timbowilts Posted January 9, 2019 Share Posted January 9, 2019 I’ve just been browsing the Hornby website looking at the new Collett non-corridor coaches and I’m puzzled. I know that corridor stock was “handed” so that sets could be marshalled with the corridor always on the same side of the train. I was not aware that the same principle applied to non- corridor stock or have Hornby doubled their tooling costs in error? Tim T Modelling Cwm Cynon in EM Link to post Share on other sites More sharing options...
Miss Prism Posted January 9, 2019 Share Posted January 9, 2019 http://www.rmweb.co.uk/community/index.php?/topic/140670-Hornby-new-tooling-57-bow-ended-suburban-coaches/ Link to post Share on other sites More sharing options...
timbowilts Posted January 9, 2019 Author Share Posted January 9, 2019 All is now clear Tim T Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now