Jump to content
 

Mainsforth Terrace - West Hartlepool in the 60s


AJ427
 Share

Recommended Posts

  • 3 weeks later...

A little more progress over the Christmas break.

First up, the coal chutes have had their chains and balance weights added:

 

post-7745-0-28439300-1546446697_thumb.jpg

post-7745-0-01511600-1546446704_thumb.jpg

post-7745-0-79189400-1546446714_thumb.jpg

 

Handrails have been added to both sets of stairs on the coal stage and the whole assemblies have been fixed in place. Further detail in this area has been the addition of a timber screen between the stairs and the retaining brick pier that holds up the ramp. The three piers have had their concrete tops added.

 

post-7745-0-34718300-1546446740_thumb.jpg

post-7745-0-11646000-1546446753_thumb.jpg

post-7745-0-58167900-1546446768_thumb.jpg

 

Finally, a start has been made on the water cranes. Photographs appear to show these in the ubiquitous silver/grey galvanised paint rather than any earlier LNER colours so that’s what I’ve gone for.

 

post-7745-0-17147300-1546446779_thumb.jpg

post-7745-0-88715200-1546446786_thumb.jpg

 

  • Like 11
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • 1 month later...

A good while since an update. A few small jobs first:

The water cranes have been painted and weathered, shown here plonked in place.

The section of broken and odd-shaped paneling has been added to the coal stage.

 

IMG_4018.JPG.626a1edddd50634dba981f00d7df5fba.JPGIMG_4017.JPG.5e43208f68baf517ec133b831ef652e1.JPG2102870231_OverviewStack.jpg.925dce832b287032055d7ec3b5118e19.jpg

 

Mostly I have been completing the water tower. It took a while to get it to this stage. The corbelled brickwork is very much a simplified version of the prototype structure but still a time-consuming exercise. The lamp is from layouts4u. The balcony is still to be added.

 

Construction.jpg.ec9bc6a5a32a0f2269c855f4100e671b.jpgIMG_4012.JPG.d28d5d5dd0981969001564e1d3363e77.JPG334132792_TwilightStack.jpg.9328c7696c056645cbded7a84d94894e.jpg

  • Like 6
  • Craftsmanship/clever 4
Link to post
Share on other sites

With the tower base complete the next job was to paint and weather the tank and add the concrete balconies and ladders. The balcony seems to be a later add-on given that it covers the tops of the ground floor windows. There’s a lot of artistic guess-work involved here since I have no photographs showing the north end of the tower and the building between it and the softener.

 

Construction2.jpg.ffbb008a6d98adfe9eea61cb146c15f7.jpgIMG_4082.JPG.bf4cedc281398d85a9e0c9147a130346.JPG

  • Like 6
Link to post
Share on other sites

With that done it was time to add the water. First, the tank interior was painted with a greenish-brown up to my desired level. Once dry this was varnished with acrylic.

1456179463_readyforwater.jpg.cef8d7808bf7c70825fc5f521027cb4f.jpg

 

For the water I used Woodland Scenics Deep Pour Clear. This was not without some difficulty. I’d set my level at around 12mm, just less than the recommended single pour depth. Following the instructions to the letter the pour was completed and covered in a foil cap. All looked well until I checked back after an hour to find that the mass of water had contracted away from the tank sides and into a raised blob somewhat like a flattened fist. The hairdryer wouldn’t touch it.

giphy.gif.e03bb145d99bdc18379c8b934772833e.gif

 

Fortunately, the level was still well below the rim. I added another thin layer after another couple of hours, making sure to cover the protruding ‘knuckle’ structure. This was much better although some shrinkage occurred leaving a little bit of the knuckle still exposed. The underlying structure was also still visible at this point. You can see this in the following image to the top right side of the tank.

pour2.jpg.115c9a1ad34e09d90143f277fdab28db.jpg

 

A third layer was added after another few hours and this set fully flat. Once fully cured the underlying layers had vanished. There is a slight film on the surface, but this is barely noticeable from the normal viewing angle and actually quite pleasing, looking a little like scum.

scum.jpg.dbb13e5c87fe65fc196fd70e327391a3.jpg

pour3-view.jpg.59e7c70c640a69a7d0671e9eb7f40800.jpg1295896115_pour3-fullycured.jpg.692e9de70be65747e54e719b731bd839.jpg

 

I can only assume that the initial volume was too much or that it was something to do with the recommended foil cap.

