Progress continues on the station throat.  Another piece of scrap ply has been found to provide more sub roadbed.  The track now runs all the way to the baseboard joint where the platform will start.  I've managed to make the curve slightly too tight.  No big problem, I just need to ease it of by about 3/4" as shown by the arrow in this picture...

 

post-2484-0-11335400-1540416858_thumb.jpg

 

post-2484-0-69071200-1540416897_thumb.jpg

 

post-2484-0-02945100-1540416983_thumb.jpg

 

post-2484-0-37661000-1540416993_thumb.jpg

 

Here is one of my new Dapol brake vans.  I do like the look.  It needs some weathering

 

post-2484-0-37254300-1540417038_thumb.jpg

 

Finally Dads Morris J van is in the yard. He widened the frame of the ladder rack to make full width loading platform, for furniture.firewood etc

 

 

 

post-2484-0-68599000-1540417013_thumb.jpg

  • Like 8
Link to post
Share on other sites

  • 2 weeks later...

Back home, I found time to do some track fettling, specifically slewing the pointwork outwards.  In doing so I have gained roughly an inch, to make the platform 15 feed wide. 

 

This first picture shows where the platform will end, and 2 coaches to show the relative length of the approach tracks.  It means that in O gauge, a loco running round it's train is more realistic timewise than OO.  The loco has to go further...

 

post-2484-0-58398800-1541259514_thumb.jpg

 

The short piece of track in the background is the roughed out line for the bay platform, the track alignment in the foreground is the final (or latest) alignment.

 

post-2484-0-75695500-1541259522_thumb.jpg

 

Next the smoother curved transition to the curved turnout.  The two inner tracks are still to be lines up

 

post-2484-0-11985500-1541259534_thumb.jpg

 

Two coaches show the space between for the platform.

 

post-2484-0-49203200-1541259682_thumb.jpg

 

Not sure what to make the platforms from, thinking of wood stripwood for the sides, with thin ply on top as the core.

 

  • Like 10
Link to post
Share on other sites

I had "Round 2" this evening, cutting a larger piece of ply to go under the track adjacent to the baseboard joint.  The trestle under the joint is a tad high, I need to fiddle with the heights to get rid of a very very slight 'hill' at that joint.

 

In this view you can see the very slight hill...  I also need to add the cosmetic front edge to the layout...

 

post-2484-0-67287400-1541287077_thumb.jpg

 

From this angle it looks better...

 

post-2484-0-74163700-1541287066_thumb.jpg

 

To counter sink the screws into the ply I used the tang part of this flat bit, seemed to have more control that a counter sink...

 

post-2484-0-41833100-1541287029_thumb.jpg

 

Here is my card platform mock up...  There are 2 coaches in the bay, with room for a Terrier and a luggage/pram van...

 

post-2484-0-05864400-1541287052_thumb.jpg

 

Finally a picture of the brick edged, grave platform, the effect I need to strive for...

 

post-2484-0-25120400-1541287032_thumb.jpg

  • Like 6
Link to post
Share on other sites

I’d not recommend modifying s Peco point to make a tandem, it’ll be difficult and I fear it will not look good. I have built two tandems over the years and they are rather fiddly - certainly much more so than a single turnout.

 

I can give you copies of my Templot files - assuming I can find them - so you can build from C&L or Peco components, or copper clad sleepers. But of course I built them for the specific locations, so they won’t be ideal for your track plan.

 

Alternatively, you could speak to Marcway who may have a suitable formation available, or would built a custom job if you need it.

 

HTH

Simon

Link to post
Share on other sites

I’d not recommend modifying s Peco point to make a tandem, it’ll be difficult and I fear it will not look good. I have built two tandems over the years and they are rather fiddly - certainly much more so than a single turnout.

 

I can give you copies of my Templot files - assuming I can find them - so you can build from C&L or Peco components, or copper clad sleepers. But of course I built them for the specific locations, so they won’t be ideal for your track plan.

 

Alternatively, you could speak to Marcway who may have a suitable formation available, or would built a custom job if you need it.

 

HTH

Simon

Simon

 

At the moment it will be the Y turnout. So any expansion needs to fit in the same footprint. I can print out the Y template and manually add the third track. Just thought that someone may have done this before.

I have a Fastraxx Rail Bender, so can precurve all the rail. What can go wrong.......

 

Thanks again

 

Ernie

Link to post
Share on other sites

This morning Matthew, I'll be looking at the Signal Box and the rodding routes.  As usual last night the brain box was thinking about the goals for today:

 

Eliminating the 'hill' at the join of the baseboards. 

 

Sort out the sub roadbed at the front to eliminate a very slight height differential.

 

Cut the sub roadbed to enable the cosmetic rodding to have constant solid support (I spent some time last week taking pictures of 'round' rodding....

