Having completed Skipton 2 years ago, and taken it to 7 exhibitions in that time, I decided it was finally time to start a new layout. From my experience with Skipton I had a few primary conditions that the new layout needed to have.

1: Through-running capabilities to enable running locos in.

2: Peco Code 75 trackwork, as the box sleepers on the Code 83 that I used on Skipton don't look right for Victorian track.

3: A large fiddle yard with at least 10 tracks. This is as on Skipton prior to the fiddle yard rebuild I often had trains sitting on the baseboard due to not having enough track.

4: A working turntable, with a preference for a Peco one, which scales out at 86' in HO. 

5: A maximum size of 7.15 x 4.8 metres (approximately 24x16') , due to the size of my shed. 

6: A minimum radius of 91.4cm (3'), to enable the running of my brass stock.

 

In addition to this, I have recently begun an interest in South Australian locomotives and rolling stock, having collected 3 locomotives and 11 wagons to date. Therefore, for prototype (or basis thereof), it had to meet the following conditions:

1: A border-station, to enable the operation of both VR and SAR stock.

2: A large locomotive depot, as through-running of locos (except for the occasional transfer) wasn't implemented until almost 20 years after my modelling period.

3: A decent size yard, minimum of 5 roads including platform. 

4: A long platform - the Overland, the passenger service between Melbourne, the capital of Victoria, ,and Adelaide, the capital of South Australia, was often around 8-10 cars long in the 1950s and 60s. At 26.5cm for a 75' passenger car in HO this meant a minimum length of 2.12m, and ideally around 2.7m. 

5: Significant goods facilities to enable the transhipment of goods where necessary (through-running of wagons was permitted, but was rather rare). Namely at minimum a 75' goods shed, 50' goods platform, stock races for both cattle and sheep, and wheat facilities (if located near Serviceton or Pinnaroo, the two real-life border stations to the north of the state. There was another one to the south on the South Australian side at Mount Gambier, but it was much more of a branchline.)  

 

A number of plans were sketched out, with one drawn up in Anyrail (this early plan will be posted this afternoon, this is being done on my school laptop during a spare period), however I wasn't satisfied with them, as I wasn't able to get all my requirements into the space the way I was drawing it up.

Success finally came, albeit on the back of an Accounting assessment whilst waiting for it to finish. The following plan was drawn up, and then transferred to Anyrail from memory when I got home. 

774412276_BorderStationUnedited.jpg.a0c349f6adae090e2a9d0aaad3033382.jpg

The plan fitted all requirements. Through-running is possible through the use of the centre fiddle yard track (with the other 7 either side being dead-end). Peco Code 75 track is used throughout, even better it is all large-radius with the exception of the single curved turnout in the fiddle yard. The fiddle yard has 15 tracks, including the through-road. The turntables are all Peco, and it's overall dimensions are 7.1 x 3.6m (~24' x 12'), with a minimum radius of 1m (~3'3"). It is also a large border station, with a 5 road yard, 15 road engine shed, 3 road diesel servicing depot, 2.7m long platform, 75' goods shed and 50' goods platform, grain silos and stock races. 

 

Having had my 18th birthday on the 18th of June (Tuesday last week), I received a number of vouchers for my favourite model shop (Metro Hobbies), and for Bunnings. Thus, in order to force me to not continue changing the design (my habit of doing so being the only reason I haven't built a new layout since Skipton), I started buying items. I started with track due to needing to wait for Mum or Dad to come with me to go to Bunnings (I'm not allowed to drive unsupervised yet). I bought 2 left-hand turnouts, 3 right-hands, the curved turnout, and the double slip (known as double-compounds in VR terminology), along with the turntable for the scenic section and a box of flex. The turntable was quickly assembled, however the handrails have been left off as it will be modified to represent a South Australian 85' turntable. Another 4 left-hand turnouts and the 3 catch-points are on order from Hattons and should arrive either tomorrow or early next week. 

