Jump to content
 

Recommended Posts

4 hours ago, jcarta said:

Well we have reached the first milestone...yehaw.... All the boards  are now fitted and the felt has been fitted with a big thanks to my mucca Ray :drink_mini:

 

well here’s a few pictures from the build and I’ll take some more tomorrow when I’ll remove the protection from the boards

 

3309AAFC-DA97-4C8F-A632-D9C461C32A1D.jpeg.b44efa11bebf97476079a704e15210ed.jpeg

 

C037AB8B-8624-4EAA-93AD-9B0DECF52F29.jpeg.7a52b7d7d0e40718f8f4468b835de324.jpeg

 

Ray and I or some might say Lazy Joe and his apprentice....

 

69CB4387-8531-4C41-817F-BFDE02861A54.jpeg.6c2935cea98789e0648e12cead338960.jpeg
 

Ray couldn’t wait to get the first bit of track down on the branch.....

 

0AEA2213-EEE9-47E6-9796-F40671C30271.jpeg.b845a1843c0dd72f007cb26ab4976261.jpeg

 

Bless him

 

jim

It looks like Ray did all the work and you was sun bathing from the picture of you both great work Ray,it will be interesting to see the first train up the branch.

  • Funny 3
Link to post
Share on other sites

  • RMweb Gold
12 minutes ago, spenc said:

It looks like Ray did all the work and you was sun bathing from the picture of you both great work Ray,it will be interesting to see the first train up the branch.

 

mmmm We all need to have a manager on site ...... It's not my fault that the sun follows me around.... is it? :smoke:

 

Anyway ....you will usually find him under the boards at our club

  • Like 2
Link to post
Share on other sites

  • RMweb Premium
11 hours ago, spenc said:

It looks like Ray did all the work and you was sun bathing from the picture of you both great work Ray,

 

I thought similar but decided that in the interest of (my) safety I wouldn't say anything! Jim did drill all the holes for me to put the screws in.  :jester:

 

My understanding is that as of last evening all the boards are now felted which was probably just as well seeing as the heaven's opened overnight.

Edited by Ray H
  • Like 2
  • Funny 1
Link to post
Share on other sites

2 minutes ago, Ray H said:

 

I thought similar but decided that in the interest of (my) safety I wouldn't say anything!

 

My understanding is that as of last evening all the boards are now felted which was probably just as well seeing as the heaven's opened overnight.

Wise move not to say anything, that was lucky to have the boards felted heaven's opened down here no on the beach today.

20170409_100158.jpg

  • Agree 1
Link to post
Share on other sites

  • RMweb Gold

Well this morning was the start of the next milestone and by that, we looked at the track layout starting with Ayr Road Sidings. Not a lot will change for this area with the exception of an additional siding & loop line. We will also install several braking sections around the layout to assist the signallers if they are shunting trains. We have had a long chat about Knowmoor track layout and some alterations will be made from the original plan but more about that area later.

 

Next up is a rough idea where the point work will be situated on Ayr Road Sidings

 

 

 

1698035829_AyrRoadVol02(52).JPG.2807c7f87f305fbaf3f8f39e668ccefc.JPG

 

 

And finally Ray done a full size plan of the new layout at Knowmoor a few weeks ago so it was time to unravel it and see how it fits into the area. As I said there will be some minor adjustments made to the layout but all in all it fits, so in the next few days, weather permitting, we will start on permanent way.

 

488924573_AyrRoadVol02(53).JPG.667352610d659f32329b2f484ef83dc7.JPG

 

1984696591_AyrRoadVol02(54).JPG.8e5655e961d2971240fba8ed8dd4b0b5.JPG

 

1229016756_AyrRoadVol02(55).JPG.7e1465507b9e7d4831e026b7534cceea.JPG

 

 

 

 

 

Jim

 

 

 

Edited by jcarta
  • Like 6
  • Craftsmanship/clever 1
Link to post
Share on other sites

16 minutes ago, jcarta said:

Well this morning was the start of the next milestone and by that, we looked at the track layout starting with Ayr Road Sidings. Not a lot will change for this area with the exception of an additional siding & loop line. We will also install several braking sections around the layout to assist the signallers if they are shunting trains. We have had a long chat about Knowmoor track layout and some alterations will be made from the original plan but more about that area later.

 

So first up is a photo of the last boards that were felted yesterday

 

IMG_6230.JPG.c3d54dbe6c694d7c0fc2b01c352e2322.JPG

 

Next up is a rough idea where the point work will be situated on Ayr Road Sidings

 

IMG_6236.JPG.6a28e81e419eaa0f1472ee60404c8cae.JPG

 

IMG_6235.JPG.a83bb6f46281b140032d023ffd51dcb7.JPG

 

And finally Ray done a full size plan of the new layout at Knowmoor a few weeks ago so it was time to unravel it and see how it fits into the area. As I said there will be some minor adjustments made to the layout but all in all it fits, so in the next few days, weather permitting, we will start on permanent way.

 

IMG_6234.JPG.5ba74c69ac6d43bc4abb6f8b3b448b2b.JPG

 

 

IMG_6232.JPG.6380a019c47045fbd84a60054d89f0dd.JPG

 

Jim

 

 

 

WOW Jim, now so envious of your Garden mate, superb planning as well, so well done young Ray.