 

post-2484-0-92301400-1541328112_thumb.jpg  post-2484-0-68996000-1541328116_thumb.jpg

 

Anything else will be a bonus...

 

I did actually take a drawing from the Internet and use it as a cut and paste starter for the signal box...

 

post-2484-0-12540500-1541327042.jpg

  • Like 1
Link to post
Share on other sites

Is anyone handy with one of the track planning aids to draw a three way point, based on a peco O gauge bullhead Y?

 

attachicon.gifHayling Island three way pic.jpg

 

attachicon.gifHayling Island three way.jpg

 

I'd like to add in to lead to the future goods siding and goods shed.  Any help appreciated,

 

Thanks

 

 

I would have to agree with Simon, I would have thought the dimensions would to be a tad too small to get a 3 way in on a point that is some 17.25" in length !

 

Play around on Templot, and that will give you the minimum dimensions recommended in 7mm 

 

Best regards

Craig.

Link to post
Share on other sites

Spent a couple of hours on the layout today, mainly house keeping on various things on the boards.  Some handy plastic trunking was used to 'rough out' the line of the curve that will form the front of the layout.

 

Here looking towards the platforms.  The plan is to have the frontage slightly higher than the track base

 

post-2484-0-42468000-1541371041_thumb.jpg

 

This is the ground contour that I'm looking to recreate..  The concrete post and stranded wire fencing will be vulnerable to catching sleeves etc, maybe a Perspex style protector at fence height may be desirable.

 

post-2484-0-70237500-1541371989.jpg

 

Looking towards Havant...

 

post-2484-0-16530300-1541371052_thumb.jpg

 

I've also made a start on the back board, using some handy thin MDF.  After getting it in place I spent a couple of hours fitting countersunk screws.  The top will be trimmed to suit the final contour later....  The surplus length nearest is to be trimmed to length to match the end of the board.

 

post-2484-0-64305500-1541371064_thumb.jpg

 

Finally tonight I did some manual cut and paste with some Peco Templates.  Using the Y as the basis I pasted elements of the left hand curved point over the top.  I'm going to use a Y in the same configuration to allow for possible expansion (probably not very likely....)

 

post-2484-0-49152500-1541370550_thumb.jpg

 

 

 

 

  • Like 3
Link to post
Share on other sites

I found time for some modelling today.  The aim was to get all the alignment issues sorted, I was using a Y at the entry to the goods sidings instead of the tandem 3-way of the prototype.

 

post-2484-0-33936000-1541875936_thumb.jpg

 

The peco box over the tie bar is to get the chop...

 

post-2484-0-56903600-1541875944_thumb.jpg

 

post-2484-0-10234900-1541875949_thumb.jpg

 

post-2484-0-81127200-1541875954_thumb.jpg

 

post-2484-0-62604500-1541875896_thumb.jpg

 

post-2484-0-98156300-1541875900_thumb.jpg

 

post-2484-0-42750600-1541875905_thumb.jpg

 

post-2484-0-59337700-1541875912_thumb.jpg

 

post-2484-0-75873000-1541875927_thumb.jpg

 

I am waiting to collect a sector plate from Tim Horn.  I don't need to turn the trains as they did not turn the loco's in reality.  A small run off board at the far end will allow parking for a number of Terriers.  It will give room to hotch the layout down to get a small board to model the approach road/car park area. 

 

 

post-2484-0-11876700-1541877239_thumb.jpg

 

 

 

 

  • Like 6
Link to post
Share on other sites

The joggle

 

I had a pushing session with 2 mark 1 coaches.  All fine on the platform lines, through the 2 curved turnouts.  I then tied them running into the goods yard.  The trailing bogie didn't like the cut out in the stock rail to take the switch on the trap point from the sidings.  I swapped the outer stock rail for a new piece of rail with a joggle bent in with pliers. 

 

Here is the as purchased cut out...

 

post-2484-0-01124800-1541885979_thumb.jpg

 

Here is the replacement rail...

 

post-2484-0-57733000-1541885159_thumb.jpg

 

post-2484-0-33439000-1541885141_thumb.jpg

 

post-2484-0-15219400-1541885155_thumb.jpg

 

Some work with a file would not come amiss....

 

post-2484-0-70925200-1541885202_thumb.jpg

Edited by The Bigbee Line
  • Like 4
Link to post
Share on other sites

  • RMweb Premium

Martin

 

Nice picture. If I won the lottery I’d build the whole bridge.

 

Any other pictures would be appreciated.

 

Thanks

 

Ernie

 

Hi Ernie, I've sent you a PM

 

Al

Link to post
Share on other sites

  • 2 weeks later...

Big big thanks to Al51 for some really useful pictures etc.

