Jump to content
 

Mason Street (Goods) BR Blue.


Andrew P
 Share

Recommended Posts

7 hours ago, Bogie said:

I have been overseas since mid-March (cycling in the Alentejo region of Portugal is highly recommended) and Mr P is already three pages into a new topic!

 

True to form I see there is a slightly modified plan already - I anticipate a few more.

 

Three (3) layouts on the go and two (2) different scales - all at the same time!  I bet in your younger days you were the guy at the circus who rode a motorcycle blindfolded on a tightrope over a cage of lions with a pretty young girl doing a hand stand on your shoulders.

 

You never fail to impress!

Cheers Bogie, :offtopic: I'm not sure about riding over Lions in a Circus, but we did pass a Moto Cross Shop at Hazel Grove yesterday, I did comment that I really missed my Moto Cross Days.

I can cope easily with the two Scales / Gauges and hopefully soon Bala Town will be moving on to pastures new once the Photos are done for the Mag Article.

  • Like 1
Link to post
Share on other sites

I've managed to get the wiring done this morning, simple Track Feeds and Points fed from a 12V DC Wall Wart Transformer instead of 16V AC Transformer, as I had one in stock. Unfortunately it doesn't have enough kick to throw two points at the same time for the Crossover, but I can live with that.

 

Plug ins from left to right are,

12V DC Point Power, 

Centre two, Programming Track feed.

Right, Track Feeds,

IMG_7119.JPG.368d50bcc45fd2d2c6a05eb8aaa0c1e9.JPG

 

 

Point switches are

1,= to Prog Track / Loco Spur,

2, = Crossover from Main, (see X indicates that 2 & 3 work together) 12V hasn't enough kick to throw the 2 together.

3, = Crossover from Departure Road, (and see above)

4, = Arrivals / Departure Sidings,

5, = Warehouse Siding,

6, = ''Y'' for front Yard / rear Yard / Parcels Siding,

7, = Rear Yard and Parcels Siding.

8, = Programming Track / Loco Spur.

EDIT = Since posting the above, I've moved the switch for the Prog / Main switch to the left end next to the Switch for the Track it relates to, and moved the rest along one.

 

1223185156_TrackPlan.png.63a2b09eb54752deecf84c87fb0fc0b8.png

The Road Bridge and embankment will cover the Switch panel.

 

 

Edited by Andrew P
add words
  • Like 9
  • Informative/Useful 1
Link to post
Share on other sites

Thanks Ade, I didn't see you at the OLD Club last night, but I only stayed an hour or so. 

 

I went around to Big John's for an hour afterwards, and he is doing well with his project.

  • Like 1
Link to post
Share on other sites

41 minutes ago, gismorail said:

Fantastic progress Andy. This ones squaring up for the fastest build mate !!!!

No not looking for the fastest build, but this is something totally different for me in the respect that there will be no back scene as such, no rolling hills, no mountains, no mountain streams, no Trees, bushes or hedgerows etc. just warehouses, and that will be something different as well for me.

 

Yesterday I laid just two tracks into the Fiddle Yard and wired them up for testing purposes, and so far this morning, I've made a start on the Bridge that will separate the Scenic side from the Fiddle Yard.

 

Hopefully some pics later.

  • Like 2
  • Friendly/supportive 1
Link to post
Share on other sites

  • RMweb Gold
5 hours ago, Andrew P said:

no Trees, bushes or hedgerows etc. just warehouses, and that will be something different as well for me.

 

Sounds a bit like Fiddlers Yard...

 

Looks good mate, keep it coming.

 

Al.

  • Thanks 1
Link to post
Share on other sites

1 hour ago, Alister_G said:

 

Sounds a bit like Fiddlers Yard...

 

Looks good mate, keep it coming.

 

Al.

Even the mighty Fiddler had some Trees along the back Al,  I'm going Commando this time.

782278922_Cloudsandstock015.JPG.3a000b63e3e01246218cfc8fb7c097be.JPG

 

1206449309_Securityfencefitted010.JPG.8e9963fa10ff5e985ebdc6e791466565.JPG

  • Like 8
Link to post
Share on other sites

20 minutes ago, Adrian Stevenson said:

Hi Andy, sadly another late night at work so I did not get home until 7.30pm, like tonight...

 

Glad you are making progress.

 

Cheers, Ade.

Early retirement mate, haha. :good: hope your progress is good on your project.

  • Like 2
  • Friendly/supportive 1
Link to post
Share on other sites

As I said earlier, a start has been made on the Bridge, but because of it's positioning and the need for a second entrance, a lot has had to be scratch built to fit the area, including the over hang of the control panel.

