Jump to content
 

Freight services being updated


Recommended Posts

  • RMweb Gold

Not seen this mentioned before so thought I would drop it in here.

 

https://www.networkrail.co.uk/feeds/freight-trains-in-britain-to-be-upgraded-with-delay-busting-digital-technology-in-multi-million-pound-deal/

 

Not too sure how it helps anyone but at least there is money being spent on the network which shows that growth is anticipated.  Long term project though if they are talking about every Loco being fitted with equipment by 2022!

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Ah, the good old story of trying to integrate modern signalling kit into traction several generations older.  I saw that one rise and then die a death in connection with WCML 'modernisation in the 1990s when the 'black box' requiring to be retrofitted was described by its American promoters as 'about the same size as a coffin so no problem fitting it into your trains'  :O   Electronics have, of course, moved on since then but 1990s technology traction units are still 1990s technology traction units.

 

I also came across the 'digital technology future' while doing some ISA work on the wonder signalling and traffic management system proposed for the WCML (and intended to go into the new building at Saltley and, by odd coincidence directly involved in freight train operation.  For some totally unaccountable reason the system specification developers, who had allegedly been advised by 'railway professionals', had completely misunderstood how the BR 29973 Form system for exceptional etc loads worked and were planning a spec which would ensure 8'6" high containers were likely to collide with various bridge structures and how speed restrictions due to heavy axleloads would not be enforced their bright ideas died a death as well (not just because of what I found as it happened, the spec had far more serious holes in it).

  • Like 3
Link to post
Share on other sites

Interesting how it will make freight trains safer. Are freight trains falling off the rails on a daily basis due being signalled by coloured lights at the side of the track?.

 

Whilst this looks good on paper, did no-one ask about all the passenger trains that use the railway? Are they going to have the same technology fitted? 

 

This has all the hallmarks of creating  a political good news story when the reality, in terms of delivery timescales, will be a lot more disappointing.

 

Andy (being cynical) 

  • Like 2
Link to post
Share on other sites

  • RMweb Gold

I don't have problem with taxpayer funding being used to aid the development of the technology, provided that there's some equitable sharing of the risk during the development cycle.

 

On the assumption that the technology can be made to work and deliver the benefits claimed for it, I do have a problem with taxpayer funding being used to provide the technology effectively free gratis to 'privately' owned freight operating companies without any financial contribution from them, or from the locomotive leasing companies for that matter.

 

There's not enough in that Network Rail piece to be able to make an assessment either way.  Hopefully though this won't turn out to be a long running saga of the taxpayer being on the hook for another open ended financial commitment.

Edited by 4630
Link to post
Share on other sites

  • RMweb Premium

Surely this is nothing new. The railway industry has been working towards implementing ERTMS/ETCS for several years. As alluded to above, nothing more than political spin. And yes, the "whole fleet" will need to be fitted (in time), not just the 'freight locos' - exactly the same as GSMR. It will be interesting to see if the "yellow plant" will be included in the fitment (at the moment I can't see why not), and also all the "preserved" locos currently licensed to run on the "main line".

 

Regards, Ian.

  • Agree 1
Link to post
Share on other sites

  • RMweb Gold

Will there be any freight left on the railways by 2020?

 

 

Are you not expecting the various bio-mass, intermodal, aggregates, steel (raw materials and finished product), timber, oil/bitumen/petroleum, and the small amount of coal to continue past 2020 then?

  • Like 1
Link to post
Share on other sites

Gordon

 

In a simple terms this new system will do away with lineside signals and  replace them with a display in the cab. This means that trains can run closer together as some technical magic occurs and the system  knows where all the trains are, how far apart they are and what is a safe distance between them allowing for their different braking characteristics etc. and can advise on safe maximum speeds for each train given the location and speed  of others around it.

 

Andy

  • Agree 1
Link to post
Share on other sites

  • RMweb Premium

Excuse my ignorance but what does this new system do?

 

Gordon A

(Still living in the steam age, but occasionally peeping over the fence.)

Hi Gordon,

 

ETCS (European Train Control System) is essentially "in-cab signalling" - altough there are 4 levels (0 - 3) with level 3 being the full in-cab signalling system.

 

Hope that helps.

 

Regards, Ian.

Link to post
Share on other sites

Gordon

 

In a simple terms this new system will do away with lineside signals and  replace them with a display in the cab. This means that trains can run closer together as some technical magic occurs and the system  knows where all the trains are, how far apart they are and what is a safe distance between them allowing for their different braking characteristics etc. and can advise on safe maximum speeds for each train given the location and speed  of others around it.

 

Andy

 

 

It should also eventually drastically reduce the need for track side cables, improving reliability and significantly reducing cost.

 

In cab signalling is also prerequisite for running at speeds above 125 mph.