 

I have printed off a 'place marker' station building and cleared the board to have a dry run.  Using a piece of board to represent the platform it was set up and a few pictures taken for a comparison to the prototype.

 

post-2484-0-79810000-1543072312_thumb.jpg

 

Although there is some compression in the length of the platform, the key section from the buffer stops of the bay platform to the end of the platform near the run round points seems to match the length of the building.

 

post-2484-0-60509300-1543072316_thumb.jpg

 

I have also been looking at point operation and obtained some cables used in radio controlled aircraft to use with a 'Peter Denny' style simple mechanism made from small square timber.  Any suggestions are appreciated.

 

post-2484-0-24734400-1543072322_thumb.jpg

 

 

  • Like 2
Link to post
Share on other sites

Is that the mechanism where the 'lever frame' looks a bit like a piano keyboard with the 'keys' sliding forwards and backwards to actuate points/signals?

 

If it is, in ancient Bassett Lowke books/magazines, which I guess is where Rev Denny got it from, there is a 'recipe' for adding interlocking, using of all things small screw-eyes and lengths of strong twine! 

 

In short, you could add to realism by adding interlocking.

  • Like 1
Link to post
Share on other sites

Is that the mechanism where the 'lever frame' looks a bit like a piano keyboard with the 'keys' sliding forwards and backwards to actuate points/signals?

 

If it is, in ancient Bassett Lowke books/magazines, which I guess is where Rev Denny got it from, there is a 'recipe' for adding interlocking, using of all things small screw-eyes and lengths of strong twine! 

 

In short, you could add to realism by adding interlocking.

Yes, that's the one.  The clevis at the ends of the cable can be un-clipped, so the grand plan would be to make the frame as a sub assembly to be fitted under the baseboard top layer, with the 'levers' poking through a home at the rear of the baseboard, 

Any pictures of the Bassett Lowke frames would be appreciated,

Thanks

Ernie

Edited by The Bigbee Line
Link to post
Share on other sites

  • RMweb Premium

Is that the mechanism where the 'lever frame' looks a bit like a piano keyboard with the 'keys' sliding forwards and backwards to actuate points/signals?

 

If I remember correctly, Peter Denny actually used wooden parts from old piano keys to make his lever frames.

Dave.

  • Like 1
Link to post
Share on other sites

If I remember correctly, Peter Denny actually used wooden parts from old piano keys to make his lever frames.

Dave.

Dave,

 

I wish I had a time machine.  My late father did Furniture Removing and House Clearance, he must haver broken up hundreds of pianos, mostly uprights.  We always had one in the 'other room'.  There were wooden and cast framed versions.  Some of the strings were very thick.  The wood was top quality, but sadly most ended up on the fire.....

 

I'm on the lookout for some item to be the donor....

 

Anyone scrapping a piano??

Link to post
Share on other sites

Thinking about the Denny style frame, I wanted to avoid adding any additional resistance to the system as the Peco points do not need much force when operated without a micro-switch.  I think a cheap slide switch could provide the necessary latching.

 

The Peco turnouts need approx. 5mm of travel

 

post-2484-0-42272300-1543159662_thumb.jpg

 

A slide switch could be mounted with the tang sitting in a recess in the slide.  I know some slide switches have a round knobs  Now need to find one with a suitable 5 - 6mm travel...

 

post-2484-0-84261700-1543159663_thumb.jpg

Link to post
Share on other sites

  • 1 month later...

I suggest adding an “omega loop” between switch & points.

 

This is a simple springy loop created in your rod to allow any slight excess travel to be absorbed - traditionally formed in the shape of a Greek letter omega (️ Is the nearest my iPad will get, the upper part, otherwise an ohm symbol) but a zig-zag bend does just as well.

 

This is particularly important if the switch throw is more than the point throw, but also if you have appreciable lengths of wire, and/or your layout sees changes in humidity and/or temperature.

 

If the switch throw is less than the point throw, you’ll likely suffer derailments, sooner or later.

 

Best

Simon

Edited by Simond
Link to post
Share on other sites

  • RMweb Gold

Hi Ernie,

Something like this from RS?

 

Capture.PNG.bd68493d15c588f583b8c850f6016391.PNG

 

According to the spec sheet it has a switch travel of 4.57mm which, if you incorporate an "omega loop" as Simond suggests, should be about right.

 

I used very similar switches on my old N gauge layout, obtained from Maplins (sadly now gone) - I took a ruler with me to check the travel!

My "omega loop" consisted of a very simple "V" in the wire (like --^--), the size of which was determined by trial and error to give me the right amount of give in the steel rod.

I used DPDT switches, one pole for the frog and the other for the mimic panel leds.

Worked a treat.

 

Edited by GWR57xx
restore images
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...