Jump to content
 

Hornby’s new Collett non-corridor coaches


Recommended Posts

I’ve just been browsing the Hornby website looking at the new Collett non-corridor coaches and I’m puzzled.

I know that corridor stock was “handed” so that sets could be marshalled with the corridor always on the same side of the train. I was not aware that the same principle applied to non- corridor stock or have Hornby doubled their tooling costs in error?

 

Tim T

Modelling Cwm Cynon in EM

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...