 

The sleepers around the tiebar on all points and the double compound were modified, with the sleepers cut down to the same length as the others around them, and the tiebar also shortened. The wood for all of the baseboards except the 5 fiddle yard boards was purchased yesterday and Tuesday, in the end I had to go to 3 different bunnings to do so as the first one I went to didn't have the 1200x600mm MDF boards, the 1200x70x35mm lengths for the legs, or the 1200mm lengths of the framework. The second bunnings had those two, however didn't have the 70x35mm size for the legs, thankfully the final one did, however even then it didn't have all 22 pieces I needed to do the scenic section, so for now I only have 14 legs. Baseboard construction will commence this evening, and hopefully all the scenic baseboards will be assembled by the en of the holidays (tomorrow is my last day of school for the term). 

 

I intend on eventually getting an NCE Pro-Cab 5amp system for the layout, however for the time being it will receive the Powercab from Skipton. All pointwork will have Cobalt motors, and I hope to use Cobalt S levers for control, at least in the station area - the 28 lever frame for the station yard will be expensive but hopefully somewhat impressive! Due to cost I may end up utilising Peco levers, or even just plan SPDT centre-off switches in the fiddle yard, however will still use Cobalt motors due to having had issues with polarity switching with Peco and SEEP motors in the past. 

 

Due to the size limit of files, I am unable to upload any other than the one above (having initially uploaded a couple and then deleting them to resize them so I could fit more, before finding out that uploaded but deleted files counted towards the limit), so they will be put in the next post

 

Peter

Edited by 60012 Commonwealth of Australia
Changing section on image upload due to being able to upload them in separate post
  • Like 4
Link to post
Share on other sites

Here are the photos that I was unable to put in the post above:

 

Points as purchased:

732450671_PointsUnmodifiedCompressed.jpg.4377765c9d9ca9df9124304d95580690.jpg

 

Points as modified:

607533797_PointsModifiedCompressed.jpg.bbb060dc53756e10fb6493b70c975daa.jpg

 

Baseboard Materials:

1844994996_Baseboard1Compressed.jpg.1023f672b025031cd50fd21770167941.jpg

595059579_Baseboard2Compressed.jpg.9f3ff807fa8914e1d94f78b958a56bae.jpg

 

With the pointwork I have so far, I was able to complete most of the yard throat for the South Australian end (minus the two catch-points being shipped from Hattons):

1958653173_SAEndYardThroatCompressed.jpg.3b4392f3c25055c297c9b845fb2d9054.jpg

 

Star Trek: The Next Generation on in the background, always find it nice to watch something while I work!

 

Peter

  • Like 4
Link to post
Share on other sites

Looks like a nice plan mate!

 

Is that the actual track plan of Bordertown or is it adapted? I like the idea of a continuous run and the fact that you are going DCC. Question, looking at the track plan you are only going to be able to have 1 train running around at a time due to there being 1 track (of course you can run more than 1 on the same track) but looking at the size of the fiddle yards would it be possible to amend the plan to have 2 continuous run tracks to give more operation?

 

Regards Connor 

Link to post
Share on other sites

6 hours ago, CCGWR said:

Looks like a nice plan mate!

 

Is that the actual track plan of Bordertown or is it adapted? I like the idea of a continuous run and the fact that you are going DCC. Question, looking at the track plan you are only going to be able to have 1 train running around at a time due to there being 1 track (of course you can run more than 1 on the same track) but looking at the size of the fiddle yards would it be possible to amend the plan to have 2 continuous run tracks to give more operation?

 

Regards Connor 

Thanks Connor. 

The track plan is purely fictional, based on VR practices as unfortunately SAR track plans are hard to come by. My idea behind the name Borderton was a combination between Bordertown and Serviceton (having forgotten about Wolseley being between Bordertown and Serviceton, the logic was it was a combination of the names of the stations either side of the Vic/SA border. My other options were Pinnerton or Serviceroo, combinations of Serviceton and Pinnaroo, being the two border stations actually located near the border, but I decided Borderton sounded nicer.)

In theory it is possible to modify the plan to have two continuous tracks, however I personally much prefer shunting and operation to continuous running, the through-road is primarily for running locos in, something I was unable to do with my last 3 layouts, all of which were end-to-end. My focus for operating is the process of loco changes, having a train come in from the VR fiddle yard, have the VR locos come off the train and get serviced, shunting locos do any required shunting, and then the SAR locos come on and move the train through to the SAR fiddle yard, enabling me to have a disproportionate number of locos relative to rolling stock as well as show something that I have never seen done on a model before should I choose to exhibit it, which is a possibility however if I decide to do so will not occur often due to its size.

