Jump to content

NGaugeTom

6x1 Quarry / Aggregate Layout - set in the 80s/90s

Recommended Posts

On 11/06/2019 at 19:48, Duncan. said:

Hi Tom,

The layout is looking great. I have already bought some of the finetrax range and after seeing your results I am determined to make a small layout using finetrax product. I do have a question, how do the stock and locos perform, is running improved (slow speed for example through the pointwork) compared to Peco streamline?

Cheers

Duncan

Hi Duncan,

Thanks!  I was a bit unsure at first whether I'd have any issues as some of my stock is around 15 years old so I didn't know whether I'd have any issues with flanges, especially through the points.  So far I have had one issue, which was on a Class 47, but that was due to the back-to-back gauge not being quite right on one of the wheelsets, but with a quick adjustment, it works flawlessly.  I've run wires to every individual rail on the layout, including the point blades and this has meant I can crawl any loco slowly through the points without it juddering to a halt.  From my experiences so far I'd say it is better than the Peco track, the gaps between the frog and blades is smaller so less chance of a stall and the overall appearance of the track is so much more realistic.  I'd highly highly recommend it, and I've also seen Waynes now making concrete sleeper flexi track and single slips so now I just need another layout to try those out!

 

Cheers

Tom

  • Like 1

Share this post


Link to post
Share on other sites

I've only just stumbled across this thread. It's a super layout project and very well executed.

 

G

  • Like 1
  • Agree 3

Share this post


Link to post
Share on other sites

Buildings have been primed ready for painting and weathering but that can wait for now - actually ran some trains today!  Pic of the Farish Class 37 'Tre Pol and Pen' about to run around the hoppers.

 

 

class37-1.JPG

  • Like 18

Share this post


Link to post
Share on other sites

Only just found this - nice work Tom.

 

The track looks great as do the cluster of buildings...staying tuned :good:

  • Agree 1

Share this post


Link to post
Share on other sites

 

So the last couple of weeks haven't seen much change on the layout in terms of buildings, I'm researching and finding the right colours for the buildings...but...in the meantime, I have fitted a Zimo sound decoder to a Class 37 and I'm super impressed - it's my first sound install and it's working very well.  Really enjoying the layer it adds to the hobby - I think the next few years birthday presents may include some more sound decoders!  After completing that install I was looking at some of my old DC loco's that I've yet to chip.  I'm always up for a challenge so I've also converted an old Dapol 0-6-0 Terrier, which, after initial testing really wasn't that great, it has such a small wheelbase and as it passed over any frog or very very slightly uneven section of track it would grind to a halt - not ideal when all I want to do is some slow shunting in the facility.  So after getting frustrated with it constantly stalling I decided to try and squeeze a stay alive circuit into the cab - along with the original motor resistors, the Lenz Silver Mini chip, a stay alive circuit chip and a 330uf capacitor.  I had to sacrifice the small metal weight which sat in the back of the cab to fit the capacitor but it all fits, tightly but it fits.  It now works in a very similar way to the real loco due to not having much weight to it.  It seems very happy pulling 3 or 4 wagons or 1 coach, which is absolutely ideal for my needs.  The engine driver figure is hiding all the gubbins but I will probably replace him with someone that's not waving.  Super happy with this loco now, I can crawl her along at more realistic speeds, she doesn't stall at all on frogs or dirty track, there's just enough juice in the 330uf capacitor to keep her rolling if there's a momentary loss of power.  Although I'm basing the layout in the early 80's, I'm sure Stepney will now make a daily appearance :) 

WhealEndUpdate37.JPG

WhealEndUpdateStepney.JPG

WhealEndUpdateStepney2.JPG

  • Like 10

Share this post


Link to post
Share on other sites

Almost a month has passed since the last post, no idea where the time goes!  Been busy this month so the modeling has slowed down a pace, but I've managed to get some paint on to one of the main buildings on the layout and I've also added some foliage to parts of the layout (I think this is one of the most frustrating things to get right!).  I've also removed the hopper from the second siding for the time being as I think it overcrowded the scene, after operating it for an evening without it on I think I prefer seeing the trains more than hiding them in a hopper.  Thoughts are the wagons will be loaded via digger instead.

Railway Update 3 July.JPG

Railway Update 1 Jul 2019.JPG

Railway Update 2 Jul.JPG

  • Like 17
  • Craftsmanship/clever 2

Share this post


Link to post
Share on other sites

Very nice work.

What is the pedigree of the vehicles?

 

G

Share this post


Link to post
Share on other sites
16 hours ago, grahame said:

Very nice work.

What is the pedigree of the vehicles?

 

G

Thanks :) I'm not entirely sure where the vehicles came from, I've had them for years stored away.

Share this post


Link to post
Share on other sites


Must say this is really impressive, are you sure it's not 4mm scale ? ;) Reminds me of Chris Nevard's 'Cement Quay' layout.

