Some further work on the layout slowly taking shape - I am waiting for the MERG CBUS kits to arrive before installing droppers and wiring the layout. Meanwhile I have continued to work on the scenic break which is the motorway over the line.

 

I have now made the middle section removable to allow access to the point below when fully installed. At the moment both sides are modules not yet attached and will be seated and filler used right to ground level once the track has been wired, painted and ballasted. The street lights have been primed, the wires set through the scenery layer to go through holes in the board, and sealed in plastic bags to keep them safe while doing the concrete and tarmac effects.

 

The retaining wall of the bridge entrance was made from plasticard, and set into the polystyrene hills covered in filler. The flat surfaces have been primed with plastikote suede (now available on Amazon!) ready for various paint schemes to represent either newly cast concrete (bridge) or tarmac (motorway).

 

I have also splashed out on a set of 3D printed motorway concrete barriers on Shapeways - actually quite pricey I now realise for what they are, but they are of a reasonable standard. What I cannot find is British outline Armco barrier, so iconic on British motorways - getting own design 3D printed may be the best solution...

 

Finally the layout now has a single locomotive  - the Dapol Class 68 in DRS compass livery - something I have resisted buying ay every exhibition in recent history but have now fallen for its charm - should keep the layout super up to date.

 

 

IMG_1792.jpg

IMG_1794.jpg

IMG_1795.jpg

IMG_1796.jpg

IMG_1797.jpg

IMG_1798.jpg

  • Like 3
Link to post
Share on other sites

  • 3 weeks later...
  • RMweb Gold

This is the MERG CBUS system.

MERG2.JPG.f850b5376df93bdc3369f39b07a67f12.JPG

 

All the modules needed to operate a layout with up to 8 points. Sevenside has only 4 points but one is on the other board, hence two servo modules needed. We are using only MERG parts no second party DCC such as an NCE. The Throttle comes as a separate kit as well. All the modules with the exception of the throttle have been completed except for fitting the Chips. The throttle could be finished but needs the command station to test it, before mounting everything in the case. I am not an electrical engineer but the instructions are very comprehensive making it difficult to make any major errors. The next step is to meet with my expert MERG guru and fellow SHMRC club member Nigel Phillips to fit the IC's, test the boards and work out how it all goes together. We can then deliver it to Bristol. In the meantime while babysitting yesterday, I marked out on the boards all the positions required for track feeds.MERG1.JPG.9d773400569166e0e26cc1f54cbd0fb4.JPG

 

1182634956_TrackFeeds.jpg.d25112edc8ddee2791328be94ac854c7.jpg

Link to post
Share on other sites

  • 6 months later...

Another 7 months …. and some more progress made.

 

The wiring has now been completed. In the end I chose the MERG CBUS system and controller - this a great modular set of components for DCC running which comes as a kit. The other bonus of this is that it is cheap (having pre-schoolers in nursery is very expensive), however time being at a premium, the kits were built by Kipford as a birthday present - this is turning into a modular build of components given to me!

 

This starts  a command board which takes the main power supply, output into the track bus and the CBUS which runs the length of the layout. The handheld controller attaches through another small board mounted at a convenient location. The CBUS is based on automotive technology in car dashboards, and carries the commands for running the decoders in locos, and the points (as well your fans/wipers in your car), whilst the power comes from the main track bus. A mimic panel with point repeater lights has also been built, and plugs into the main board. 

 

-certainly my next layout, more experienced and hopefully with older children, I would hope to tackle the MERG kits myself and certainly would use them again based on functionality. Although a great proponent of DCC from the start, an important aspect was to have a controller with a "knob" to turn - perhaps nostalgic for the gaugemaster controllers of my childhood. The controller is compact and easy to hold in the hand having all the functionality needed for this layout (essentially sound controls). 

 

The points have also been finished. Using microservos, these were built using a motor kit from our friend at Clockwork Ideas, with a flexible actuator arm sitting within a small spring attached to the point tie bar. They are fine tuned by plugging a PC into the layout and using MERG's configuration program. 

 

The fiddle yard has also been completed and has a single set of cassettes for a loco and rake of wagon. This is a loving copy of the set up on Brighton East. The importance of this is that it can be used as a head shunt and the front sidings used. More cassettes will be built in time.