 

Thanks for looking.

Peter

  • Informative/Useful 2
Link to post
Share on other sites

27 minutes ago, manna said:

G'day Folks

 

Going to follow this layout, Hoping to see some of Webbs 'Big' engines............

 

manna

Yup, got a BGM 500B brass and whitemetal kit to build when I get around to it, and I'm hoping to get a resin kit of a 720B too.

This is my SAR fleet at present:

 

Austrains SAR 700 class, #700, superdetailed and repainted from ANR livery in DCC, Auscision. It still needs to have horns, numbers and piping shrikes fitted. SAR 830 class, #835, in SAR mustard pot, and a Powerline kitbashed 48 class to make Australian National DA1 (currently waiting for correct AN paint), sitting on Slamron Valley with my 11 SAR wagons, a mix of 4-wheel and bogie opens and vans.

51005894_SARFleet2Compressed.jpg.803405989700fc90ec35b866bb177621.jpg

1081821431_SARFleet1Compressed.jpg.bc452fdfbabbbb1f4a77ad8818f7cd7d.jpg

 

Next up is the rarest loco in my fleet, a Powerline R-T-R CL class. From the only source of information I could find on the R-T-R ones - they released them as body kits, but until I found this one on Ebay wasn't aware that they had ever been done R-T-R - there were only 12 made total, with as few as 2 of each livery/number. As such, this makes it the rarest loco in my fleet. For anyone interested, a google search of Powerline April 2000 newsletter shows the only information I could find, the section on the CLs is on the 1st column on Page 4. 

859491321_CL1Compressed.jpg.b6a5e89bed14557c3bda89bb56267757.jpg

 

Here are a couple more photos of DA1. This was kitbashed from a Powerline models 48 class, with the front hood being cut down to form the sides and front of the nose, the top of the nose being formed from plasticard strip as was the front cab windows, side cab windows extended out and new dividers fitted, and a double-skin roof and aircon being formed from plasticard, with the number and light boards being cut from the remainder of the short hood and refitted to the top of the cab. The chassis was heavily modified to move the motor bogie to the rear (it originally fitted in the cab, however due to the lower nose it was unable to remain there. As with the 700 this is awaiting some extra detail. 

1907109236_DA1Compressed.jpg.ac733de74448d6f6572914993c42292a.jpg

822884690_DA2Compressed.jpg.a71a9c935dc96be60f97fa5a24d20c1e.jpg

 

I also have two 930s on order from the Train O Rama 2nd run, 934 and 959 in SAR red and silver so I have one each of the single and double enders. 

For SAR rolling stock, I have 2 O type bogie open wagons, 3 OB type 4-wheel open wagons, 2 D type bogie louvre vans, 3 DW type 4-wheel ventilated vans, and a D/DA 4-wheel louvre van, and an Auscision BE which has been repainted into the 1930s Overland livery of green with black roof, and will receive yellow lining.

 

Peter

  • Like 3
Link to post
Share on other sites

Nice Peter, Understood about the desire to do shunting, I also enjoy this opertaional aspect of the hobby. Is the fiddle yard going to be hidden (from public view) or sceniced. We have a exhibition layout in South Australia known as 'Strathburn' which is that exact concept.

http://www.sarma.asn.au/

 

Regards Connor

Link to post
Share on other sites

14 minutes ago, CCGWR said:

Nice Peter, Understood about the desire to do shunting, I also enjoy this opertaional aspect of the hobby. Is the fiddle yard going to be hidden (from public view) or sceniced. We have a exhibition layout in South Australia known as 'Strathburn' which is that exact concept.

http://www.sarma.asn.au/

 

Regards Connor

The fiddle yard will be hidden for now, the red lines on the plan denote where the scenic sections end. I may extend them though to get more of a scenic mainline run, at the moment there's 7m of scenic mainline (counting the station), if I extend the scenic section along the curved boards I can get up to 9m, although I'm not a huge fan of scenic ~180 degree curves, even with the extremely large rardius.

 

Peter

Link to post
Share on other sites

  • RMweb Premium

Looks good Peter. Where will it all live - in the garage?

 

I share your pain regarding Bunnings - especially when I have to search through about 50 lengths of timber to find half-a-dozen that are not twisted beyond recognition.