  • Thanks 1
Link to post
Share on other sites

  • RMweb Gold
8 minutes ago, Andrew P said:

WOW Jim, now so envious of your Garden mate, superb planning as well, so well done young Ray.

 

Thanks Andy and of course a big big thanks to Ray for his time, commitment and friendship in assisting with the layout, track building etc.....:dance_mini:

  • Like 1
Link to post
Share on other sites

  • RMweb Premium

Thanks for the nice comments chaps, appreciated.

 

One thought that I've had since I left you this morning Jim was to change the (Sidings) down loop into an up loop instead. It might be possible to get two trains in it!

  • Like 1
  • Informative/Useful 1
Link to post
Share on other sites

  • RMweb Gold
3 hours ago, Ray H said:

Thanks for the nice comments chaps, appreciated.

 

One thought that I've had since I left you this morning Jim was to change the (Sidings) down loop into an up loop instead. It might be possible to get two trains in it!

 

Now that's a good idea, when we catch up I would like to see how this fits in.

  • Like 1
Link to post
Share on other sites

  • RMweb Gold

Yesterday was a day off from the railway so it was spent clearing up the garden, in reality it was a good call considering it has been pretty full on for a few weeks.

Not only did I spend the day clearing up I also refreshed the patio furniture with a good clean and a respray ......

 

Anyway I was still clearing up the garden today when my sidekick texted me to ask about laying some track this afternoon..... well I jumped at the chance and nearly decided to throw all the rubbish into next doors garden but then thought the better of it..... ;)

 

So a few pictures from today, this is the sidings that are situated just as the line leaves the garage, this area will alter slightly but not by too much.

 

739613893_AyrRoadVol02(59).jpg.ad5b709a6e4111a9498701ce9bf9ca2d.jpg

 

858286139_AyrRoadVol02(60).JPG.99d3e0b9f497fa37108a66a14274df4e.JPG1469745028_AyrRoadVol02(61).jpg.ceb2b73dd99fe930bcbb9182e20e0646.jpg

 

The last photo depicts that there is a dip at the points but this is just an optical illusion......

 

Jim

Edited by jcarta
  • Like 4
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • RMweb Gold

So today after finishing work the afternoon was gladly spent in the garden continuing where we left off yesterday. I spent time soldering my fingers together putting on the omega loops and then continued laying the track in the sidings in readiness to continue laying the main sometime this week.

 

IMG_6245.jpg.89ed7e2a6509d309a9ba4a46a86e3589.jpg

 

IMG_6249.jpg.e8aee9993c76119d0d9ded5cb84c29cb.jpg

 

IMG_6248.jpg.23b66a7f85030d26d02ab51e7104a127.jpg

 

Jim

 

  • Like 8
Link to post
Share on other sites

  • RMweb Gold

Today’s offering was to continue with the loops and sidings at Ayr Road so I left my sidekick to cut and place the rails whilst I started on the curves. So here are a few pictures of our progress..... you will note that the permanent way hasn’t finished building the single slip at the south end but hopefully by Sunday/ Monday this will be installed.....

 

1967204055_AyrRoadVol02(66).JPG.e313bd6aaceac1da88e60b090938ca10.JPG

 

1787639985_AyrRoadVol02(68).jpg.a577e4a2f42cbcd8bc8f4553cb5d693e.jpg

 

1162179302_AyrRoadVol02(70).JPG.a70d7a7818b6372e39b27414fb8094ca.JPG

 

1174871810_AyrRoadVol02(72).JPG.83949aaac3a4e0a1e4acf1b618a1415a.JPG

 

924724043_AyrRoadVol02(69).JPG.01bb375ecef27feb417d6495aabd5862.JPG

 

 

 

 

 

 

 

 

 

 

The last picture will be the start of a new station being installed, local services only....

Edited by jcarta
  • Like 8
  • Round of applause 1
Link to post
Share on other sites

  • RMweb Premium

Lest anyone should take the pictures too literally and think Jim's lost the plot, here's the single slip that'll replace the piece of corrugated cardboard in some of the above images.

 

270720_3.jpg.3a23ba486f608eb4f462f76e3ded2e37.jpg

 

Weather permitting it'll be with Jim later today for painting with the (weather permitting) intention of adding it to the layout tomorrow.

Edited by Ray H
  • Craftsmanship/clever 3
  • Round of applause 1
Link to post
Share on other sites

  • RMweb Gold

Seeing as the weather was a washout yesterday I was sent out by SWMBO to tidy up my garage, cheek of it......:nono:

 

Well today was a better day so I spent most of the morning soldering omega clips to the rail joints and I can now confirm that this job has been finalised but only for this area :aggressive_mini:

 

Ray spent the morning fitting the new single slip that he had built, what a fine job he has done (only one more to go matey) then we ran a few trains to see if there are any areas that need rectifying before moving on and I am pleased to report that the loco's and stock ran fine. so here are a few pictures from todays effort.

