1 hour ago, young37215 said:

 

A fair and valid point. To maximise the longevity of the transfers I want to seal them, maybe I will settle for a splash of matt varnish rather than try and blend the weathering. 

 

 

... taking care not to 'seal in' any of the adjoining weathering; just in case.

 

I too use a matt varnish to seal in my transfers, however I've not reached the heady heights of weathering as of yet.

 

Share this post


Link to post
Share on other sites
Posted (edited)
On 15/06/2020 at 18:42, Eddie R v2.0 said:

I spent most days in the summer either down at the station or out at my Granny’s in Taynuilt! 

 

My mothers parents lived in Bath. From their top floor I could see the main line to the east and I spent a lot of time watching the last of the western region hydraulics and the class 50,s that replaced them through binoculars.

 

Yesterday saw the airbrush get an outing. I varnished all bar 2 of the cleaned and renumbered coaches which were returned to the layout once dry. The 6 fixed formation rakes of coaches are just about completed so I could start running trains again. New 37085 was finished off and returned to the layout for operations.

 

 

8DB83B44-EADD-412A-904F-D87183F6EF2D.jpeg.9764ab8bfa7564af0f2fa116c2243838.jpeg

 

Edited by young37215
  • Like 7

Share this post


Link to post
Share on other sites
Posted (edited)

Today’s efforts were to finish the renumbering of 37175. Formerly 37192, loco has been cleaned, had a new nose end fitted, replacement Hornby class 50 oval buffers added as well as new number and data panel transfers. MU cables have been added but as with other locos, bufferbeam detailing will only be added once non tension lock coupling solution is in place. A little strategic weathering is still required to blend it all together together with a Matt varnish sealing of the new transfers. These can wait for the next air brush outing, the loco is back in traffic bringing the fleet up to full numbers. 

 

9B0099BF-7360-4206-9FBE-9F23A69CF642.jpeg.76c4737bf3b3f3e588065f228df6ed3d.jpeg

 

7931D2D0-350E-41FE-8A7E-12E8DB401356.jpeg.fca520f3381c751c0f3bf8d41bebea27.jpeg

Edited by young37215
  • Like 6
  • Craftsmanship/clever 2

Share this post


Link to post
Share on other sites

A quiet week with the pleasant weather resulting in more time spent outside. I want to finish off the renumbering programmes of coaches and locos so that I can run trains again should I choose. All of the coaches are now finished and back on the layout after a couple of hours with the airbrush and some hand painting. I have 2 locos left to clean and renumber but there is no urgency as they are both currently available for service. I managed to acquire a second Mk 3 sleeper which has entered service following a light weathering.

 

Renumbered BFK has had its chassis and roof lightly weathered 

733839305_270620020.JPG.fe540a1a4048d1b0c880a12381802ff4.JPG

Renumbered Hornby BSO received a similar treatment

1700830994_270620022.JPG.68ca0e0c2f2c12bc38a64216b693002a.JPG

The second Mk 3 sleeper after weathering

953479178_270620023.JPG.5307b88a0236d714c7c4de48c5602509.JPG

Hopefully the answer before the questions start, the reason why none of the previous coaches have their wheels. I hand painted the wheels with Railmatch sleeper grime.

571160917_270620017.JPG.4654d63b22360e4cc13df20baeb340f7.JPG

A completed rake at Mallaig awaiting departure with the first southbound train of the day. 

292778235_270620013.JPG.20b9744170ac44c2f206fa714a6c479b.JPG

  • Like 10
  • Agree 1

Share this post


Link to post
Share on other sites

I use a Megapoints network to operate servos for point and semaphore control. I like the look of Megapoints custom control panels but what I need for 6 stations and 2 fiddle yards exceeds the capacity of my bank account. I constructed a trial panel out of 3mm plywood that I had lying around and was pleasantly surprised with it to the extent that I made a second panel in exactly the same way for the upper level section. What was a trial has lasted over 3 years and has become part of the layout functioning very effectively due largely to the simplicity of the Megapoints system. When everything is finally connected I will have around 75 servos in operation.

