Jump to content
 

Wye Valley Dismantling a Railway mid 1960s


Welsh Signaller
 Share

Recommended Posts

  • 2 weeks later...

Final rest day before I go back on shift today so a effort was made to crack on with as much as I could, not a bad enough was done with the station area trackbed assembled, and a start made on figuring out how to increase the height of the back scene and create a fish bowl type view.

 

 

 

 

 

 

 

 

Edited by Welsh Signaller
  • Like 1
Link to post
Share on other sites

My list of to do jobs on the layout today consisted of:

 

Backscene boards to be cut to width, and length.

 

Cut to width, and length the the raised track bed for the scenic side of the frame work, the other side is being used as a work bench / tool storage area.

 

 

 

 

 

 

 

 

Edited by Welsh Signaller
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...