RMweb Gold PaulRhB Posted March 17 Author RMweb Gold Share Posted March 17 4 Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted March 17 Author RMweb Gold Share Posted March 17 Well the BIG backscene worked ok although we had a few issues as no power until opening time so no time to fault find. Two 4/4ii’s that ran well at Compton played up with contact problems. But it settled down and ran pretty well. The other issues are easy to sort. They seemed to enjoy it! 14 Link to post Share on other sites More sharing options...
RMweb Gold roundhouse Posted March 17 RMweb Gold Share Posted March 17 Paul Looking very good. Interesting design for the fiddleyard having walls on three sides. Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted March 17 Author RMweb Gold Share Posted March 17 34 minutes ago, roundhouse said: Paul Looking very good. Interesting design for the fiddleyard having walls on three sides. That didn’t work very well as the traction tyres on the locos made using the railers a bit unreliable. It’s only a temp fy until I build the yard anyway. 2 Link to post Share on other sites More sharing options...
Gook the Goblin Posted March 17 Share Posted March 17 The video was great Paul. Really liked the freight train. The layout looks superb, well done. Nigel 1 Link to post Share on other sites More sharing options...
RMweb Gold PaulRhB Posted March 17 Author RMweb Gold Share Posted March 17 33 minutes ago, the Goblin said: The video was great Paul. Really liked the freight train. The layout looks superb, well done. Nigel Neil’s freight stock :) 1 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now