 

I have never been happy with the pencil lines that I drew on the plywood detailing the track layout of the stations because they are too thin and not as visible as I would like. I am trialing some 3mm black tape which is much more visible but a pain in the rear to fit. I am in two minds at present, I think the tape is the way to go but I am struggling to get the necessary motivation to do all 6 stations and 2 fiddle yards

 

Fort William station marked using a pencil

873183729_270620050.JPG.705ddd7d4fbf448c9000d273d17fd4e8.JPGMallaig station with the pencil partially covered using tape 

535540629_270620049.JPG.9b823deb7e612353c7e7aaaf1e4eb9d7.JPG

 

  • Like 3

Share this post


Link to post
Share on other sites

A new batch of servos finally arrived from Hobbyking today which will enable me to finish point and semaphore automation.  I ordered the servos in late January but they were delayed due to the coronavirus outbreak. Now all I have to do is fit them….

 

I could not resist giving the air conditioned sleeper consist an outing to check everything is working as it should. It was photographed passing through Garelochead with 37175 in charge.

 

1881270155_270620031.JPG.4bfa68d3c7011136b13c309435575ca1.JPG

146766877_270620036.JPG.2b844688974a82e9f9a967fc4608b4e7.JPG

 

2022015584_270620034.JPG.12e555d2da80e4c2dec0c3753d1c5d00.JPG

 

1729138695_270620040.JPG.2c0261956f95777b97218b89b9f6bf77.JPG

 

2140961043_270620046.JPG.51f9573e58635405d4a47144b0734d8a.JPG

  • Like 8

Share this post


Link to post
Share on other sites
On 28/06/2020 at 19:21, young37215 said:

*snip*

 

I have never been happy with the pencil lines that I drew on the plywood detailing the track layout of the stations because they are too thin and not as visible as I would like. I am trialing some 3mm black tape which is much more visible but a pain in the rear to fit. I am in two minds at present, I think the tape is the way to go but I am struggling to get the necessary motivation to do all 6 stations and 2 fiddle yards

 

Fort William station marked using a pencil

Mallaig station with the pencil partially covered using tape 

535540629_270620049.JPG.9b823deb7e612353c7e7aaaf1e4eb9d7.JPG

 

Rob,

 

What you need is some of that 'old fashioned' tape; that they do seem to still sell on Ebay:good:! It's called LetraLine. There is (was?) a French version called 'normatape'. They come of self-dispensing rolls and are flexible enough to go around curves (but not corners:banghead:).

 

I have a stash of these from 1989 when I used them to 'colour up' the third-rail sectioning diagrams for Singapore MRT Phase 1/1A. The resulting framed drawings were hung on the wall of the Power Control Rooms. I wonder if they are still there?

 

LetraLine:

20200629_195127_resize.jpg.92793702222acb1ad368e272cd3cc5ef.jpg

20200629_195147_resize.jpg.a6702a8daf75f0731fc825efab36790d.jpg

 

normatape:

20200629_195110_resize.jpg.5745ca04eb7a05531bad285720064652.jpg

20200629_195200_resize.jpg.49ada2a6e594cd0e0d69f045267b47d0.jpg

 

Alternatively, draw up the layout in your favourite Drawing software, print it out, and apply over the panel. That's what I did on my layout, as shown in 

 

 

  • Like 1

Share this post


Link to post
Share on other sites

Interesting thoughts from Ian, I may well return to the suggestions if I don’t get on with the tape I have bought.

 

My main task at present is getting Fort William to a condition where I can reinstate the station on to the layout. Following the mess created previously and in the hope of avoiding a repeat, I washed the remaining ballast and was amazed by the amount of dirt I removed. It took about 10 rinses to get to a stage where the ballast looked clean enough to use.

E3CB27FB-F42A-46F8-8ED9-2DA1A2C4CA3C.jpeg.26d6310c426ba6763756c28fdc1629bb.jpeg

 

The track has received a second coat of sleeper grime and looks much improved for it. The base for the service platform has been attached and ballasted in place.

