Jump to content
 

PTA/JTA/JUA, By Accurascale (NOW WITH ADDED BSC INNERS!)


Recommended Posts

  • RMweb Gold

I seem to remember that the rotary coupler end was painted red or orange to indicate to staff to couple the train correctly.

Link to post
Share on other sites

On ‎26‎/‎06‎/‎2019 at 12:48, hmrspaul said:

 

PTA/JTA+JUA Bogie Tippler Pack - VTG Grey ACC2114VTG

I haven’t recorded these.

 

 

 

Mostly VTG Grey, and from when they returned from overhaul and painting into VTG Grey. Some later in service shots giving an idea as to how the Gloss livery Matted down as well ...

 

Bogie Wagons, JUA  VTG Tipplers

HTH

 

MC

 

Edited by meld
  • Like 1
Link to post
Share on other sites

27 minutes ago, bazjones1711 said:

20190701_211148.jpg

 

So when unloading, what happened to the air pipes to stop them getting twisted  - I am expecting they didn't do a full 360, and that the pipes long enough to allow say a 180 degree turn and then back again. 

 

Not expecting the models to allow this feature! (Although thinking about it, technically with the correct arrangement within the coupling design, it probably would be viable to engineer a relatively simple and robust mechanism, to permit it on at least the inner wagons, especially if the wagons were pretty heavy).

 

Regards,

 

C. 

 

Link to post
Share on other sites

That's pretty cool.

 

But tbh I wouldn't ever use a rotating coupling and will be very happy with "just" prototype height couplers on the inners :)

 

Somewhere to fit a body mounted kadee on the outers and I'm even happier ;)

 

Looks a great project!!

 

Will

Link to post
Share on other sites

ok, I'll as the stupid question ... why did these wagons have rotary couplers anyway if each wagon was unloaded individually like in the picture above? Or was the unloading at Llanwern different to other sites like Ravenscraig?

 

Would it not have been quite a lengthy process uncoupling each, moving it along, unloading, moving on to the next wagon for the 20-30 wagon rakes?

Link to post
Share on other sites

2 minutes ago, GordonC said:

 

 

Would it not have been quite a lengthy process uncoupling each, moving it along, unloading, moving on to the next wagon for the 20-30 wagon rakes?

 

Not sure how they did it elsewhere but, at the unloading facility at Consett steelworks, the wagons remained coupled while being tipped...

 

John

 

Link to post
Share on other sites

40 minutes ago, GordonC said:

ok, I'll as the stupid question ... why did these wagons have rotary couplers anyway if each wagon was unloaded individually like in the picture above? Or was the unloading at Llanwern different to other sites like Ravenscraig?

 

Would it not have been quite a lengthy process uncoupling each, moving it along, unloading, moving on to the next wagon for the 20-30 wagon rakes?

That is simply done for the photograph (it would be a crap photo with all the other wagons in the way), in normal practice the wagons remained coupled during the unloading process.

  • Agree 1
  • Thanks 2
Link to post
Share on other sites

I recall when the South Wales ore came off at Cardiff, the other rake was stabled in my old mans yard (East Usk) for a few days, he managed to collect a sample of ore from the wagons, I remember the pelts being small balls brown in colour.

 

The wagons seemed only half loaded as I understand it’s very heavy stuff.

 

Anyone recall how much they weighted loaded roughly, 2000t ish if not more ?

Edited by Welsh Signaller
Link to post
Share on other sites

  • RMweb Gold

I read somewhere that they were only 25% full due to the weight but looking at photos it does seems to be closer to 50%.

 

Just to clarify I was referring to the Llanwern Port Talbot when I mentioned looking at photos. It makes sense now that I think of it. that ore density, as mentioned in subsequent posts below, will vary.

Edited by BR Blue
Clarification
Link to post
Share on other sites

Just now, BR Blue said:

I read somewhere that they were only 25% full due to the weight but looking at photos it does seems to be closer to 50%.

It varied according to the density of the ore; the contrast between these wagons, and those used to carry domestically-quarried ore from the East Midlands to Corby is remarkable; the latter heaped well above the top of the sides. Have a look at David F' s photos on here:- https://www.flickr.com/photos/davidwf2009/sets/72157626169910951/

I saw a photo (I think it was in the first volume of 'The 4mm Wagon') taken from a high view-point, of wagons being loaded with imported ore at Immingham during the 1950s. The wagons are a real mixture of purpose-built ones, and 'ordinary' 12/16t minerals. The non-specialist wagons looked as though someone hadn't cleaned the old load out, there was so little (in terms of volume) of the high-density ore in them.

  • Thanks 1
Link to post
Share on other sites

  • RMweb Gold
12 hours ago, Welsh Signaller said:

I recall when the South Wales ore came off at Cardiff, the other rake was stabled in my old mans yard (East Usk) for a few days, he managed to collect a sample of ore from the wagons, I remember the pelts being small balls brown in colour.

 

The wagons seemed only half loaded as I understand it’s very heavy stuff.

 

Anyone recall how much they weighted loaded roughly, 2000t ish if not more ?

I thought the 30 wagon Llanwern trains were approx. 3000 tons (100 tons per loaded wagon)?

Link to post
Share on other sites

14 hours ago, GordonC said:

ok, I'll as the stupid question ... why did these wagons have rotary couplers anyway if each wagon was unloaded individually like in the picture above? Or was the unloading at Llanwern different to other sites like Ravenscraig?

 

Would it not have been quite a lengthy process uncoupling each, moving it along, unloading, moving on to the next wagon for the 20-30 wagon rakes?

 

Its either a posed photo or its the last wagon of the rake as it has buffers. Same as MGR coal train unloading except the train would stop to allow the wagon to be rotated,and pull forward for the next one until all wagons were emptied. The rotating couplings allowed quick unloading onto a massive conveyor belt

  • Thanks 1
Link to post
Share on other sites

Hi Fran,

 

Super news on the PTA and I echo the comments on here about the black and orange inner rakes. I think they are a must to model the Ravenscraig circuit which as per the videos shared was a 20 or 21 rake (with only 1 grey outer, 1 grey and orange outer and the rest inners).

 

It's an iconic train and as you guys are filling a massive gap in the market with producing a great prototype wagon the I think you will find the demand is generally to make the prototype rake. 

I would certainly snap your hand off for 3 additional inner packs if they were on the table.

 

Thanks,

Rich.  

  • Agree 4
  • Thanks 1
Link to post
Share on other sites

1 hour ago, ERIC ALLTORQUE said:

Being a Consett lad the issue of how the waggons were filled is as to where the ore came from as the density of it is different.As a kid i remember some were full and others were no where near full but just as heavy.My brother was on the ore carrying ships and some were brim full to the top and other times the ship was at her draft and the hold looked empty.

 

Ore ships (if not all ships) work to the "Plimsoll Line" regarding max loading which can be effected by the time of years and sea water temp (useless fact of the day)

Link to post
Share on other sites

3 hours ago, 25901 said:

 

Ore ships (if not all ships) work to the "Plimsoll Line" regarding max loading which can be effected by the time of years and sea water temp (useless fact of the day)

and not forgetting the salt water density.

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...