  • Agree 2

Share this post


Link to post
Share on other sites
On 30/07/2019 at 16:50, NGaugeTom said:

Almost a month has passed since the last post, no idea where the time goes!  Been busy this month so the modeling has slowed down a pace, but I've managed to get some paint on to one of the main buildings on the layout and I've also added some foliage to parts of the layout (I think this is one of the most frustrating things to get right!).  I've also removed the hopper from the second siding for the time being as I think it overcrowded the scene, after operating it for an evening without it on I think I prefer seeing the trains more than hiding them in a hopper.  Thoughts are the wagons will be loaded via digger instead.

https://www.rmweb.co.uk/community/uploads/monthly_2019_07/151593561_RailwayUpdate3July.JPG.40161179060af7eff8c94c77bf9098eb.JPG

https://www.rmweb.co.uk/community/uploads/monthly_2019_07/1608418311_RailwayUpdate1Jul2019.JPG.06ac055a8d9b50f6911e55ee0c46d336.JPG

https://www.rmweb.co.uk/community/uploads/monthly_2019_07/1239812227_RailwayUpdate2Jul.JPG.3a764a5efdc974573d4227619af1c553.JPG

 

This really is an excellent layout and the Finetrax makes a real difference to the appearance. If only more people would use it. I do disagree, however, about the hopper as the left hand end of the layout now looks rather unbalanced without it.

 

David

  • Agree 1

Share this post


Link to post
Share on other sites

Thanks for the kind comments!  I've always been inspired by Chris's layouts - it was seeing what he could achieve in such a small space that finally made me decide to dust off the storage boxes.  I've always liked the 'facility' layout as it seems far more interesting to operate in a smaller space than a minimum space station would be.  I've also added the hopper back in, I found the right shade of green and after one coat it's beginning to sit better for me.  Just a lot of weathering to go and it'll look the part :)

 

RailwayUpdateAug.JPG

  • Like 6

Share this post


Link to post
Share on other sites

I'm still slowly painting up the buildings but have been distracted by building the fiddle yard board.  I decided that rather than have a plain old fiddle yard board, that I would try and hide the storage sidings behind another modeled section.

 

1692182433_RailwayUpdateSep7.JPG.3e06427b3adfec84e04edb8c4b7446cf.JPG

 

The board is from Model Railway Solutions and measures 3x1, making the overall length of the layout 6x1.  I'm thinking the front tracks on the board (the concrete and wooden sleeper track in the picture) would be the modeled section, whilst the rear sector plate would be hidden.  The front sector plate would also be hidden and is just long enough to house a two-car DMU  or short freight working, I'm thinking the wooden sleeper front siding will be used as a stabling/fueling point to store the growing loco collection and add operating interest.  Although there will be a scenic break between the facility/quarry end and this board, it'll be nice to model two different sections of line on the same layout.

 

Another job that's been sat on the workbench for a while was converting a 08 for the layout.  There was just enough room to squeeze a Lenz Silver mini decoder in and a stay-alive chip from YouChoos and it crawls along very happily.  The sun was coming through the window this evening and I couldn't resist a couple of pics...

 

279256908_RailwayUpdateSep1.JPG.2220980b691e1b2424589464ad206713.JPG

1230720617_RailwayUpdateSep2.JPG.6114bf34ac9fc69d770079a80282ffb4.JPG

447768606_RailwayUpdateSep3.JPG.05e2e8881532037f73a8951328000526.JPG

 

Just needs a good weathering now!

  • Like 18

Share this post


Link to post
Share on other sites

 

Hi Tom,

 

Great layout.  As others have said, the Finetrax really lifts it.

 

And I am glad you reinstated the hopper over the second siding!

 

cheers

 

Ben A.

Share this post


Link to post
Share on other sites

Ive only just came across this thread and I must say you are doing a cracking job.

  • Agree 1

Share this post


Link to post
Share on other sites
On 30/07/2019 at 16:50, NGaugeTom said:

Almost a month has passed since the last post, no idea where the time goes!  Been busy this month so the modeling has slowed down a pace, but I've managed to get some paint on to one of the main buildings on the layout and I've also added some foliage to parts of the layout (I think this is one of the most frustrating things to get right!).  I've also removed the hopper from the second siding for the time being as I think it overcrowded the scene, after operating it for an evening without it on I think I prefer seeing the trains more than hiding them in a hopper.  Thoughts are the wagons will be loaded via digger instead.

https://www.rmweb.co.uk/community/uploads/monthly_2019_07/151593561_RailwayUpdate3July.JPG.40161179060af7eff8c94c77bf9098eb.JPG

https://www.rmweb.co.uk/community/uploads/monthly_2019_07/1608418311_RailwayUpdate1Jul2019.JPG.06ac055a8d9b50f6911e55ee0c46d336.JPG

https://www.rmweb.co.uk/community/uploads/monthly_2019_07/1239812227_RailwayUpdate2Jul.JPG.3a764a5efdc974573d4227619af1c553.JPG

 

What a stunning little layout. So simple yet so atmospheric.