 

5477DD1D-A8E2-49EE-8AFA-7306BE0E20C4.jpeg.1e573e387ebebd3ecf5bf16582fa7d1d.jpeg 

I have added a plywood screen to the rear of the station on to which I will paint a backscene. 

7CD4D096-F113-46B5-B57D-955CA4CDFA09.jpeg.075a47c52891690324486eab044e785d.jpeg

By this evening I had managed to fit the platform lights and wire them up so that they all worked when switched on. Tomorrow I aim to glue the platform in place and ballast the residual areas with nice clean ballast. In theory all that should then remain to finish the task is a little blending of sleeper grime on the new ballast and the station can go back on to the layout.

  • Like 9

Share this post


Link to post
Share on other sites

I’ve upgraded similar panels by laying paper over and marking all the switches and lights then scanning it and overlaying the picture with lines and text. Then I use a known dimension I’ve marked on the ‘rubbing’ to scale it, delete the picture of the rubbing layer and print it. Then you can laminate it, or just print another if it gets damaged, to protect it and cut circles around the controls / lights so they show. 
Still enjoying the thread and keep thinking I’d like to do something similar as a portable layout with three stations for my Scotty 37’s! 

  • Thanks 1

Share this post


Link to post
Share on other sites
Posted (edited)

In the early 1980’s Cornish china clay was delivered to the Wiggins Teape paper mill at Corpach by rail. From 1984 this was delivered in PRA wagons, prior to this ancient 5 plank, wooden bodied 10’ OWV wagons were used. For WHL4 I have 4 of the excellent Kernow PRA’s which I intend keeping in pristine, as new condition. I am currently attempting to create a rake of 4 OWV’s which will be at the other end of the spectrum being heavily dilapidated and filthy dirty. Following comment on

I bought a triple pack of Hornby 5 plank wagons and changed the spoked wheels for 3 hole disc ones. The wagons have been weathered using Railmatch frame dirt and weathered black colours as a base and an off white aerosol china clay top coat. All that remains is for me to decide on construction the tarpaulins used to cover the china clay.

475083742_270620048.JPG.7147153ab95d3f6ba02089483983f079.JPG

1426353176_270620047.JPG.8537cc088281f71d842e6b7b9582a64c.JPG

65A6BAC6-5B1F-497A-85D8-15B6E72DF49D.jpeg.a534efe473766705c6f7a6f947f056b6.jpeg

15CCCC51-394B-49EA-8E5C-53E60E40529B.jpeg.0a0745ebc49097854b4b876b955e3ba2.jpeg

Pristine PRA's are a contrast

 

115D7E84-9680-4726-BE42-1C40CCD77BA9.jpeg.489c84a6399f27fb340e1a03a25770f8.jpeg

 

Edited by young37215
  • Like 2
  • Informative/Useful 1

Share this post


Link to post
Share on other sites

Rob,

 

I reckon we could prepare an overlay for you panels and once we get the drawing correct we could print it, laminate it and stick it over the current panel.  It would be worth a try.

 

Doug

Share this post


Link to post
Share on other sites
Posted (edited)

Fort William continues to be the focus of my attention. It’s taking longer than I had hoped but that’s nothing new. Yesterday I got to the stage where I was happy to secure the main platform in place. The gaps in the ballast were filled in and my usual dilute PVA water mix was dribbled on. This morning all seems well so I continued with the backscene and now have one of two panels completed.

 

The platform lights all worked prior to the platform being glued in place. The lights have'nt been secured in place yet hence they are not straight. 

373293770_020720016.JPG.5774a00af116b4817d605f887ec1ba02.JPG

The services platform has been painted and ballasted

2062211392_020720031.JPG.eb13a4676754e8d90407cf9604118585.JPG

The main platform ballasted in position

586111056_020720021.JPG.3739119d3c9268a73ca77c3c5622c26a.JPG

The platform canopies were placed for testing, they will be secured later.

1437152207_020720032.JPG.797665a48e2a093e3d754a329cf3632f.JPG

An end board has been added and part painted to mimic the station building. This will get finished off once the paint is dry. 

1606296131_020720033.JPG.1f8b820b0ca6648751a27e9ad1b9332a.JPG

The staff car park that adjoins the platform is under construction.