 

-finally, a set of 3d printing mock ups of the binliner containers - obviously curteosy of Kipford. The white one on the left is a early mock up, the grey one on the left a closer prototype. It still needs some tidying up but you can almost now start smelling London's waste being imported to Bristol with it's climate emergency and all.

 

 

Next up.... 

 

-painting the track

-ballasting

-painting concrete and tarmac on motorway and overbridge

-starting the main incinerator building

 

 

 

IMG_0509.jpg

IMG_0508.jpg

IMG_0507.jpg

IMG_0506.jpg

IMG_0505.jpg

IMG_0511.jpg

  • Like 4
Link to post
Share on other sites

Uploaded some pictures of the point motor mechanism and fiddle yard.

 

I have done a bit of scenery tonight, putting the posts in for the fence running along the motorway on the embankment, and adding further filler to mould the banks. I have also put in the (unpainted) concrete plinth which will hold the motorway signage gantry which will act as part of the scenic break.

 

The upright dowel structure is based on the dimensions of the Severn Models pylon, to try and work out if it will look appropriate- I am finding it hard to resist. The main question is whether it should be infront or behind the track.

IMG_0517.jpg

IMG_1615.JPG

IMG_0514.jpg

IMG_0516.jpg

IMG_0515.jpg

Edited by vierundvierssig
Link to post
Share on other sites

  • 1 month later...

So unexpectedly the coronavirus pandemic has lead to unprecedented time to work on the layout. Although we are both clinicians, our son having a cough has put us out of action for 2 weeks due to the lack of testing for healthcare workers.

 

In between being daycare so my wife can run her clinic from home (which I don’t have the option of), asking friends to leave milk/apples on our door step and trying to distract from the guilt of spending two weeks away from work, I have managed to plough on with the scenery (as may not be so much time when back!)

 

Firstly I have focused on finishing the motorway bridge- I have used a concrete technique I found on here from a user called Celticwardog (thank you). I have also been working on the barrier fence (posts painted, boards need painting) - what is outstanding is building the railing section for the part over the bridge and the tarmac.

 

25AE8EB1-F2C6-4DC0-8B63-E723C369B3FF.jpeg.fb43aa84351fcda5fd4846d924f3b398.jpeg

 

42880BB2-C976-4266-AB5C-E18CEA8DA02B.jpeg.e0b75f92929ea78b2a783b83c8b2f5c4.jpeg
 

11492B61-D90E-4B34-B228-32461D333196.jpeg.667904aa4680484708eb18a96ac43664.jpeg

 

The tarmac is still awaiting a further selection of grey tones to arrive from

Amazon to be finished as the current base tone is too homogeneous/dark/pristine. The dowel structure represents the profile of the pylon by Severn models - yet to be acquired.


C1F5EAB2-CD47-4671-ADAE-C26A2645FF74.jpeg.a3ed1e5e3f253f698f991f9224d36cec.jpeg

 

The banks will eventually be covered in more polyfiller and moulded into the ground- eventually also brambles. Note the concrete plinth on the far bank, which is awaiting decoration with switching cabinets and railings. 
 

For the motorway I have scratchbuilt a half section of Motorway sign gantry. This too is awaiting the arrival of grey paints and I am questioning whether to uplight the sign. 

6DC9C43D-FC7E-4227-BCF1-3405BF824E72.jpeg.5c4433cf19627c94412b29b546f7f0bb.jpeg

 

The layout has had further landscaping with filler and has been covered in brown emulsion and the base for dirt/gravel covered areas and beneath grass scatter/eventual static grass.


7C2C1F4B-F5D9-4E20-94BA-ECAFBAC992E1.jpeg.97b0291482a6b218ed99d2080692071d.jpeg

 

I have also added a raised area representing the concreted work area of the plant onto which containers will be received. Gaps between cork have been polyfilled and then power sanded flat but I hope will provide some texture representing the concrete sections. A white emulsion has been applied and the concrete is awaiting painting when the grey paints arrive.

 

As a little luxury I have built a portable toilet/welfare unit container from

scalemodelscenery.com. It’s hard to believe how this came in a flat envelope and is made from

beautiful thin board etches - so good I have ordered the matching work office to go with it.
 