 

Next job is the adjacent diesel fueling point.

  • Like 10
  • Craftsmanship/clever 1
Link to post
Share on other sites

At the weekend I made a start on the fueling point. To build the structure as per prototype/photographs would require more space than I have and would be overpowering at the front of the scene so this is a much reduced version to give a feel of the facility. The scratch-built base is a plastic I-beam structure that the tanks sit upon. The adjacent area will house the pump equipment, etc. I'm using parts from both the Ratio and Knightwing kits for the tanks and pumping gear.

 

IMG_4203.JPG.f2dd3c78ea5f1bd3602acd86ee7c221b.JPG

 

This image shows the mock-up of the facility in-situ.

 

IMG_4205.JPG.fac4d290e3f5c02fde98d2ba570011e5.JPG

  • Like 2
Link to post
Share on other sites

  • 2 months later...

Hello. I hadn't realised how long it had been since an update. A couple of posts to bring us up to date:

 

The turnouts have been further detailed with cosmetic rail joints scored into the tops of the rails and C&L fishplates added.

 

Detailing and painting continued on the fueling point. The oil stains are a Humbrol gloss oil product. The hoses are made from heat shrink sleeves. A larger size is used and shrunk down to the correct size and shaped to suit whilst still warm. Heat shrink was also used for the water crane hoses. The building adjacent to the fuel tank structure is a Stoneybridge models laser-cut kit.

 

Ballast and ground cover was started - time consuming and not terribly interesting to look at.

 

IMG_4321.JPG.7e8f8e72511665a96eb06609f6208478.JPGIMG_4333.JPG.35a4770be1f0a0a3458b98130c28730c.JPGIMG_4437_crop.jpg.99682c490f012cb2fc7e9c034adb90e7.jpgIMG_4249.JPG.19c6dc4e654a732266207980ffcabb04.JPG

IMG_4332.JPG

  • Like 9
Link to post
Share on other sites

7 minutes ago, Barry O said:

Lummy! A clean Q6....in West Hartlepool.....must be back from a visit to Darlington!

Baz

Hah! It won't stay that way for long. A weathering session is planned...

  • Like 1
Link to post
Share on other sites

  • RMweb Premium
2 minutes ago, Two_sugars said:

Not enough "PHILPH", Baz. 

 

 

John

I know...I have a lovely colour photo of a West Hatlepool Q6..just not got around to having a go at my two...

 

Baz

  • Like 1
Link to post
Share on other sites

You don't need a colour 'photo . . . . just dirty black, even blacker, and philphy black.

 

By t way, I read somewhere that Easington Colliery used the odd loco from Sunderland shed and was wondering if Horden did also.

 

 

John

  • Like 1
Link to post
Share on other sites

  • RMweb Premium
On 01/05/2019 at 21:27, Two_sugars said:

You don't need a colour 'photo . . . . just dirty black, even blacker, and philphy black.

 

By t way, I read somewhere that Easington Colliery used the odd loco from Sunderland shed and was wondering if Horden did also.

 

 

John

I remember the odd bit of grey and burnt rust colours...

Most of the coal from Horden went south. The yard was really set up to go south..can't remember seeing  a train reverse out of the yard too go north. Mind you I was only a bairn at the time...

Baz

Edited by Barry O
  • Like 1
Link to post
Share on other sites

OK, time to bring us up to date.

