enginelane Posted May 3, 2020 Author Share Posted May 3, 2020 CHIRM is officially a roundy roundy as trains have run all the way around. Do not know why but the last two wire in tube installations a real pain so stopped today to give it a rest and have another go tomorrow. Link to post Share on other sites More sharing options...
RMweb Premium skipepsi Posted May 4, 2020 RMweb Premium Share Posted May 4, 2020 I am hoping this means your health has improved? Link to post Share on other sites More sharing options...
enginelane Posted May 4, 2020 Author Share Posted May 4, 2020 Since tablets were adjusted then heart rate has been more in control. Doing more steps and lost some weight and was due to see consultant 26 th May which given circumstances now cancelled. No caffeine or alcohol since August. Being very careful and not been out since before lockdown. The use of the screw connector Mini boards have really helped by reducing soldering especially under the baseboards so fumes not activated asthma. 3 Link to post Share on other sites More sharing options...
enginelane Posted May 5, 2020 Author Share Posted May 5, 2020 Tidy up day and test session. Apart from strong smell of burning when an off cut of wire from the wire in tube found its way across a switch then all lines worked! More stock out and run trains both ways just to show off! Such simple pleasures. Post woman stopped by observing social distancing of course and found out she is in St Johns Ambulance so looking for discount of their services at next Wakefield exhibition whenever that is! Link to post Share on other sites More sharing options...
enginelane Posted May 9, 2020 Author Share Posted May 9, 2020 Hot day so cool of the garage welcome for a hour this afternoon. Started to map out the main buildings. Lumber yard will take 2 40 ft cars. Majority of the stock yard will be off layout but access roads will show where it is sited. Found lurking in the spares box what must be an overhead crane of some type and will have a go at using to unload raw and finished stone in the Stone yard. Stone masons cutting shed will probably end up being half relief. Need to source some limestone so can cut up into some blocks. Think still have the tile saw somewhere that could use used to saw it down. 5 Link to post Share on other sites More sharing options...
enginelane Posted May 11, 2020 Author Share Posted May 11, 2020 Slightly warmer day in the garage so did a little more scenery with the little of what is left scenic products whilst a RS 2 on a freight lapped quietly around the track. rock strata formed from torn edge cork tiles 1 Link to post Share on other sites More sharing options...
enginelane Posted May 12, 2020 Author Share Posted May 12, 2020 Bit of a nothing day today not helped by bunged up nose and head cold. Used up the last of the burnt grass to create a base layer and glued up more torn cork strips to create rock faces for timber over bridge which creates the scene break at the garage door end. used up the remaining ballast on the timber spur. 5 Link to post Share on other sites More sharing options...
enginelane Posted May 13, 2020 Author Share Posted May 13, 2020 Another cold morning in the garage. When the is north or eastly it is artic in there. Mocked up the levels of the wooden over bridge and glued up more cork strips. in the stone yard made a foam board template to rough out the dimensions of the Stone cutting shed. Looking on www.monon.org a couple of sheds look possible candidates to act as suggestions for the CHIRM shed. 1 Link to post Share on other sites More sharing options...
enginelane Posted May 14, 2020 Author Share Posted May 14, 2020 Mocked up the stone cutting shed. If looking down the layout will create a visual block of the top left curve 2 Link to post Share on other sites More sharing options...
enginelane Posted May 15, 2020 Author Share Posted May 15, 2020 A day of not a lot to show for it but using up last of the ballast to create the roadways in the lumber yard- there is enough to complete it to the yard office. Base coated the rock strata. 1 Link to post Share on other sites More sharing options...
enginelane Posted May 16, 2020 Author Share Posted May 16, 2020 Morning spent getting the rock levels more or less sorted. Need to find the end pieces of the bridge. 3 Link to post Share on other sites More sharing options...
TT-Pete Posted May 16, 2020 Share Posted May 16, 2020 I like what you are doing with the cork strips for the rockfaces, will be very interested in seeing how it ends up looking. Keep up the good work! :^) 1 Link to post Share on other sites More sharing options...
enginelane Posted May 17, 2020 Author Share Posted May 17, 2020 Mostly a garden day today but did mock up possible locations of next bits of Chirm. Using two ex Vimes a Street buildings. Stone Tools, very apt name one block down from the stone yard and the Yard Cafe which backs onto the switching spurs. In the space between the spurs will have some MOW, yard hut structures again ex Vimes Street. looking further up the layout position of CHIRM Depot and the loco stabling spur. 3 Link to post Share on other sites More sharing options...
enginelane Posted May 18, 2020 Author Share Posted May 18, 2020 Not as warm as weather forecast predicted but did spend time in garden cutting out windows and adding the corrugated sheeting to the carcass. Link to post Share on other sites More sharing options...
enginelane Posted May 20, 2020 Author Share Posted May 20, 2020 Not the best day in the heat to be cutting mam’s lawns but needs must. Cooled down sat under the umbrella and added some bits to make the overhead stone yard crane. Still need to add motors and job mechanism. 1 Link to post Share on other sites More sharing options...
enginelane Posted May 21, 2020 Author Share Posted May 21, 2020 Parcel today of some bits but ballast supplies not part of it so spent time creating landform base next to the timber bridge with the cardboard packaging. modified the BR Freightliner fork lift by removing back cab and modifying rear mud guard. 2 Link to post Share on other sites More sharing options...
enginelane Posted May 24, 2020 Author Share Posted May 24, 2020 5A strange day having to keep away from news feeds etc and D Cummings story. The man believes he is above every body else and as such nothing applies to him. Unaccountable unelectable and as such untouchable. So lots of time sitting quietly reading and just a couple of hours in the garage today. worked on the stone building putting front sides and back together. forgot when making the back piece that the angle with a curved roof would create a variable height back plate. Leave for another day how to sort it out! little project completed, the depot name signs 1 1 1 Link to post Share on other sites More sharing options...
enginelane Posted May 24, 2020 Author Share Posted May 24, 2020 1 Link to post Share on other sites More sharing options...
enginelane Posted May 27, 2020 Author Share Posted May 27, 2020 Completed putting in the cardboard formers to create the land around the timber bridge ready for plaster bandage to be applied. 2 Link to post Share on other sites More sharing options...
enginelane Posted May 31, 2020 Author Share Posted May 31, 2020 Very hot days when paint glue etc seems to dry before it leaves the brush. Plaster bandage to form the shell of the landform. Remembered I had what seems to be a carpet tile of Vegetation somewhere in a stash that was bought from a secondhand stall years ago. Will use and add a few beef cattle grazing on what will be poor pasture land. 2 Link to post Share on other sites More sharing options...
enginelane Posted June 1, 2020 Author Share Posted June 1, 2020 Slowly getting there 3 Link to post Share on other sites More sharing options...
enginelane Posted June 10, 2020 Author Share Posted June 10, 2020 Slowly getting there, ballast and ground cover somewhere in the post 1 Link to post Share on other sites More sharing options...
enginelane Posted June 10, 2020 Author Share Posted June 10, 2020 Lumber yard more or less finished except for detailing, weathering etc. 3 Link to post Share on other sites More sharing options...
enginelane Posted June 13, 2020 Author Share Posted June 13, 2020 Horrible cold and drenching rain day yesterday has given way to sun and bits of blue sky. Modelling session spent cleaning up again but next layer of ground cover vegetation added to the timber bridge. Left hand side will face modelling North so hoping to represent this in vegetation cover. 2 Link to post Share on other sites More sharing options...
enginelane Posted June 13, 2020 Author Share Posted June 13, 2020 3 Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now