3E5E678F-0367-4861-96A1-3FA49CF7CA44.jpeg.d5da96dcb822c495a6e15ea20be380d4.jpeg


82C75DA6-45AE-4AD0-91EE-6DA92569ADA8.jpeg.bc63906690b519adcb700945326c6fd4.jpeg

 

This week’s job for week two of isolation in addition to the

motorway bridge railing is to start the incinerator plant itself - this is awaiting some foam board and slaters 7mm corrugated Sheet to arrive in the post. At the moment the foot print of this is occupied by some representative polystyrene.


I suspect after this time will be even rarer than before, so will try and have a productive week!

 

  • Like 7
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • 3 weeks later...

Back at work, but when home the lockdown means I can justify doing work with management as we cant go anywhere!

 

I have continued to work on the motorway - I have been gifted a bespoke designed and 3d printed Armco barrier sent in the post - I could only find German or American outline barriers but the British design is so key to the feel of a major trunk road. The tarmac is still not detailed - despite testing watered down washes I cant get an effect I am happy with and so am waiting for some pigment powders to turn up - I feel I need the blending ability of these for a gentle transition from experimenting with some Polyfilla dust to good effect (watch this space)

 

IMG_0800.JPG.0c4a7a426c85e50e1848342c1bbd8ec1.JPG

IMG_0801.JPG.766548f1b3f4987f14ec741d5cf3553b.JPG

IMG_0802.JPG.0209d0143b931d6be9877da9629606a8.JPG

IMG_0803.JPG.dd163a3c4f9e539be69854a05d312da1.JPG

 

 

With Amazon deliveries slowing down I have had to make my own ground cover scatter - I have started using oven dried coffee grounds from an espresso machine. Ive used this to simulate a whole dug out of the ground uncovering some aviation fuel pipeline (specific to Avonmouth) being worked on and to line the drainage leet. I have also found lots of good tutorials on youtube, many from Europe and have used the technique of "Spoorinmodel.nl" using duct tape, scatter and varnish for the waterway. I have ordered the War World Scenics static grass applicator which is needed to complete the bank. The walkway will be almost falling apart from rust and is an adapted industrial walkways kit from scale model scenery.

 

IMG_0796.JPG.0576f643539b54ff6d47df80f37b2e8b.JPG

IMG_0797.JPG.18aa6b9dc521bda1cd609b04ca6aa561.JPG

 

 

Work continues on the incinerator building - I have completed 66% of the final structure but needs detailing as well as painting - I have literally run out of plasticard and filler material so await further deliveries!

 

IMG_0798.JPG.f7e69952eca3f82962aa31765fee5803.JPG

IMG_0799.JPG.2b8607090de656d9bfc3f4fb37567b4a.JPG

 

Next I need to paint the track and to start thinking about ballasting - paints from Phoenix Precision are on the way but again another wait! 

 

 

  • Like 7
  • Craftsmanship/clever 3
Link to post
Share on other sites

Bit of further work today - laying down some of the dereliction suggesting older, wealthier times at Avonmouth. 

 

The site at the real Avonmouth is a marked juxtaposition between the brand new shiny incinerator building and signs of the old ICI chemical works in the surround.

 

IMG_0818.JPG.a3cb6617e0286ca56351f0c53cc61891.JPG

IMG_0819.JPG.65c843e28e918dde63b5dbaec79359f6.JPG

IMG_0820.JPG.3f27b42158b63f8a9ae56b1116cfed16.JPG

IMG_0821.JPG.f59295dfd7924fd41f7b2e172eefc401.JPG

 

 

One final thing for today was coming across this video from a pretty talented Australian chap - I seriously thought about automating the main shutter door into the incinerator building but this shown it is easily possible

 

 

 

  • Like 2
Link to post
Share on other sites

  • 2 weeks later...

Some further progress...

 

1) drainage leet mostly finished, some

early static grass down mostly as a test but will be layered up to be much more Overgrown with the war world scenic layering spray once ballasting finished. 
 

I have decided to put a footpath along the bank alongside which will run a security fence.
 

Track has been finished painting comprising a spray covering of Phoenix weathered sleepers, dry brushed with sleeper grime , chairs and rail sides in rusty rails and all toned down/highlighted with Vallejo brown wash.