  • Agree 1
  • Friendly/supportive 1
Link to post
Share on other sites

1 hour ago, St Enodoc said:

Looks good Peter. Where will it all live - in the garage?

 

I share your pain regarding Bunnings - especially when I have to search through about 50 lengths of timber to find half-a-dozen that are not twisted beyond recognition.

Yes, it will be in the second story of the shed (the previous owners had a large pinball machine collection so built a double-story shed). One of the fiddle yard baseboards will have to sit over the stairs due to their location. And yes, the quality (or lack thereof) of the Bunnings wood is annoying at best, infuriating at worse. I went through an entire pile to get the 1200mm long framework, and even then had to settle for a couple of minorly bent pieces (not twisted though thankfully). 

 

Peter

Edited by 60012 Commonwealth of Australia
Fixing "owners had a large pinball machine" to "large pinball machine collection"
  • Like 1
  • Friendly/supportive 2
Link to post
Share on other sites

G'Day Folks

 

Thanks for the run down of your stock, Diesels are interesting, but steam  are magic, 720's and 500's probably the best in Australia  (waiting to be shouted down) mind you the AD60's were pretty good. 

 

A layout like this might give you the chance to run a Class S (4-4-0) as a shunter.

 

manna

Link to post
Share on other sites

38 minutes ago, manna said:

G'Day Folks

 

Thanks for the run down of your stock, Diesels are interesting, but steam  are magic, 720's and 500's probably the best in Australia  (waiting to be shouted down) mind you the AD60's were pretty good. 

 

A layout like this might give you the chance to run a Class S (4-4-0) as a shunter.

 

manna

As biased as I am to VR stock, I have to agree that you can't quite beat the semi-streamlined look of the massive 500B and 720Bs (725-737 being the semi-streamlined ones), except for perhaps by an S class. I have a PDF file of basic diagrams for all SAR locos, the S, Q and K are other older locos that interest me and may end up as scratchbuilds. An Orient Express F class is definitely on the cards at some point as well as an Rx or two, which will most likely be a conversion from a Wombat Models NSWGR C30T which I hear is almost identical. I would also like a 750 or two, as the VR Ns are one of my favourite classes of loco. Certainly a long enough list to keep me buying/building for quite a while yet!

 

Peter

  • Like 2
Link to post
Share on other sites

Some spare time Friday afternoon and yesterday lead to the shed being cleared up enough to fit all the baseboards purchased, and then the boards being placed down to give me a look at how everything will look when it's finally put down. 

Below is after the track was placed down initially. Please excuse the mess that surrounds it.

1601974469_Borderton1Compressed.jpg.03636b700122460a5fb379adbb767801.jpg2000209106_Borderton2Compressed.jpg.272e4257f0e386aa3ec6ca05af2f1bd8.jpg

 

Next, some Peco turnout templates were printed off, added, and a passenger train placed in the platform road to get an idea of how long the platform is. The 7 car train appears short in the platform, and yet is double the size of the passenger trains that could be run on Skipton.\

48551075_Borderton3Compressed.jpg.b491bd44347e5408fbb282a70c0e8c19.jpg

1569639032_Borderton4Compressed.jpg.b0b29d62fbc7473f042bc9bc5586d503.jpg

1366470190_Borderton5Compressed.jpg.af82d7baca0b4ffa22a60eae6ffb82db.jpg

 

Next, another trip to a local hobby shop yielded another box of flex track, and the final 4 turnouts, which along with the 4 turnouts and 3 catch points which are due to arrive from Hattons in a day or two will provide the rest of the track for these 10 scenic boards. These were loosely placed down, along with almost my entire fleet of VR and SAR wagons, reminding me that whilst they may have been more than enough to operate Skipton with, I'm going to need many, many more in order to run this layout well. 

1763040997_Borderton7Compressed.jpg.3335a042f0f4713e7949d4b441ce69a6.jpg

246990143_Borderton8Compressed.jpg.c9a854db6c60a2d3649708dcb18bef33.jpg

2131813994_Borderton9Compressed.jpg.3c2bbc855ea1fa68cdf94b6c7f277bee.jpg

1328704337_Borderton10Compressed.jpg.68956936b5dfabda6d830dead4148bfa.jpg

 

Subject to how I feel today after a personal incident yesterday evening I may start baseboard construction later today, however at the moment am having difficulty finding motivation for anything so there may not be any progress until tomorrow.