IMG_7121.JPG.18cfb744453b22d17810321703d706a6.JPG

 

IMG_7122.JPG.7f62dd155799bc11080740110ce91994.JPG

 

IMG_7123.JPG.18f3de9174e5ed607bbb685d740bd0cf.JPG

 

IMG_7124.JPG.20f266fb11fe16a896dd9c9b398055d7.JPG

 

IMG_7125.JPG.8141dd02d7c581ff190d717553a98c39.JPG

 

  • Like 12
  • Craftsmanship/clever 1
Link to post
Share on other sites

2 minutes ago, georgeT said:

l love the bridge Bodger, the best l have seen you make, well done...

Cheers mate, loads more Bodgery to do yet, and the Hot Glue Gun hasn't even been out to play Y E T.:D

  • Informative/Useful 1
  • Funny 3
Link to post
Share on other sites

Pics of the Bridge as promised, and the Backscene board. The Warehouse was built and supplied by George T of this Parish, and there are 2 more to go in later.

IMG_7126.JPG.f66f0b80d947523c287ff47fdee3cda5.JPG

 

IMG_7127.JPG.f63cbcc8754e8a6cca8078ec0069c489.JPG

 

IMG_7128.JPG.af0c3757ec8d3a9346a35fff27fb629e.JPG

 

IMG_7129.JPG.1d0f1c142f84cd8e1fae411e4e44c93f.JPG

 

IMG_7130.JPG.1c0c302e6494b35b514b5ec2ef14c172.JPG

 

Edited by Andrew P
add words
  • Like 15
Link to post
Share on other sites

  • RMweb Gold

Somewhere it was said that you had not had a layout without a painted backscene but, Just a thought, the initial Deesdale Road did not have a painted back scene.

Edited by PeterBB
Spelling correction
  • Agree 1
Link to post
Share on other sites

3 minutes ago, PeterBB said:

Somewhere it was said that you had not had a layout without a painted backscene but,Just a thought, the initial Deesdale Road did not have a painted back scene.

Indeed, your right Peter, I had forgotten about that.

 

NOT even a Backscene Board, just the Warehouses.

DSCF1001.jpg.9640ec9ab9a89791f806e37b72a683d4.jpg

 

DSCF1007.jpg.819f0ac7604f0e7c0243d1304e6d0764.jpg

 

Then I added this extension.

DSCF1011.jpg.eee0d9a2105b38d673684ee13beb7dac.jpg

 

Then above the Fuelling Point I added a Gaugemaster ''N'' Gauge Backscene and then painted some Trees to throw the Power Station further back.

DSCF1013.jpg.902c48fcdc1b564a02a00a34afbb18eb.jpg

  • Like 8
  • Agree 1
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • RMweb Gold

Hi Andy,

wow can you slow down a bit ... your making the rest of us look as if we are dithering and doddering and moving at snails pace ... what do you mean well we are!

 

New plan looks good, I am following along in the background - bit up and down at the moment ... but I am destroying a few trees drawing up plans and ideas. Might just adopt your approach and lay some track once of these days.  Now need to go update on your progress with SMS.

 

Rich

  • Thanks 1
  • Funny 1
Link to post
Share on other sites

9 hours ago, MarshLane said:

Hi Andy,

wow can you slow down a bit ... your making the rest of us look as if we are dithering and doddering and moving at snails pace ... what do you mean well we are!

 

New plan looks good, I am following along in the background - bit up and down at the moment ... but I am destroying a few trees drawing up plans and ideas. Might just adopt your approach and lay some track once of these days.  Now need to go update on your progress with SMS.

 

Rich

Not sure about slowing down, remember I am a Retired Old Git, so I have more Hours in the day than working folk, haha.

  • Agree 2
  • Funny 1
Link to post
Share on other sites

Finished fitting the Backscene boards this morning and added two more of the Warehouses that George T made a couple of years ago, my moto, don't throw anything away.

IMG_7131.JPG.737245aaa70a77a634c5db1ea673f396.JPG

 

IMG_7132.JPG.52eb05da6ae6a3cc9e1b2a70833397a3.JPG

 

IMG_7133.JPG.0f1aa75d25f136c88838a13dd5c3859a.JPG

 

IMG_7134.JPG.1eab81fc91a97823bd1414559e276240.JPG

 

 

 

  • Like 12
  • Agree 1
Link to post
Share on other sites

Progress on here will now grind to a virtual halt for a couple of days whilst I finish off the Platform area on Bala Town, I will do the initial Photo Shoot and see how they look.

Link to post
Share on other sites

2 hours ago, Andrew P said:

Progress on here will now grind to a virtual halt for a couple of days whilst I finish off the Platform area on Bala Town, I will do the initial Photo Shoot and see how they look.

You mean you're dropping back to the speed that the rest of us go!!

  • Funny 2
Link to post
Share on other sites

25 minutes ago, MartynJPearson said:

You mean you're dropping back to the speed that the rest of us go!!

Hi Martyn, I have slowed down, HONEST, but the good Lady doesn't agree, she stills say I rush around like a mad thing.

  • Agree 1
  • Funny 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...