Share this post


Link to post
Share on other sites

A very nice model, but why the signals?

This is either an industrial line or would be worked as a long siding from the main line so signalling would not be required.

 

Gordon A

Share this post


Link to post
Share on other sites

Thanks all for the kind comments :)

 

 

I've been busy painting and weathering the buildings this month.  I've added some signage (which needs weathering) and once the buildings are complete then they'll be set in place and blended in with the road or static grass added around the bases.   I also need to finish off the static grass on the right-hand side of the layout around the road. 

 

Apologies for the poor quality of pictures - using my phone again but hopefully after a lighting tweek the colours are looking a bit more realistic - I've borrowed a DSLR so will be taking some better pictures soon.

 

RailwaySept01.JPG.46c909690e9cdf9edfe51015592a90a7.JPG

 

I think I may keep the hopper but may move its location to the rear shorter siding,  this will allow trains arriving at the facility to use the longer middle siding.

 

RailwaySep02.JPG.cd2e2d409300e151d0c4553029c6b189.JPG

 

RailwaySep03.JPG.f0cd4c574fc4811995645e6128f16fe2.JPG

 

The second baseboard is coming along well too, and the beginnings of a small loco servicing facility are taking shape.  This 3-foot board is predominately a fiddle yard but I wanted to avoid just having a fiddle yard board.  The thought here is that I can run my 2 coach DMU along the front track whilst loco's not required in the facility can be moved to the shed.  Having spent an evening playing trains this makes the layout much more interesting to operate.  The board has two 3-track sector plates on it, one hidden on the right-hand side to feed the shed and branch line and one longer sector plate hidden behind the whole scene.

 

RailwaySep05.JPG.88207d0c945ba94d2163890c908aac00.JPG

 

As for the signals, I had them in my box and thought why not - with the working ones, having a few more switches to operate to control movements makes the whole layout more enjoyable to operate. 

 

I realise I need to take some pictures with some trains on the layout!!

 

Tom

  • Like 13

Share this post


Link to post
Share on other sites

A few more pics from the layout - with some traction!

 

A few Railfreight and BR workings today :)

 

07RailwayLR.jpg.426a68d2636c4953bd4cc77f45daaa7d.jpg

 

I still need to set the buildings in and finish off the static grass before adding vegetation.  Getting there!

 

03RailwayLR.jpg.ca6fffe395110c9485f73bfc188ec1bb.jpg

 

None of the structures, including the pipework are fixed in position yet.  I'm still painting and tweaking so that's why the a-frame supports look a bit off in this picture.

 

05RailwayLR.jpg.ebbbf1a3b4ef858d5b209d3525982bb1.jpg

 

08834 sat in the rear siding between workings.  Now it's chipped I've begun the weathering.

 

08RailwayLR.jpg.38f8ba478e29cf8a3f2de5906abb82fa.jpg

 

The Class 37 Grainflow was the first loco I've installed sound on and it works fantastically well, seen here slowly pulling trucks through the hopper.

 

11RailwayLR.jpg.94e610b635b9d1ba2a756b4c853f4b9c.jpg

 

Jumping to BR Blue (my other favourite period) 33030 enters the facility with a rake of empties.

 

More to follow.....

 

 

 

 

 

 

 

 

  • Like 14
  • Craftsmanship/clever 2

Share this post


Link to post
Share on other sites

A couple more pics....

 

13RailwayLR.jpg.6c26d44b6091ebdd7050c9982a431bdd.jpg

 

33030 sits in the rear siding between workings.  This is a Dapol model, which creeps along and is excellent for shunting with the kadee couplings.

 

14RailwayLR.jpg.9c90005d95a45b03f2e553bf481cc275.jpg

 

The overall view of the layout :)   A class 47 is about to leave the yard and head towards the stabling point further up the line whilst the driver of 33030 has a well-earned cuppa in the yard office.

 

That's it for now.  I've also got a few class 66's that will appear at some point in the future :)

 

  • Like 16
  • Craftsmanship/clever 1

Share this post


Link to post
Share on other sites

Hi

 

Some excellent pictures that capture the scene & make it look very realistic.....

 

Some lovely modelling....Well done......

 

Cheers Bill

Share this post


Link to post
Share on other sites
Guest JiLo

Absolutely superb layout!

Share this post


Link to post
Share on other sites

Thanks all :)

 

I've just had a couple of lamp kits arrive from CR signals so there will be light in the quarry and shed soon! :)

Share this post


Link to post
Share on other sites

The CR signals lamp kits are now built and ready for painting, I was a little surprised at the size of the LED's - you can just about make one out above the £1 coin in the picture.  After a few curses I've built up four lights, two double lights and a single light for the quarry, and then a single lamp with a ladder for the loco shed.  Just hoping they survive the priming and painting stage now before they're installed :)

 

 

 

Railway Lamps 2.JPG

  • Like 2
  • Informative/Useful 1

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.