 

Peter

  • Like 2
  • Friendly/supportive 2
Link to post
Share on other sites

Haven't left my room to go and do baseboards yet today, but have drawn up the signalling diagram for the station lever frame. So far it's at 25 levers, not sure if I'll add any more shunt signals or not but it's a possibility. As I plan to use Cobalt S levers and Cobalt iP Analogue point motors, the 25 levers and 18 motors will be quite expensive. Whilst in reality it is likely that the loco depot turnouts (14, 18, 19, 21, 25) would be hand-thrown, they're still being included on the diagram and in the lever frame, and I may run point rodding to them (but I'm not sure yet). Most VR loco depots were hand-thrown, however a couple had some (but not all) turnouts operated from the signal box, including Korumburra, Seymour and Traralgon (all except one end of a double-compound were operated from the signal box at Traralgon). As such, there are precedents for having at least a couple of points operated from the signal box.

Borderton_Signalling_Diagram.jpg.95c8da4e29a4778aa8c66b875a1cf8fe.jpg

 

Peter

Edited by 60012 Commonwealth of Australia
Removing unnecessary text
  • Like 2
Link to post
Share on other sites

  • RMweb Premium
8 minutes ago, 60012 Commonwealth of Australia said:

Haven't left my room to go and do baseboards yet today, but have drawn up the signalling diagram for the station lever frame. So far it's at 25 levers, not sure if I'll add any more shunt signals or not but it's a possibility. As I plan to use Cobalt S levers and Cobalt iP Analogue point motors, the 25 levers and 18 motors will be quite expensive. Whilst in reality it is likely that the loco depot turnouts (14, 18, 19, 21, 25) would be hand-thrown, they're still being included on the diagram and in the lever frame, and I may run point rodding to them (but I'm not sure yet). Most VR loco depots were hand-thrown, however a couple had some (but not all) turnouts operated from the signal box, including Korumburra, Seymour and Traralgon (all except one end of a double-compound were operated from the signal box at Traralgon). As such, there are precedents for having at least a couple of points operated from the signal box.

Borderton_Signalling_Diagram.jpg.95c8da4e29a4778aa8c66b875a1cf8fe.jpg

 

Peter

Peter, could you make 10 a third end for 9 so that whichever way the West end of 9 is lying you get trapping protection from the loop sidings (same with 11 and 13)? I reckon you need two more signals, one at each end of the yard for trains to exit.

 

Caveat - that's how I would do it for a British layout. I've no idea how it was done in VIC or SA.

Link to post
Share on other sites

31 minutes ago, St Enodoc said:

Peter, could you make 10 a third end for 9 so that whichever way the West end of 9 is lying you get trapping protection from the loop sidings (same with 11 and 13)? I reckon you need two more signals, one at each end of the yard for trains to exit.

 

Caveat - that's how I would do it for a British layout. I've no idea how it was done in VIC or SA.

Unfortunately not. All scenarios I can think of leaves it with either one of the 2 being unprotected (the most effective scenario I could think of left 5 road unprotected in one case and 4 road unprotected in the other), or makes moves from 5 to the main impossible. Either 10 or the catch point in 4 road (lever 9 catch) need to be separate from 9 to be able to have both roads protected and still have all moves possible, and in reality the catch point is more likely to be connected than 10.

Thanks for the suggestion though.

 

Peter

  • Informative/Useful 1
Link to post
Share on other sites

After dinner I decided to go out and build some baseboards. This evening 3 of the 10 scenic boards were completed (minus legs) before I decided to come back inside. The 3 completed are the 3 to the top-right of the track plan in the first post. 

The first board completed was the hardest, as I had to use a jigsaw to cut it on an angle, as this board provides the transition between the 600mm wide station boards and the 900mm wide loco depot board. The cut was done, and the framework added.

1320351449_Borderton11Compressed.jpg.35b8f461c41106b571a7ddf68c7b0a23.jpg

 

As always, the temptation to put some track down onto the completed board was too great to resist.

1251727818_Borderton14Compressed.jpg.7c1a0cc5f780a24ffb49970cbdfa966a.jpg

The 3 tracks to the left are the diesel depot, the one to the left of the diesel depot is for the coaling stage, and the two to the right go to the turntable and roundhouse.