192728553_020720037.JPG.354a61608a7b2cffb6dc29a1379b34bc.JPG

 

Edited by young37215
  • Like 8
  • Agree 1

Share this post


Link to post
Share on other sites
On 02/07/2020 at 15:35, young37215 said:

Fort William continues to be the focus of my attention. It’s taking longer than I had hoped but that’s nothing new. Yesterday I got to the stage where I was happy to secure the main platform in place. The gaps in the ballast were filled in and my usual dilute PVA water mix was dribbled on. This morning all seems well so I continued with the backscene and now have one of two panels completed.

 

The platform lights all worked prior to the platform being glued in place. The lights have'nt been secured in place yet hence they are not straight. 

 

The services platform has been painted and ballasted

 

The main platform ballasted in position

586111056_020720021.JPG.3739119d3c9268a73ca77c3c5622c26a.JPG

The platform canopies were placed for testing, they will be secured later.

 

An end board has been added and part painted to mimic the station building. This will get finished off once the paint is dry. 

 

The staff car park that adjoins the platform is under construction.

 

 

Rob,

 

Have you made this station 'removable' from the layout, or is this its final position? If it's removable, then I'm impressed that you can manhandle such an, apparently, long baseboard.

 

Share this post


Link to post
Share on other sites
Posted (edited)
10 hours ago, ISW said:

Have you made this station 'removable' from the layout, or is this its final position? If it's removable, then I'm impressed that you can manhandle such an, apparently, long baseboard.

 

Short answer is yes, the 2.7m long, 300mm wide section is removable as are the other two sections on the upper level of Mallaig and Mallaig Junction fiddle yard which are of similar lengths. This is of necessity so that I can access both sides of the baseboards to work of them. I dont envisage any of them being moved on a regular basis but I know that I can access them in need should a problem arise. The boards are 12mm chipboard with 30mm deep, 12mm wide batton screwed along each side so as to provide stability. The upper level is elevated above the main baseboard by the use of 100mm high pieces of wood placed at a 90 degree angle onto which the baseboards sit. 

58BCDE3E-FA93-4884-8430-F11D3B524B9D.jpeg.eaa73a5316cebb6b5285bf71d975ae8a.jpeg

 

When I lifted Fort William it was not overly heavy, more awkward and by lifting at the mid points it was farly easy to make the short transfer and 180 degree turn to the work bench. I dont think that the scenic work will have added so much as to dramatically increase the weight. Worst case is I shall have to enlist a friend to help me return the baseboard to its position on the layout. Hopefully I shall get to the stage of finding the answer later next week.

 

 

Edited by young37215
  • Like 1

Share this post


Link to post
Share on other sites
2 hours ago, young37215 said:

 

Short answer is yes, the 2.7m long, 300mm wide section is removable as are the other two sections on the upper level of Mallaig and Mallaig Junction fiddle yard which are of similar lengths. This is of necessity so that I can access both sides of the baseboards to work of them. I dont envisage any of them being moved on a regular basis but I know that I can access them in need should a problem arise. The boards are 12mm chipboard with 30mm deep, 12mm wide batton screwed along each side so as to provide stability. The upper level is elevated above the main baseboard by the use of 100mm high pieces of wood placed at a 90 degree angle onto which the baseboards sit. 

58BCDE3E-FA93-4884-8430-F11D3B524B9D.jpeg.eaa73a5316cebb6b5285bf71d975ae8a.jpeg

 

When I lifted Fort William it was not overly heavy, more awkward and by lifting at the mid points it was farly easy to make the short transfer and 180 degree turn to the work bench. I dont think that the scenic work will have added so much as to dramatically increase the weight. Worst case is I shall have to enlist a friend to help me return the baseboard to its position on the layout. Hopefully I shall get to the stage of finding the answer later next week.

 

 

Rob,

 

Pleased to hear you are not encountering any problems with removable baseboards. As you know, my layout is 'all' removable baseboards so I hope it all goes as well as your experience.

