Jump to content
 

Helenburgh & Ruthin (Garden Project)


georgeT
 Share

Recommended Posts

Thanks Mark, It did all look very good yesterday mate, and also please thank the lovely Helen for the excellent coffee, it was far better than George ever makes, although I must say that Cath's cake was something special. Back on a diet now after the Wetherspoons breakfast (George's treat), and cake yesterday, still it was worth the trip up.

  • Thanks 1
Link to post
Share on other sites

Hi Andy - Helen was suitably flattered by your comments about the coffee! I’ve not had a chance to taste Cath’s cake yet but her Sunday lunches are great!

Made astonishing progress down the garden this week - could even reach the shed next week - right George? Bring it on I say!

  • Like 2
Link to post
Share on other sites

  • 1 year later...

lt's been a while since an up-date on the H&R garden railway, so much has happened since Andy came up and painted the back-scene, we now have a working station with a goods shed, and a bridge over the rails leading to the engine shed, will post more later...

IMG_9574.JPG

DSC06887.JPG

IMG_9576.JPG

IMG_9572.JPG

IMG_9569.JPG

  • Like 9
Link to post
Share on other sites

A few more pictures on the H&R, showing the dairy's loading dock, also some industrial building's baring the names of some members, then we come to the bridge with a 150th scale double decker (with internal lighting and tail light's glowing) all in all it has been good fun helping Mark out with jobs that need to be done also lot's of help from lan Hallworth, in the last picture we have two locos running light engine to Ruthin.

IMG_9579.JPG

IMG_9568.JPG

DSC07343.JPG

DSC07340.JPG

  • Like 7
Link to post
Share on other sites

The signal box at Helenburgh, followed bt Mark and lan enjoying running in the cold weather, and Mark at Ruthin in warmer weather, and a couple of shots of the foot bridge built from a kit by Mark, and finally my Class 37 in distribution have a run out....

IMG_9573.JPG

DSC07176.JPG

IMG_9583.JPG

IMG_9590.JPG

IMG_9587.JPG

DSC07174.JPG

DSC07168.JPG

  • Like 6
Link to post
Share on other sites

  • 1 month later...

Been really busy at Marks in all the extreme heat making two tracks into four, all we have to do now is rearrange the point work at Ruthin, also lan Hallworth installed close circuit TV so we can view the layout from Helenburgh without ever moving.

DSC07471.JPG

DSC07474.JPG

DSC07479.JPG

DSC07478.JPG

IMG_9552.JPG

IMG_9554.JPG

DSC07493.JPG

  • Like 7
Link to post
Share on other sites

8 minutes ago, georgeT said:

Been really busy at Marks in all the extreme heat making two tracks into four, all we have to do now is rearrange the point work at Ruthin, also lan Hallworth installed close circuit TV so we can view the layout from Helenburgh without ever moving.

DSC07471.JPG

DSC07474.JPG

DSC07479.JPG

DSC07478.JPG

IMG_9552.JPG

IMG_9554.JPG

DSC07493.JPG

Looks good, very useful CCTV as well.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...