 

Next, the 900mm wide turntable/roundhouse baseboard was built.

1930568112_Borderton12Compressed.jpg.cbeb77f01b14b75be7904e62d6d89386.jpg

The 2 boxes worth of flex track, 7 turnouts and double slip that form the scenic baseboard trackwork (aside from the 4 turnouts and 3 catch points that should arrive from hattons tomorrow or tuesday) can be seen on one of the unassembled boards. 

 

Next was the first of the 600mm station boards, seen here receiving the framework. I use 89x19mm pine with 9mm MDF, with 30mm 8G screws to hold the boards to the framework and 40mm 8G screws to hold the framework together. 

938967706_Borderton13Compressed.jpg.7d1b052a552dea4ae057fa5350568403.jpg

 

Then, once again, the temptation to put track and stock down was too great. This time however I started putting it down semi-properly, fitting rail joiners to the turnouts and cutting the end sleepers off the flex track. Cork underlay will be fitted prior to the track being laid permanently.

492917375_Borderton15Compressed.jpg.6f575135908ba9f0c9e2c11c4dfe5cc9.jpg

 

Then a few locos and wagons were put down. In 5 road next to where the grain silos will be are a few VR 4-wheel grain wagons, in 3 road are a mix of VR and SAR general open wagons and vans, with 835 and a BP tank wagon next to the fuelling point, and S313 in the third diesel road.

1662964500_Borderton16Compressed.jpg.d54bcc1d8f6df17464ebe368a4a99bd6.jpg

2092512851_Borderton17Compressed.jpg.d1e41786ffbf4b5c122c3e832e1f9df4.jpg

936436510_Borderton18Compressed.jpg.2d34157e35fc655bc731f569da1059c0.jpg

 

Hopefully tomorrow will see the assembly of the remaining 3 station baseboards, and the fitting of legs and bolts to all 6. Being on school holidays for the next 2 weeks means I will fortunately have a lot more time to work on the layout.

 

Peter

Edited by 60012 Commonwealth of Australia
Edited for clarification
  • Like 4
Link to post
Share on other sites

Today saw the completion of 5 more baseboards, leaving only two (one of the 900x600mm boards, and one of the 1200x900mm boards) to be completed, for which one (the 900x600mm board) has had the framework cut out. Below are some photos of the boards, including the one which is modified to allow for a bridge. 

Borderton_19.jpg.3212e899b023667bd556a73f87012a12.jpgThe pile of baseboards slowly increasing (being piled up to retain the space being used to assemble the boards).

Borderton_20.jpg.919111fdb40ea9eb7367627051367847.jpgThe final basic 1200x600mm board has been assembled and added to the pile. This was followed by about half an hour being spent trying to decide how to do the dropped baseboard. In the end I went for an extra brace piece on the top of the boards, to drop it so that the MDF board will be below the bottom of the framework on the other baseboards. Below is a basic drawing of how this will work.

1545346558_DroppedBaseboardDesign.png.23cb1e8e58521a9d72c0b15bd2d7658e.png

Once I had decided that this was how I would do it, I assembled the board.

1029825553_Borderton21Compressed.jpg.f7da32a7038d3a4aa6ee02e4e0b130ba.jpgNext, the first of the two 900x600mm boards were assembled, and is seen here next to the dropped baseboard, along with a close-up showing the assembly of the dropped board

1523682820_Borderton22Compressed.jpg.45cca08c59974586ccc54999b6c681bb.jpg

2093908698_Borderton23Compressed.jpg.1731c3736520e3dc4280d80e18512bd1.jpg

The two small strips of MDF will be added to the top of the planks used to bolt the boards together (the two pieces above the board), in order to bring the track height up to the correct height at each end of the board.

 

That's all for now, will assemble the final two boards tomorrow and hopefully complete the legs before driving up to the heritage railway at Maldon to do some volunteer work there on Wednesday.

Peter 

  • Like 3
Link to post
Share on other sites

Ended up being somewhat busier than planned, got back from Maldon Wednesday evening, then had a friend over Thursday, went out to the Diamond Valley Railway (a 7 1/4" miniature railway in Melbourne) where I'm a volunteer and spent the day at a young members workday/playday (4 hours of sleeper replacement followed by train running), then went and chased the Steamrail shuttles between Bell and Mernda with A2 986 and K190 on Saturday. 