 

The concrete section for the incinerator plant and unloading hard standing was the same Phoenix aerosol for the track, but covered in Vallejo grey pigment on a sponge dipped in a homemade acrylic black wash0FADDC7D-890E-4766-AD4D-374DCF2F6136.jpeg.22018a3f8268244839f183845a486048.jpeg
 

2) work continues on the incinerator buildings- the structure is mostly complete and the curved over hang comprises of a gully of two plastistrips filled with modelling putty. This will be sanded down flush and essentially has been chosen as I could not hope to cut plasticard to two parallel curves matching the building contour without  a laser cutter. (Cutting plasticard is a pet hate and any tips on things such as gulliotine devices are wary welcome!)


Internal lighting has been inserted including a flickering orange effect and the early shutter door

mechanism started 


3FFD6DC2-B9E8-47DC-9E1A-FEEA03A7ADF0.jpeg.b0e722c0343628fdad97653ea877b639.jpeg

 

 

3) the motorway is mostly finished except for printing the sign and the tarmac finish. I am going to experiment with some pastel shavings applied with a make up brush to weather this down. I now have road markings but I feel they are a bit dull

and in real life are slightly raised and gloss effect- reconsidering further touches to this

 

Once the track is ballasted, the motorway can be fixed down and the embankment completed - this is mostly going to be brambles however

 

47197E33-C9A7-40EF-85FF-6FB0B694AF5D.jpeg.278cc82ba77b465b843e55593b8b709b.jpegAA4CBC8F-3269-43E1-8FA4-959E821D071E.jpeg.74c6fef88cf95a7136067e63703b4b1e.jpeg

 

  • Like 3
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • 1 month later...

Further work as time goes by - but less time as increasingly allowed out of the house.

 

The track was painted - I chose to use the phoenix precision "weathered sleepers" and then dry brushed on "sleeper grime. The chairs and rail sides were painted with "rusty rails then the whole lot toned down and highlighted with a Vallejo black wash. 

 

The ballasting has been overall completed - I used woodland scenic fine grade ballasts, mostly grey with a mix of light grey and buff throughout. I am still working out how much I want to weather this, whether powder or washes.

 

IMG_0951.JPG.e53243bc8b1fac345462ef036bfe6c96.JPG

 

 

I invested in the War World Scenics (WWS) grass applicator system - particularly because of their layering spray (now produced under licence by Peco) and the selection of different fibres to build up "shades of grass". I have spent increasing amounts of Lockdown walks examining the weeds in the Avonmouth area and to a degree have been able to represent them with some of the shades - however I still need to make a whole selection of weeds.

 

IMG_0959.JPG.17f5fd4df5a1da9d0cc247c052f546be.JPG

 

IMG_0963.jpg.e891d27986b63488d8e887ccf4e1aa60.jpg

 

8BB181B6-0DB8-40D6-9D15-1E67958D3C63.JPG.f3e5f96bb89e5ef65f7ab342ecfc221b.JPG

 

 

The longer overgrown areas were represented by using the technique on the WWS tutorial to make a layer of short grass the bunch this up and relayer with the spray over the top.

 

Further detailing has been added to the drainage leet area which now looks lovely and overgrown - I have started adding security fencing and the adjacent footpath. I discovered an incredible material by Vallejo called "thick mud"- literally applied as mud. It needs a tiny bit of toning down but I am very pleased with the effect.

 

43E6E999-B672-4332-AA35-C120EE0E4881.JPG.fb7c1fe0cc4edecfd86c68e7d2834a55.JPG

 

IMG_0992.jpg.634741cecfdc14bdf721e628150065b9.jpg

 

 

I have built some buffers 3d printed and sent in the post - the same outline as on Brighton East - the foreground sidings need to be made significantly more overgrown - but currently I am too much of a coward and need to practice on a spare piece of ballasted track.

 

Finally a lockdown present- 3d printed rubbish containers from Kipford - really set the scene on the wagon themselves but also will be an integral part of the scenic break. 

 

IMG_1040.jpg.ce2e47ffa2773628b6519b355c006177.jpg

 

IMG_1042.jpg.8591d326bfd95f13a8cc6ff59492a0c1.jpg

 

IMG_1041.jpg.fa8edb6600211a0339bcaecf3212c3f4.jpg

 

Current plans are to continue on the buildings and planning the back scene as this needs to go in before many things can be planted down currently.

 

  • Like 10
  • Informative/Useful 1
  • Craftsmanship/clever 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...