Link to post
Share on other sites

  • RMweb Gold

Gordon

 

In a simple terms this new system will do away with lineside signals and  replace them with a display in the cab. This means that trains can run closer together as some technical magic occurs and the system  knows where all the trains are, how far apart they are and what is a safe distance between them allowing for their different braking characteristics etc. and can advise on safe maximum speeds for each train given the location and speed  of others around it.

 

Andy

As was promised to Beardy so his Pendoleany trains could run at 140mph on WCML from 2005. Some of us in the industry were sceptical when it was promised, my view was it would be ready on WCML for the replacement of them in the mid 2020s.

  • Like 2
  • Agree 1
Link to post
Share on other sites

  • RMweb Gold

Surely this is nothing new. The railway industry has been working towards implementing ERTMS/ETCS for several years. As alluded to above, nothing more than political spin. And yes, the "whole fleet" will need to be fitted (in time), not just the 'freight locos' - exactly the same as GSMR. It will be interesting to see if the "yellow plant" will be included in the fitment (at the moment I can't see why not), and also all the "preserved" locos currently licensed to run on the "main line".

 

Regards, Ian.

 

It is virtually impossible to fit to various preserved locos, especially those propelled by steam as it not only initiates a brake application in certain conditions if the Driver doesn't do it but will so cut off the power.  Not to difficult to do things with brake systems (apart from all sorts of graduated applications etc) - after all the GWR was doing it over a century back.  But cutting off the power is a rather more sophisticated task which means going into the control system of the loco and it would not be at all easy to incorporate on a steam engine without some design changes of a very basic sort.

 

Incidentally there is another challenge with freight when it comes to braking as train load has to be taken into account plus the way in which brake force develops through the train.  BR trials with ATP showed it was well nigh impossible to get consistent brake application on a freight, even using the same train several times over which came up with a different stopping distance every time.  Freight fitment could prove to face some interesting hurdles I think.

Edited by The Stationmaster
Link to post
Share on other sites

It is interesting that if this is to be installed by 2020 on freight locos, then presumably the same will apply to passenger trains too, or at least not be too far behind.  One then has to wonder why such a lot is being spent replacing lineside signals with err.. lineside signals that, if the logic follows, only have an intended life cycle of around 5 years.

 

Andy (Still cynical) 

Link to post
Share on other sites

  • RMweb Premium

It is interesting that if this is to be installed by 2020 on freight locos, then presumably the same will apply to passenger trains too, or at least not be too far behind.  One then has to wonder why such a lot is being spent replacing lineside signals with err.. lineside signals that, if the logic follows, only have an intended life cycle of around 5 years.

 

Andy (Still cynical)

 

Obviously the trick is to get all the required traction fleets fitted first with the ETCS equipment and then gradually start to remove sections of the traditional lineside signals. So it will be quite a while before lineside signals start to disappear - I suspect long after 2022.

 

Regards, Ian.

  • Agree 1
Link to post
Share on other sites

  • RMweb Gold

The passenger trains will obviously have to have it.

The article is only about the programme to provide installation in freight locos.

 

 

.

I appreciate that Ron but are both passenger and freight being fitted in the same period?  If the freight is not expected to be completed until 2022 and the passnger after that then I don't see it being much use for many years.  Then once they are all fitted and tested they will start to remove the signals.  So not in the foreseeabe future then!

Link to post
Share on other sites

  • RMweb Gold

During a reorganisation consultation in the 1980s my then Regional S&T Engineer removed Locking Fitters from our organisation chart. His reasoning was that all lever frames would be gone from BR within about 20 years, so there was no need to train up and maintain specialist staff, those remaining could still do the job from the combined gangs. I researched the rate of resignalling at the time and we put the case forward that even with doubling the rate of resignalling experienced between 1959 and 1984 it would take approaching 50 years to complete the whole railway if the network and traffic level remained approximately the same as it stood at the time. I think my estimate may be it a bit closer than his.

  • Like 4
Link to post
Share on other sites

The logic of fitting the freight fleet first is sound, in that, as a group, they go anywhere on the network, whereas much of the passenger fleet is captive to particular routes/areas and can be dealt with as those areas are converted to cab signalling and transmission based (effectively moving block) signalling. Whether that will bring a really significant increase in the network capacity remains to be seen, but it is currently seen by some as the saviour of a railway network that is far removed from the metro systems where it has so far been applied.

 

Jim

  • Agree 1
Link to post
Share on other sites

  • RMweb Premium

The logic of fitting the freight fleet first is sound, in that, as a group, they go anywhere on the network, whereas much of the passenger fleet is captive to particular routes/areas and can be dealt with as those areas are converted to cab signalling and transmission based (effectively moving block) signalling. Whether that will bring a really significant increase in the network capacity remains to be seen, but it is currently seen by some as the saviour of a railway network that is far removed from the metro systems where it has so far been applied.

 

Jim

The opposite way round to GSMR, the freight locos being some of the last to be fitted. Which again made sense at the time with the main passenger routes being "GSMR implemented" stage by stage, and then any freight only routes not already covered mopped up at the end.

 

Regards, Ian.

  • Agree 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...