 

I found that it's not the actual lifting / weight of the baseboards, it's more about the 'reach' you need to hold it in the air and lower it into position. That's when your arms start to hurt:angry:.

 

Share this post


Link to post
Share on other sites
21 hours ago, ISW said:

I found that it's not the actual lifting / weight of the baseboards, it's more about the 'reach' you need to hold it in the air and lower it into position. That's when your arms start to hurt:angry:.

 

Agree, now we know how a crane feels! Fortunately the arm extension and reach required for my upper levels is modest hence I have not yet had any problems in moving boards.

Share this post


Link to post
Share on other sites
2 hours ago, young37215 said:

 

Agree, now we know how a crane feels! Fortunately the arm extension and reach required for my upper levels is modest hence I have not yet had any problems in moving boards.

Rob,

 

I'm sure my baseboards are heavier than yours as they are much wider:cry:, and that also leads to a larger 'reach' requirement. I hope I've overcome this issue by making the baseboard supports such that the baseboards can be 'slid' into position, thus reducing the 'reach' issue. I'll find out in the next few days ...:this:

 

Share this post


Link to post
Share on other sites

Currently working on the station throat at Fort William. The ground behind the station rises up and is usually overgrown. It’s a bit of a faff as I want to leave space at the rear of the baseboard for a hidden siding that will extend from Mallaig Junction fiddle yard. The ground elevation should ensure the siding is largely hidden, it just adds to the tweaking to make it look right and work.

B6035325-7789-4D38-9DD2-B7F07E217095.jpeg.26a05a7d55f91c3098923448dd6caef9.jpeg

D5A49CD6-B906-4D8A-9E9F-C430C45A7595.jpeg.991d9d5bbc3c5093e7b89f67452dccdf.jpeg

The station canopy will also get an extension in the middle of about 100mm.

5D40B414-CB5B-43FC-B498-574779E90454.jpeg.ea8e3b4bfe193053d950788f90563d82.jpeg

A15DB233-5484-4267-9AA0-8C12066AB4F2.jpeg.1a4e05b2b34eaa126728ccf60c4ecbf3.jpeg

 

  • Like 8

Share this post


Link to post
Share on other sites

With the glue having set on the polystyrene used to create an embankment, I was able to Sculptamold the area. Once this dried it was painted and I fitted the retaining walls that separate the land from the railway. I am waiting for an order of ballast to arrive so that I can finish the area and secure the trunking. I placed a few trees to get a feel for how the area will look. 

 

4A850545-C58E-4480-ADCB-FAF1C861B10D.jpeg.23e300324cadf45d52e4ed48f882cf6f.jpeg

6B5431B3-AF58-4F00-B101-B1B3C380DF6C.jpeg.b869aeb48b3f92f738641002954c6804.jpeg

1BE881CF-E193-4E93-B3A1-6F125F656037.jpeg.ef2e0440bf615b66116cc1c6b9f56793.jpeg

417EDAD9-13C4-4264-8D13-2D506FA69591.jpeg.236742e6e521192b778382b2095247ce.jpeg

  • Like 7

Share this post


Link to post
Share on other sites
2 hours ago, young37215 said:

With the glue having set on the polystyrene used to create an embankment, I was able to Sculptamold the area. Once this dried it was painted and I fitted the retaining walls that separate the land from the railway. I am waiting for an order of ballast to arrive so that I can finish the area and secure the trunking. I placed a few trees to get a feel for how the area will look. 

 

*snip*

Rob,

 

I have a stash of polystyrene sheets that came from packing of cabinets and beds, so I'd be interested to know which glue you use on the polystyrene.

 

Also, any reason for using Sculpamold over the 'newspapers and PVA glue' method? In my imagination the latter would be considerably cheaper.

 

Share this post


Link to post
Share on other sites

Hi Ian

 

Despite WHL4 having most of the polystyrene it will need already on it, my garage is still full of offcuts saved for the 'I'll use it one day' event! I use PVA to glue polystyrene and find it very effective at doing the job.

