RMweb Premium Dave Searle Posted February 15, 2020 Author RMweb Premium Share Posted February 15, 2020 Hi, I'm making very slow progress with the track as real life is getting in the way of modelling. I'm currently working on the tandem, entering into the triangle between the main lines (in the middle of the picture). Nick has been working on mock-ups of the buildings. We had to redraw the turntable and nearby sidings when Nick noticed that the loading platform was not going to fit. A recent new arrival is a very nice 2mm 3D print (Shapeways Smoothest Fine Detail Plastic) for an E1 from Small Loco Works: Nigel has recently reprofiled the wheels on a Dapol Terrier (no. 40 Brighton). Meanwhile, to fill in time while I'm doing the trackwork, some of the rest of the team have started on a small 009 layout (called "Much Waiting"). Cheers, Dave 15 2 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now