Jump to content
 


Temeraire
 Share

Recommended Posts

  • 1 month later...
  • RMweb Premium
On 02/12/2019 at 21:49, Temeraire said:

Next, upper baseboards to build and fit. maybe there'll be a complete circuit by Christmas?

 

So New Year passed and I didn't quite make it for Christmas Day, but the top boards were in place and two complete circuits were laid by the turn of the year. Slow progress has been going on since and most of the junction is now laid as well, all with re-spaced sleepers! Last night was spent breaking up 'tea trolley' bridge after it was found to not be as reliable as I thought, plus I hadn't given thought to where to put it when not in place across the doorway and it would be in the way! The two slopes from the bridge now just drop into place when required and are a lot easier to store. Also last night I started planning/building the lifting flap/bridge for the top level mainlines across the door, so three steps forward but one back for the time being.

 

I'll post another update later this week with some pics of where it stands.

 

 

  • Like 12
Link to post
Share on other sites

  • 2 weeks later...
  • RMweb Premium

Evening all

 

Sorry a bit later than planned but a little pictorial update of progress with more to follow this weekend once the rain stops!

 

38_Topboardsin_191220.jpg.3b617df8d91a5683de0cdea9de43e6a1.jpg

 

Going back to December 20th and this view shows the top level baseboards painted and in place ready for track laying, and the two outer (up & down) loops were laid by Christmas but I don't appear to have any pics of that stage!

 

40_Liftingflap_200115.jpg.566f545f1df6678799334518dcef81d3.jpg

 

As mentioned above the 'tea trolley' bit the dust to be replaced by a lifting flap that was screwed into position yesterday once the paint had dried.

 

39_Flapopen_200115.jpg.34abeba9ab30482c6ac51b494e295b1d.jpg

 

Now with the flap lifted the two bridges that were removed from the trolley can be seen, there's a little more to finish these off but it can wait for a bit as they work fine for now!

 

41_ExfordSta_200115.jpg.b0f57f2e9f780cc40d3307a65b3a4056.jpg

 

To the right of the bridge is the first baseboard for other side of the shed where Exford Park station will be sited, and again this was screwed in place yesterday. The two outer curves will be the twin track lines through the station and on to the junction back on the other side completing the third and fourth continuous loops around the shed. The inner curve will be access to a yard in front of the station.

 

Also yesterday the four track part of the mainlines was completed once the curves were positioned to cross the doorway. I'll take some pics of this state of affairs tomorrow hopefully.

Edited by Temeraire
  • Like 14
  • Agree 1
Link to post
Share on other sites

  • RMweb Premium

Evening all

 

Nipped out to the shed this evening and took some pics of current state of play in the shed.

 

1220710976_43_Missinglink200117.jpg.0af7233e760c837f8dfb9dd37ce9a9c7.jpg

 

The missing link was completed from the top of the spiral to the top baseboards first.

 

42_ViewWest4track_200117.jpg.2a6435d17232d373f164b3356d26fef1.jpg

 

Yesterday the four track section was finished off and this is the view 'West' down the layout.

 

44_ViewEastJct_200117.jpg.5a5315e41e08e1ab131389f4d9f89d0b.jpg

 

View from the other end showing the junction where the top level loops leave and curve around to the other side of the shed to Exford Park. The track hasn't been laid from the two blue pins as yet as I was one point short, and hence the sleepers aren't spaced the same as the rest.

 

45_Droneview_200117.jpg.c946f666991c0794cbd4db7e013f68a1.jpg

 

Finally the drone view along the mainlines from the junction end.

 

Next move then is to complete the junction tracks and then get it wired so a train can circulate the shed at last!

Edited by Temeraire
  • Like 17
  • Agree 1
Link to post
Share on other sites

Shows what a difference re-spacing the sleepers makes - useful to see the ‘with’ and ‘without’ side by side for comparison. I wasn’t sure whether it was going to be worth the effort but you’ve convinced me it is now!

Link to post
Share on other sites

  • 2 weeks later...
  • RMweb Premium

Evening all

 

Two more weeks pass with only limited progress but all the tracks are now laid and wired up across the lifting bridge. The crossover that gives access to both Exford Park yard as well as Exford stabling point has its point motors fitted and programmed.

 

46_Bridgetracks_200130.jpg.c4403d0104835e21e9079dc9a0909e47.jpg

 

The next move is cutting all the rails across baseboard joints so the boards can be up ended to wire them up and trains run for a bit to 'test'! (Running trains will happen I promise, but I know I keep saying it!)

 

I doubt much will get done this weekend though as a party of four of us Southerners are off to the Stafford Exhibition on Saturday by train.

Edited by Temeraire
  • Like 14
  • Agree 1
Link to post
Share on other sites

Looking really good Ian, and the sleeper spacing does make a big difference.

 

Hope you enjoy Stafford, I'll be there on Sunday, and it'll probably be my last visit to that Show after I move Souf I would think.

  • Like 1
  • Thanks 1
Link to post
Share on other sites

  • RMweb Premium

Evening all

 

Dropped into the shed earlier and took some pictures but there seems to be a problem with the camera?:jester:

 

Ogauge1.jpg.66bdc63885d008ccb950fc710089f050.jpg

 

Something isn't right?

 

Ogauge3.jpg.437a9d5d195f78184aab54785859a2e4.jpg

 

Ogauge2.jpg.b9a3908010de0475b8a64bdf7f7b210a.jpg

 

I'd better go and have another look.

 

Laters.....

Edited by Temeraire
  • Like 10
  • Funny 4
Link to post
Share on other sites

28 minutes ago, Temeraire said:

Evening all

 

Dropped into the shed earlier and took some pictures but there seems to be a problem with the camera?:jester:

 

Ogauge1.jpg.100c296d865dc5999f669037916d80d1.jpg

 

Something isn't right?

 

Ogauge3.jpg.1d6477b8ea7507389b6fe5eb0414516e.jpg

 

Ogauge2.jpg.c91f78e8678367bfeab0acf0d7480e9d.jpg

 

I'd better go and have another look.

 

Laters.....

And the t s how it starts. Then you want a couple of wagons and then you think I need to run them on something. 

That Crompton looks a beast. 

The oo is looking good to Ian.

 

Cheers Peter.

  • Like 1
  • Thanks 1
Link to post
Share on other sites

Seven Mills cant wait to get Souf now, I must admit, I had a great fight between the right and left hands at Stafford, The right wanted to open the wallet but the left said NO NO NO, but that NSE 50 did look the Dogs Nuts.:good:

 

You lucky lad.:sungum:

  • Like 2
Link to post
Share on other sites

  • 1 month later...
  • 3 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...