 

I am a recent convert to Sculptamold having seen Mr Everard Junction use it. I have just finished the 3lb first bag that I bought 18 months ago for about £10 which has done all of Crianlarich, Garelochead and the small amount used on Fort William. It is easy to mix up and simple to use when skimming over, filling and shaping the polystyrene base I typically construct. Having discovered Sculptamold, I would not think of using anything else for this sort of work. Try it out for yourself; I buy mine through Amazon although it is out of stock at present.

 

 

  • Like 1
  • Thanks 1

Share this post


Link to post
Share on other sites
Posted (edited)

Ballast supplies arrived today allowing me to complete the station throat. The various concrete walls were weathered, the new ballast will get weathered once the glue has dried. 

 

A blend of Woodland Scenics materials was added to the scrub area on a bed of dilute PVA. I will add the trees once the station is back on the layout. One of the two backscene boards has been completed with the block of terraced houses painted.

 

422F494D-1D0C-493C-BE30-CBA36C0A32F8.jpeg.a0d50ed9852bb6ac8a51ac576f6cbf2a.jpeg

 

03AC4997-AB9B-48AD-8913-4ED5FEFB9B2E.jpeg.7615fbde2bd0c9434ea847fa0b7a9e17.jpeg

048F59E7-4327-4428-83CF-AB91BBA52EDD.jpeg.d13209671d1ddda7a080acf81854c442.jpeg

E74A8CFD-7AEF-42FD-8BAC-6D6760E88693.jpeg.480ce75b0ae6ccccbeb98e7f28c06913.jpeg

Edited by young37215
  • Like 9

Share this post


Link to post
Share on other sites
Posted (edited)

The second backscene board was painted and put back today. The new ballast has been weathered which is as much as I intend doing for now. Additional detail will be added over time with the station back on the layout. Tomorrow I will find out how much weight I have added when I return the board to the layout. 

 

3EFE2E83-B062-4B11-AB23-A427F1F29B5F.jpeg.cb95600046c6cc872bce8ff0367d9f6c.jpeg

0CE5C6F0-C63A-4AA8-932E-FB41C1C2DCF4.jpeg.981aaee4bc3da6e49967ebff3e792988.jpeg

31D71B32-065F-4848-93FA-56030C88EA11.jpeg.dd8cbd963b8dc309e7ab2b36bc6649a9.jpeg

1986C36F-EEE7-4C87-836B-05AF9FB2A532.jpeg.04eb84360911b7a88baed29a37ee17fe.jpeg

92226E20-1F17-42E2-AC0A-77A807B464E0.jpeg.76d4b6034a260cf927b2e0cc00b891ec.jpeg

Edited by young37215
  • Like 2
  • Craftsmanship/clever 1

Share this post


Link to post
Share on other sites
22 minutes ago, young37215 said:

The second backscene board was painted and put back today. The new ballast has been weathered which is as much as I intend doing for now. Additional detail will be added over time with the station back on the layout. Tomorrow I will find out how much weight I have added when I return the board to the layout. 

 

*snip*

 

Rob,

 

Surely some polystyrene and ballast weathering can't add much weight. You'll find out how heavy that Scuplamold is though.

 

  • Agree 1

Share this post


Link to post
Share on other sites
Posted (edited)

I managed to return the Fort William baseboard to the layout earlier today. All in all it was very straightforward, the weight change was minimal and the only challenge arises from the fact the baseboard is only marginally shorter than the width of the loft. A couple of trees on the Crianlarich side needed resiting after being knocked over by trailing wires but otherwise it ony took a minute or two to complete. Once all of the wiring was re- connected, 37033 did a quick test run and everything worked as it should. The only adjustment required appears to be the guage on platform 1 which is rather tight although it should not take long to file off a mm or two.

 

2009690406_120720042.JPG.2df66974e65201d39c1c6f5771d9d37f.JPG

1199679423_120720044.JPG.02938f261299cdcbf2cb15dc18162128.JPG

1186258927_120720043.JPG.bfefffccdaa699cd8b55781c2c42023c.JPG

1704513861_120720045.JPG.7505e14b77a11ced0afe4cc125b0a97b.JPG

Edited by young37215
  • Like 8
  • Friendly/supportive 1

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.