 

IMG_6281.JPG.f25b68cf0d683fb5f8ce7e005155ed78.JPG

 

IMG_6283.JPG.6122b299a328b6524f8b13ab96ac01e2.JPG

 

IMG_6276.jpg.e6d5885f32853c3c0552253aa09aa363.jpg

 

 

Edited by jcarta
  • Like 8
Link to post
Share on other sites

  • RMweb Gold

Well today we were up and running to see what our next stage of what we need to do, so after a cuppa and a very long chat about the boxes that will be installed on the front of the layout and how we are going to install the gizmos inside them, So we had another drink and a chat, thirsty work this thinking you know ...... :drink_mini:

 

Well anyway Ray brought a small container around with him, frog juicers, oh they look nice, what do they do? then Ray explained what they do and why I need them, lesson over and time for another drink and a snack....... Here is Ray's box of mad frogs.

 

IMG_6285.JPG.6469c1c232c0a007efea8e1b2f2f8c39.JPG

 

Looks nice.......

 

So I left Ray to play with them whilst I got to work making a platform for them to sit on. Off came the signal box so these little beauties can be fitted underneath away from the elements of the great British weather.

 

IMG_6286.JPG.7315528e278778df4f099ba5f7d3ff13.JPG

 

Nice platform.......

 

IMG_6289.JPG.1ed4519f28523ca3f5aaa52de6870796.JPG

 

Look at these beauties all lined up and wired up...... Also Ray spent time stapling the wire along side the track so any issues we do not have to spend time under the board looking to rectify any issues if and when they arise.

 

IMG_6298.JPG.913ca9f2da5b4ec53504c542de47018d.JPG

 

Lastly a quick tidy up of our handy work and then a refit of the signal box ..... you would never know we were here ......

 

IMG_6297.JPG.afc32396fcc55b17e0c37b473ab093bd.JPG

 

Jim

 

 

 

 

 

 

Edited by jcarta
  • Like 4
  • Craftsmanship/clever 1
Link to post
Share on other sites

  • RMweb Gold

Well this afternoon something a little bit different.......

 

I ordered up loadsa bits from Toolstation, I am now on first name terms with the staff seeing as I am there more times than they are. So the first bits ordered is the trunking for the wiring. The wiring will be installed within the trunking on the front of the boards, more of this later.

 

 IMG_6299.JPG.f5f73900d474d3c74f1aff7f538fbd23.JPG

 

I think I may have gone over the top on the tubing........

 

Anyway Ray spotted this on the O Gauge guild on Sunday, it had been on there since March this year and I was surprised it was still available...... A Skytrex Class 31, a good runner with a large can motor installed...... Now this is the best bit ....... £125.

 

IMG_6296.JPG.ecc01ce1e3748d73c68ad3afd30f72b0.JPG

 

Apart from the paint work, although decent, I thought I would give it a strip down and a paint remover bath in readiness to update it and give it a shiny new coat of paint. As it is a skinhead and I am going to keep it as 31418, I will install lights and replace the lower discs. On stripping down all was not well as the window pillars were old and needed replacing so out with the plastic card to start on some new pillars that will require filing down to fit.

 

IMG_6290.JPG.1927b63019c67c141bda2a5ff2c0d4cf.JPG

 

Ray has the bogies at present and is rewiring them so they will pick up on both bogies, so hopefully in a few weeks this will be a nice addition to the fleet.

 

Jim

Edited by jcarta
  • Like 5
Link to post
Share on other sites

  • RMweb Premium
8 hours ago, 56038 said:

The amount of work you guys get through is astonishing! Great read, really enjoying it - looking forward to the next instalments.

 

What's this plural lark. There's only one of me!  :jester:

Edited by Ray H
  • Round of applause 1
  • Funny 2
Link to post
Share on other sites

  • RMweb Gold

I was actually going to say the same and then like you .... there's only one of me as well....

 

Ray..... What are they on about?????????? LOL

 

That reminds me... You need to put you annual leave request in tomorrow...

  • Funny 1
Link to post
Share on other sites

  • RMweb Gold

What a stunning day.... :sungum::sungum:

 

Today was a fruitful day with Ray taking out what he put in yesterday as we both looked at one another and said...." I'm sure that's where the servos's are suppose to be.... PMSL

 

Anyway, Ray took everything out and placed the servo's in situ...... Tomorrow we will build a second floor within the confines of the signal box to house the frog juicers. Are you listening????

 

So lets have a look at today's exploits

 

IMG_6303.JPG.77e881f20e8275ecef882fcaa515ce70.JPG

 

They look the bee's Knee's.... Do they work? ..... lndeed yes

 

Anyway look at what the maestro has done now..... all the point cabling has been placed inside the trunking......genius.

 

Right, down to my exploits at the other end of the railway, we do social distance you know :protest:

 

IMG_6304.JPG.fce177bc55dce878e58cf5f3c9b0e3a7.JPG

 

Me on the other hand, I have been putting in a station for the local services

 

This is currently how it looks

 

IMG_6302.JPG.4fd44e62154f398642a4af16a5649631.JPG

 

 

 

Jim

Edited by jcarta
  • Like 3
  • Craftsmanship/clever 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...