Welsh Signaller Posted November 9, 2019 Author Share Posted November 9, 2019 (edited) A few little snaps for fun. Edited January 19, 2021 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 9, 2019 Author Share Posted November 9, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 10, 2019 Author Share Posted November 10, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 14, 2019 Author Share Posted November 14, 2019 (edited) Ragstone metal Great Western buffer stop assembly, I’ve two to build for the siding and headhunt. Ive also got a ground based water crane to build. Edited January 19, 2021 by Welsh Signaller 1 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 15, 2019 Author Share Posted November 15, 2019 (edited) Ragstone Models white metal Great Western Buffer Stop. Stage eight, buffer stop assembly was left to dry overnight - I’ve given it a coat of primer, again leave to dry. Edited January 19, 2021 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 15, 2019 Author Share Posted November 15, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 15, 2019 Author Share Posted November 15, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 3 Link to post Share on other sites More sharing options...
380John Posted November 15, 2019 Share Posted November 15, 2019 Looking fantastic. Surprisingly atmospheric considering you haven't started any scenics. Will be following mate Cheers John. 1 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 24, 2019 Author Share Posted November 24, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 27, 2019 Author Share Posted November 27, 2019 Concept drawing of how I plan the dismantled Waterloo Branch river crossing to be. The bridge in a state of demolish, with one side complete with deck and the other hair side plates remaining - with the tunnel beyond. Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 27, 2019 Author Share Posted November 27, 2019 Bridge side plates primed, and the raw corner ready to go. 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 29, 2019 Author Share Posted November 29, 2019 Work continues on the “Bridge over the River Wye” Drilling of holes in the bridge side plates to allow supports for the handrails to attach to. 1 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 29, 2019 Author Share Posted November 29, 2019 (edited) “Bridge over the River Wye” update: Handrail supports secured into the side plate, primed and ready to paint at some point. I’m going to construct a brass central support which will sit in the river which will have one of the remaining spans sat on top. Edited November 29, 2019 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 29, 2019 Author Share Posted November 29, 2019 Bridge over the River Wye Step by Step Pictorial: (1) Drill out the handrail holes in the supports. (2) Trim excess from the bottom of the supports. (3) Attach, and secure the uprights into the side plates. (4) Run some spare wire through the supports to open up the holes. Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 29, 2019 Author Share Posted November 29, 2019 Bridge over the River Wye Pictorial update: (1) Prime the side plates ready for weathering. (2) Bake dry. Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 29, 2019 Author Share Posted November 29, 2019 Bridge over the River Wye Pictorial update: Primed and ready for painting, and weathering - I just need to add wire to the handrails. Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 29, 2019 Author Share Posted November 29, 2019 (edited) deleted Edited January 19, 2021 by Welsh Signaller 5 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 29, 2019 Author Share Posted November 29, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 1 Link to post Share on other sites More sharing options...
Welsh Signaller Posted November 29, 2019 Author Share Posted November 29, 2019 (edited) Bridge over the River Wye Update: Initial coat of paint on the bridge side plates. Edited January 19, 2021 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted December 1, 2019 Author Share Posted December 1, 2019 (edited) 9672 the latest arrival to motive power department. Edited December 1, 2019 by Welsh Signaller 5 Link to post Share on other sites More sharing options...
Welsh Signaller Posted December 15, 2019 Author Share Posted December 15, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted December 20, 2019 Author Share Posted December 20, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 4 Link to post Share on other sites More sharing options...
Welsh Signaller Posted December 21, 2019 Author Share Posted December 21, 2019 I’ve had a good at dry brush painting some work stain onto a Dapol Class 08. 08630 in a few months off E Exam at Ferrybridge condition, considering it’s my first attempt at serious weathering I’m pretty happy. 2 Link to post Share on other sites More sharing options...
Welsh Signaller Posted December 22, 2019 Author Share Posted December 22, 2019 (edited) Deleted Edited January 19, 2021 by Welsh Signaller 1 Link to post Share on other sites More sharing options...
Welsh Signaller Posted December 23, 2019 Author Share Posted December 23, 2019 (edited) The second EWS Class 08 I’ve completed, again in very light work staining a few weeks off E Exam. Edited December 23, 2019 by Welsh Signaller Link to post Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now