Jump to content
 

Bonsai RhB in Nm9


PaulRhB
 Share

Recommended Posts

  • RMweb Gold

IMG_5225.jpeg.9ac3e58b68e2209ecf5b3c33c663f48f.jpeg
 

IMG_5239.jpeg.8df8d2f062b6728cda9ec4d6d194cf89.jpeg

 

Well the BIG backscene worked ok although we had a few issues as no power until opening time so no time to fault find. Two  4/4ii’s that ran well at Compton played up with contact problems. But it settled down and ran pretty well. The other issues are easy to sort. 
 

IMG_5233.jpeg.b7b3a4d11892460084799e06d7053784.jpeg

 

IMG_5231.jpeg.4ffcf1ea51bdfb743920e85e499f5b42.jpeg

 

IMG_5219.jpeg.79fee4dd64f602a2bd7ba024d2993882.jpeg

 

They seemed to enjoy it!

 

IMG_5207.jpeg.eb627fdf98b4a03efd44a4bc5b277ef2.jpeg

 

IMG_5210.jpeg.d2b1b07a80ed11c84c3d0343cb434dad.jpeg

  • Like 14
Link to post
Share on other sites

  • RMweb Gold
34 minutes ago, roundhouse said:

Paul

 

 

Looking very good.

 

Interesting design for the fiddleyard having walls on three sides.


That didn’t work very well as the traction tyres on the locos made using the railers a bit unreliable. It’s only a temp fy until I build the yard anyway. 

  • Informative/Useful 2
Link to post
Share on other sites

  • RMweb Gold
33 minutes ago, the Goblin said:

The video was great Paul. Really liked the freight train. The layout looks superb, well done.

 

Nigel


Neil’s freight stock :) 

  • Like 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...