RMweb Gold lezz01 Posted August 5, 2021 RMweb Gold Share Posted August 5, 2021 Very nice Shaun. 1 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 24, 2021 Author Share Posted August 24, 2021 (edited) Some more progress with the platforms. The parcels loading area is also coming along, this will be a tarmac area for road vehicles unloading etc M.R.P.G Edited August 22, 2022 by M.R.P.G Missing picture 7 Link to post Share on other sites More sharing options...
M.R.P.G Posted October 3, 2021 Author Share Posted October 3, 2021 (edited) More progress with the top surface now being added to the platforms Also a little more work around the canal, with walls and bridge supports. Edited August 24, 2022 by M.R.P.G Missing picture 5 Link to post Share on other sites More sharing options...
M.R.P.G Posted November 15, 2021 Author Share Posted November 15, 2021 (edited) More progress on Westfield with the platform surfaces finished with slab sheets. Also backscene boards and front fascia boards fitted to all three baseboards. Edited August 22, 2022 by M.R.P.G Add missing picture 5 Link to post Share on other sites More sharing options...
M.R.P.G Posted November 16, 2021 Author Share Posted November 16, 2021 (edited) Canal construction with the side walls added and a bottom piece for the water area. Next we are looking at making a road bridge over the station area, so here’s a mock up to see what it will look like. Edited August 22, 2022 by M.R.P.G Missing pictures 4 Link to post Share on other sites More sharing options...
RMweb Gold simon b Posted November 28, 2021 RMweb Gold Share Posted November 28, 2021 Dont know how I've not seen this thread till now, just my sort of thing a 70's suburban layout. What plans have you for the triangle of board in front of the station area? Link to post Share on other sites More sharing options...
M.R.P.G Posted December 12, 2021 Author Share Posted December 12, 2021 (edited) On 28/11/2021 at 19:40, simon b said: Dont know how I've not seen this thread till now, just my sort of thing a 70's suburban layout. What plans have you for the triangle of board in front of the station area? Hi Simon, The triangle area in front of the station will be a car park, the platform at the front has been made to look partly demolished as the station has been rationalised. Edited August 24, 2022 by M.R.P.G 1 1 Link to post Share on other sites More sharing options...
M.R.P.G Posted December 14, 2021 Author Share Posted December 14, 2021 (edited) Monday evening 13.12.21 progress update . A mixture of polyfiller and black paint was used to cover the disused track so that just the rails are showing, and the area in front a sludgy car park . We used a vehicle to put tire tracks in the messy mixture. Also progress with the bridge. Blocks of wood glued down for supports and a piece of ply wood cut to shape for the road surface. We are using the Hornby Piers for support on the station platforms. The demolished platform end has been sloped off using Das model clay. All this will be painted accordingly at a later date. Edited August 24, 2022 by M.R.P.G Missing picture 4 Link to post Share on other sites More sharing options...
RMweb Gold simon b Posted December 15, 2021 RMweb Gold Share Posted December 15, 2021 (edited) That disused section of the layout is looking very good, it reminds me a little of the closed platform 3 at Liverpool street Met station: Edited December 15, 2021 by simon b 1 Link to post Share on other sites More sharing options...
M.R.P.G Posted December 16, 2021 Author Share Posted December 16, 2021 On 15/12/2021 at 22:08, simon b said: That disused section of the layout is looking very good, it reminds me a little of the closed platform 3 at Liverpool street Met station: Good picture, that girder is something like what we will be doing under the road bridge. And weeds on the platform thanks 2 Link to post Share on other sites More sharing options...
M.R.P.G Posted December 21, 2021 Author Share Posted December 21, 2021 (edited) Last meeting of 2021. We had a running session and all ran with no problems. Edited August 24, 2022 by M.R.P.G 1 Link to post Share on other sites More sharing options...
davep101 Posted February 8, 2022 Share Posted February 8, 2022 A little something I’ve been working on as a gap filler…..quite pleased so far! 6 1 Link to post Share on other sites More sharing options...
M.R.P.G Posted March 15, 2022 Author Share Posted March 15, 2022 (edited) Work on the infrastructure in progress. Using Plasticard on the walls etc . Also the road bridge is fitted now . But can be removed for maintenance etc. Retaining wall added to the incline . Nearly ready for the ballast. Edited August 27, 2022 by M.R.P.G Missing pictures 7 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 27, 2022 Author Share Posted August 27, 2022 A lot has happened since our last updates, the canal is progressing well with sidewalk installed and girders in place. Ballasting has also now been completed. And landscaping along the front of layout with carved polystyrene pieces glued on. Retaining walls fitted and covered with embossed brick sheets. 6 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 27, 2022 Author Share Posted August 27, 2022 (edited) More pictures of the completed ballasting. And completed DMU stabling area with inspection pits. The tracks on the right behind the backscene are the traverser fiddle yard. Edited August 28, 2022 by M.R.P.G 10 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 28, 2022 Author Share Posted August 28, 2022 (edited) Using “Wills” brick sheets, for the bridge details with a garage workshop under the arches. 156/158 combo unit and 108 DMU at Middleton Central. Edited August 28, 2022 by M.R.P.G 4 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 28, 2022 Author Share Posted August 28, 2022 Using Polystyrene for the landscape along the front of layout. Retaining walls under construction. The high level tracks are the DMU stabling sidings . The lower track is the kick back siding for the station pilot moves. 4 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 28, 2022 Author Share Posted August 28, 2022 Retaining wall added for the lineside boxes. 3 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 28, 2022 Author Share Posted August 28, 2022 The control panel will be hidden behind a low relief goods warehouse. Construction of the loading platform is coming along. The goods siding also has a magnet fitted for Kadee operation. The landscape has been covered with strips of an old yellow pages, using PVA to seal up the polystyrene. 3 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 28, 2022 Author Share Posted August 28, 2022 Some brown emulsion paint added to the landscape, and plasticard brick sheet to the retaining wall, and goods platform. 4 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 28, 2022 Author Share Posted August 28, 2022 (edited) Landscape coming along well now, up to the station area, and some more details around the canal with a derelict lock house. Wiring added for the garage workshop lights. Edited August 28, 2022 by M.R.P.G 3 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 28, 2022 Author Share Posted August 28, 2022 Canal walls painted with Engineers blue brick. Interior details added to derelict lock house. 4 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 28, 2022 Author Share Posted August 28, 2022 Nearly up to date now with the posts. This was 4.7.22 and Dave gave us a box of broken vehicles. So we thought we would use them for a scrap yard. A little more interesting than a usual car park. Lock gates also added. 7 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 29, 2022 Author Share Posted August 29, 2022 Horsehair PVA glued to the landscape. And then it’s cuppa tea time and biscuits . 8 1 Link to post Share on other sites More sharing options...
M.R.P.G Posted August 29, 2022 Author Share Posted August 29, 2022 Construction of the Station Hotel by Dave And the bridge side wall being cut to size which will be engineers blue brick using cardboard with plasticard glued on. 2 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now