So, this morning, I made a start on cutting to size and bolting legs to baseboards (as, of course, Bunnings 1200mm lengths means 1200mm +/- 20mm). Cutting them down to 1150mm ensures that any lengths shorter than 1200mm are still useable, and yet will still fit over the stairs (there are small walls next to the stairs in the shed, which are 1015mm tall, meaning a minimum leg height of 1105mm to allow for the 90mm framework, 1150mm makes it comfortably fit over the top with some room to spare.

 

The first board I started with was one of the 900x600mm boards, as the way I have set out the legs (see the plan in Post 1) means that there is a certain order that boards have to be joined in, as only approximately 2 in 3 boards have legs. 148311597_Borderton24.jpg.b33c0d9c56435f3a87f69bc15a3482d0.jpg

 

Next, I did one of the two 1200x600mm boards that will receive 4 legs (one will get 2 legs, due to there being 6 baseboards along the scenic end means that I can't have the nice one with one without arrangement that can be seen on the fiddle yard boards.). 

1617240363_Borderton25.jpg.7100b04fe788bf3d0ac2af0246d12198.jpg

 

Next I did the turntable board, which differs to all the others in that one of the legs isn't on the end of the board, as the bolts would conflict with where another board connects to it. 

12043540_Borderton26.jpg.5d9922fcab0bc2ec6618550947959db6.jpg

Next I decided to take a break from cutting and joining legs, and the final turnouts and catch points having arrived on Friday decided to set out all the turnout arrangements and fit rail joiners and cut sleepers where necessary.

1742437834_Borderton27.jpg.64e5a9b90dd6ce045261852aa8d2767c.jpg 1355887314_Borderton28.jpg.d9ffd29a9c6f096384eb09293bb3f81e.jpg

 

With luck the remaining 10 legs will be cut to length and fitted, and the boards bolted together this evening. 

 

Peter

  • Like 2
Link to post
Share on other sites

Several hours and a lot of sawdust later, the remaining legs were cut and joined to the boards, and the boards bolted together. The layout seems so much larger now it's up on it's legs and the whole scenic section assembled, even more so than just having the MDF sheets sitting on the floor.

Viewed from the South Australian end.1517390720_Borderton29Compressed.jpg.def77aea2364b8b1692ab65ce71befdc.jpg

From the Victorian end

452171196_Borderton30Compressed.jpg.0965bcac2ce02666bd250a596798d845.jpg

The dropped baseboard for the bridge can be seen in the background. Below is a close-up showing the board, with a trestle bridge I built for a diorama on it. The bridge isn't the right size or shape for the layout, otherwise I'd use it instead of building a new bridge.

1987352926_Borderton31Compressed.jpg.d747d4c21856db289136382568c35a48.jpg

 

And, as usual, some track was placed down. I need to buy cork underlay and a new track cutter before I can stick it down properly, but it's really nice to see how it all looks properly. 

329521511_Borderton32Compressed.jpg.1d552cf20b95810fd003f31e2c712e85.jpg

^Station looking towards the Victorian end and the loco depot

616361956_Borderton33Compressed.jpg.9467ce0de0ba8d2094896adb20d0f9d0.jpg

^ Station looking towards SA end and the floodplains bridge (or site thereof)

1473900825_Borderton34Compressed.jpg.2f500ed9119418814d97a4fce8d80d9e.jpg

Loco depot, showing the 3-road diesel depot to the left, the coaling stage in the centre, and the two turntable roads to the right.

 

The precise positioning of the track will vary from where it is now to enable all the turntable roads to fit properly and fit a decent size station and environs, but the arrangement of the track is more or less correct (minus some lengths).

 

Peter

Edited by 60012 Commonwealth of Australia
  • Like 2
Link to post
Share on other sites

Will be following your progress. Always like to see Australian models, particularly VR. Didn't manage to do much in the way of railways when I was in Australia at the beginning of the year. We did a trip on the  WGR and Melbourne to Adelaide on the Overland but that was pretty much it.

 

Al.

Link to post
Share on other sites

  • 3 weeks later...