As of last weekend most of the ground cover is now down and blended in. I've used texture paint on top of modelling clay for this. It's maybe a little too rough looking, but photos I have show that the ground was actually quite rough and broken in places, more so than compact. I may yet sand some of it down. It's hard to see on these pics but the piles of ash next to the pit are actually sieved BBQ briquette ash. A few small bits of greenery have also appeared. I won't be overdoing this but I think it helps to soften the otherwise desert-like landscape.

Test fit of the yard lamps - the next job will be wiring everything up and adding the outer box structure before I can fix the front buildings in place.

The Q6 is still not weathered, but it is gaining a layer of dust...

 

51C_stack01.jpg.432517a14f5e9a8dab2d951fd26c789d.jpg51C_stack02.jpg.3632150d2a61d0269d5a7b855800b3ef.jpgIMG_4441_crop.jpg.b102e58cab2144353b9a894ec2b228fd.jpgIMG_4449_crop.jpg.69380ebac166e158689b1fe5bb8e7baa.jpgIMG_4466_crop.jpg.e50262b3a4b0a5a51ef68e94cc70a59f.jpgIMG_4471_crop.jpg.15983b3968cdddf550567e46bda7dbb7.jpgIMG_4473_crop.jpg.a08613326286c78402e17aa8f2f734d1.jpg

 

 

  • Like 14
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • 11 months later...

With time on my hands it's time for a long overdue update :lol:

A big push towards the end of last year saw the layout almost complete - just a few details to add now.

 

Work done in no particular order:

 

  • Outer carcass and lid constructed and painted dark grey.
  • LED strip lights added to lid. Initially these were daylight white but I felt them to be a bit weak and too blue so I've since added some more warm white strips.
  • Backscene added. I created a simple graduated sky in Photoshop and had this printed onto self-adhesive sheet. This in turn was applied to a thin styrene sheet and laminated onto curved hardboard. For the visible section to the left where the backscene joins the horizon, I've added a ramshackle fence. This is a laser cut product from Model Railway Scenery.
  • Fiddle yards built. They are a cassette with a mini jack socket at one end that drops onto mini jack plugs on the board surface. This provides power as well as a swivel point to turn them into sector plates. The system works, but in hindsight they are a bit short so I may make a larger version.
  • All on layout lighting fitted and wired up. This includes freestanding yard lights and lamps on buildings and structures.
  • Wire-in-tube turnout actuators fitted with levers to front. Polarity is changed by Gaugemaster auto switches.
  • Frontage to main shed building to the right. This is a small part of the roundhouse frontage that leads off-stage.
  • All buildings fixed in position.
  • Surface water added. Photographs show floods of water around the water cranes. I left gaps and pits in the ballast to allow for this and filled it with Woodland Scenics Realistic Water.
  • Foliage added. A few grass tufts and my attempt at creating Rosebay Willowherb (aka fireweed). The latter is essential small twigs dipped in PVA and then green flock to the lower parts and a pinkish mix to the top. The top is cleared of flock to provide the pointed appearance of the plant.

 

Still to do:

  • General shed detritus to add such as oil drums, brake blocks, wheel barrows, loco tools, etc.
  • Staff to add.
  • The coal tippers for the coal stage. These are the pram-like buckets typical of NER sheds. I'll need a few of these so I might have to create them as a bespoke etch. Anyone know of any good pictures or other details?
  • Loco fleet to renumber. This is ongoing at the moment. Once done I can set about weathering.
  • Recently acquired Class 24/1 to be modified into 25/0.

 

More soon.

 

 

 

IMG_2474.JPG

IMG_2483.JPG

IMG_1619.JPG

IMG_1651.JPG

IMG_1659.JPG

IMG_2075.JPG

IMG_2421.JPG

IMG_2436.JPG

IMG_2438.JPG

Edited by AJ427
  • Like 13
  • Craftsmanship/clever 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...