So to reach the milestone of 100 post on the thread and cause its Friday, here is a a quick video of the aim that we are heading towards

 

 

Due to the layout wiring we could only run it on DC whilst we did the testing hence the speed of the loco as the controller being used was struggling to power the whole layout.

But we still had fun :yahoo:

  • Like 14
Link to post
Share on other sites

  • 4 weeks later...
  • 3 weeks later...

The next few boards are now being worked on and here are a few pictures of the latest work carried out by Davepost-7305-0-92068500-1500752271_thumb.jpgpost-7305-0-30034500-1500752366_thumb.jpg

The point machine cables have been installed from the machine to the troughing route and cable to the ground signal also represented.

  • Like 15
Link to post
Share on other sites

  • 1 month later...

No work to report over the summer break but we have now started the great re-wire to DCC!!!

A before and after shot below, work completed to remove all common return loops (to be replaced by individual droppers to bus-bars), and remaining feeds separated to Up & Dn line circuits as we are splitting layout into several power districts to avoid short circuits and power drops.

post-7305-0-54271700-1505312192_thumb.jpgpost-7305-0-57433600-1505312205_thumb.jpg

  • Like 2
Link to post
Share on other sites

Thish Dee shee shee malarkey ish easy, can't see what all the fush is about- hic! The morning hash flowwwn by wiring- hic.

post-7305-0-18691500-1505996746_thumb.jpg

 

Very tempting to open a beer! All wiring for bus-bars now in for first fiddle board- red/grey for outer district and white/grey for inner.

  • Like 3
Link to post
Share on other sites

Thish Dee shee shee malarkey ish easy, can't see what all the fush is about- hic! The morning hash flowwwn by wiring- hic.

attachicon.gifIMG_0417.JPG

Very tempting to open a beer! All wiring for bus-bars now in for first fiddle board- red/grey for outer district and white/grey for inner.

Just wait until you start seeing double!

 

Stephen

Link to post
Share on other sites

  • 1 month later...

Quick update on work- 7 of the 19 boards are now fully prepped for bus-bar fitting, points have had to be separated from the common return (common return fed track feeds/points/signals) and are going to be controlled via the original panel and fiddle yard route matrix.

Another task that has been started is a database of stock- starting with revenue freight a first draft has been started and I have added a screen shot of the initial count below.

Only a few more rakes required to fill the expansive fiddle yard!!!

post-7305-0-81650500-1509658923_thumb.png

  • Like 5
Link to post
Share on other sites

  • 2 weeks later...

A bit of a milestone reached today as 50% of the wiring prep is complete! Dropper wires fitted, insulated fiddle yard circuits bridged out and point frogs isolated and tested through the existing micro-switches for frog switching.

Work has taken around 35 hours to complete with plenty more work to do!!!!

Picture below is of one of the point matrix boards (there is one either end of the fiddle yard for route setting (we are not touching these at the moment so the work has been to remove the common return wires that feed the track).

 

post-7305-0-40172400-1510848296_thumb.jpg

  • Like 2
Link to post
Share on other sites

A few more pics of the scenery overhaul from Dave- back scene repainted and work undertaken on the trees. The line pictured leaving the main board was originally the iron stone spur but we are going to have its future/80's use as a ballast spoil tip- loaded Grampus or alike arriving and empties leaving.

 

post-7305-0-90706000-1511291559_thumb.jpg

 

post-7305-0-30668500-1511291587_thumb.jpg

  • Like 18
Link to post
Share on other sites

  • 1 month later...

Quick update on work- 7 of the 19 boards are now fully prepped for bus-bar fitting, points have had to be separated from the common return (common return fed track feeds/points/signals) and are going to be controlled via the original panel and fiddle yard route matrix.

Another task that has been started is a database of stock- starting with revenue freight a first draft has been started and I have added a screen shot of the initial count below.

Only a few more rakes required to fill the expansive fiddle yard!!!

attachicon.gifIMG_0452.PNG

Could probably fill most of the holes in your stock list there Andy I have 80+ new style MGR

Link to post
Share on other sites

Also a stock update as I managed a mornings work on two carflats I received for Christmas! With the addition of a some suitable period cars and maybe a few more flats the start of one of many trains we will need to stock the layout.

A pic of the first flat half way through weathering on the work bench-

post-7305-0-26438800-1515709801_thumb.jpg

  • Like 6
Link to post
Share on other sites

Dave has continued work on the yard board and the signal box now has had a lick of paint. I have attached a photo (posted by Tony Wright) from earlier in the thread to show the box from both sides and before re-paint in its original colour.

post-7305-0-66635100-1515966872.jpg

post-7305-0-53975100-1515966904_thumb.jpg

  • Like 9
Link to post
Share on other sites

  • RMweb Gold

Dave has continued work on the yard board and the signal box now has had a lick of paint. I have attached a photo (posted by Tony Wright) from earlier in the thread to show the box from both sides and before re-paint in its original colour.

attachicon.gifIMG_0597.JPG

attachicon.gif20180114_183034.jpg

 

Thankfully yet to receive plastic windows.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...