Not much layout progress recently, been slowly gluing the track underlay (Woodlands Scenics 5mm foam type) to the baseboards. Over the last few days of last week, and the weekend I built a number of new wagons for the layout: one BB type bogie box van, two T type insulated vans, one TP type insulated van, one QR type open wagon, a GY type open wagon, and an I type open wagon. All except the BB were standard Steam Era Models kits, the BB was a severe kitbash from two Steam Era Models B type vans. In order to get the side panels the right size, each BB van side is formed up from no less than 9 cut/shut pieces from the B van kits, and the ends required a number of the ridges to be filed flat (5 on the handbrake end, 3 on the non-handbrake end). 

Below are some photos of them.

 

BB Van (Currently awaiting handbrake details and the correct bogies).

447335246_BVan1.jpg.35eb8c640ac244723f439ac35080dca7.jpg

2012917769_BBVan2.jpg.3f1ed4f19cc115f320827ebcbbbed762.jpg

105703381_BBVan3.jpg.ef28e9b28651752a0f3934912b927e3a.jpg

 

T van (As there are two I only photographed one)

1417905826_TVan1.jpg.55493535d62eeecd7b5a7e4e5b81c430.jpg

898622972_TVan2.jpg.d10938588c8884c305c5ddba1c3299ba.jpg

 

QR wagon. The handbrake on this wagon was particularly fiddly, being made up of 4 brass and 4 plastic pieces.

1226903562_QRWagon1.jpg.e26bf7c1fa140a991d4e2a01f8649648.jpg

539268442_QRWagon2.jpg.9d7952cb03363edc7a0818783ccc81bd.jpg

534687268_QRWagon3.jpg.03bf3c016dd83a8a0d3a2d5a872854e7.jpg

1683941007_QRWagon4.jpg.be40a7603257cf896e0d2989ea7bc465.jpg

 

GY wagon. One of the nicer kits to build, although the brass handbrake detail is always fiddly (although not as much as the QRs!)

1023732874_GYWagon1.jpg.c683aa3cb4b81ad54d1c63810d8f2c31.jpg

935255632_GYWagon2.jpg.2f1f7cd77119155500d094116bba6b59.jpg

 

I wagon. This one is far, far simpler, being a much older (1990s) kit, so has less detail parts to add, with things such as handrails being molded on.

1765114506_IWagon1.jpg.db8250b2202e634ca19d8d7f4b18f185.jpg

1987791771_IWagon2.jpg.6606ea35733b98ccbd1da9004521ff7c.jpg

 

Whilst the BB van was built over 3 days (to give the sides time to harden before proceeding with other parts), the two T vans, QR wagon, I wagon, GY wagon, and TP van (seen in the photo below, it's the one with the black bogies) were all built on Sunday, between waking up at 1pm and starting to study for my Product Design assessment at 1:30am (The assessment was this morning, and despite only 3 hours sleep was completed successfully). 

2068000872_6Wagonstogether.jpg.5c6f59477f6d4c2d8aaf0338a6a09b42.jpg

 

These 7 wagons, especially the three bogie vehicles (bogie stock being few and far between in my fleet), will make welcome additions, and will help to fill the layout with stock. I have another T van (this time a short wheelbase one, unlike the long wheelbase ones above), two more GYs, and two M type cattle wagons to build, however have used up my supply of Sergent couplers so they will have to wait until I can order more (hopefully this week). 

 

Peter

6 Wagons together.jpg

  • Like 5
Link to post
Share on other sites

On 29/07/2019 at 18:20, manna said:

G'Day Folks

 

Nice work, I do Like the Top, open bogie wagon, reminds me of the GN bogie brick wagon.

 

manna

Thanks

 

Yes, the QR does look very similar to the bogie brick wagons. It seems to be a very commonly used style - the SAR had them, albeit a 4 door version (the VR also had a number of 4 door ones, about 70 from memory, built after the 3 door ones, resin kits are available for the 4 door ones), Queensland Railways also had a very similar design, and I have no doubt that there are plenty of other similar types around the world.

 

Peter

  • Agree 1
  • Informative/Useful 1
Link to post
Share on other sites

Peter, great to see you back. Looks like you have been busy. Its great to see that you are not going for the flat layout that typifies the general VR layouts on the exhibition circuit here  in Melbourne. 

 

i'll look in regularly... Hope we'll see you at the AMRA exhibition in a couple of weeks 

  • Thanks 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...