuit breaker box and ground mounted air conditioner are modern additions

The notice telling of the foot warmer bottle heater one of the few remaining in NSW

The foot warming apparatus

The goods shed. This structure may have been moved from Gilmore the junction of the Tumut and Batlow lines

The platform line at Tumut now with the 4' paved to turn it into a walkway.

People have tried to run trains in the 1999-2000 era but it failed due to lack of interest.

Tumut is about halfway between Sydney and Melbourne. The Snowy Mountains Hydro Scheme is centered on Tumut. 

post-19545-0-65280100-1466475531.jpg

post-19545-0-36878400-1466475567.jpg

post-19545-0-45220700-1466475616.jpg

post-19545-0-63851200-1466475644.jpg

post-19545-0-33062200-1466475677.jpg

post-19545-0-20966600-1466475713.jpg

post-19545-0-27034000-1466475739.jpg

post-19545-0-26550200-1466475771.jpg

post-19545-0-93753200-1466475808.jpg

post-19545-0-57411600-1466475849.jpg

post-19545-0-53608600-1466475900.jpg

  • Like 2
Link to post
Share on other sites

Tumut Station opened in 1903 and closed in 1984 

 

......

 

A plague explaining the restoration of the station and who funded it

 

Is the first a result of the second?   :angel:

Link to post
Share on other sites

  • 2 years later...

Is the first a result of the second?   :angel:

Forgive me, I don't know what you mean. The whole line closed in 1984. A government decision that effected many railway stations and lines all over New South Wales. Rail freight transport is in serious decline in NSW and the trucking industry is in it's ascendancy with nearly all goods that once went by rail now go by road truck, mostly in what we call double "B" trucks. On the Sydney to Melbourne main line the line takes a snaking course which keeps speeds down. The Sydney Melbourne Motorway is a four lane road and in places a five lane road where you get three lanes in one direction for a steep hill. Double B trucks almost have the motorway to themselves in the night hours.

Often branch lines failed due to low speeds. The track work was often of 'Pioneer Standards" using light rails and often just dirt for ballast. As roads became better and cars got faster the rural branch lines just couldn't compete. The Tumut branch line is just one such line. But many a branch line is still there gradually being taken over by nature and in years to come large steel girder bridges will be demolished due to the effects of time, weather and no maintenance.

Some lines are only seasonal being used for wheat trains where locos are branch line types running at very slow speeds due to lack of permanent way upkeep.

The government's decision to close the lines wasn't called a defeat, but a strategic withdrawal. The same thing.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...