I hope everyone is well at the moment. one bonus of more time at home is more time for modelling.

 

We’re finally prepping for the track to go down. One of the Jobs that needs to be done first is the hard standing/catch pit for the cattle dock.

 

We have chosen to do a brick one very similar to the one at Shirley (Solihull)

 

This is is now ready to go down although the rails are just temporary and need to be slid out. it will eventually have the full length rails slid through and sleepers either side

 

5D41846D-797A-47A6-B7E7-1ED6DE878D2F.jpeg.226e1b21bf7f7a1bb72a6cf6a2f17839.jpeg

 

DB4C6FEC-F5EC-4580-B017-D437DA70367C.jpeg.6b70c7fb5befa3adffce3ff15ee8ed05.jpeg

 

A9390D67-D9FB-4B83-9391-ADF1980E9657.jpeg.ac85ba89abc631bd88478c290808fb46.jpeg

  • Like 6
Link to post
Share on other sites

  • 2 weeks later...

Progressing well on the engine shed. 
 

All of the brick detail work around the top of the building is now in place, the window Cills and lintels have been added which makes a massive difference to it’s appearance.
 

The roof trusses with the smoke gutter are done, a bit of guess work on this as there are no pictures and at least it will hardly ever be seen. 
 

finally, Plastikard roof has been made with barge boards attached, the office chimney has been attached to this. I now need to make up the 4 chimneys for the main building

 

FECE6447-5AC2-4ED9-910D-7C91DD5B5669.jpeg.1ac8d417b4e3bb20efd4b9edd7c1510b.jpeg

 

3BCB7271-6F00-4E1C-B63A-F4614564BB4D.jpeg.3ab17398278ccd830cc696ca9c960c1f.jpeg

 

7FF32F24-A899-4D75-8769-6F87B365DE5E.jpeg.687a0b399d6fa75c253e919e817f319d.jpeg

 

E3D262CB-88E5-4A76-9266-E14FECF3765A.jpeg.a66e8e9d5690eb987bfbead70b5f72f6.jpeg

 

2EA54B7F-8B1B-42A8-8985-F197A29B4D55.jpeg.046206e516e3f2737b6dfe092e8ce91b.jpeg

 

 

  • Like 10
  • Craftsmanship/clever 8
Link to post
Share on other sites

  • 2 weeks later...

Further progress on the shed and surrounding area.

 

on the shed.

All of the brick has been painted (white washed on the inside).
Not keen to keep the white plastic, the underside of the roof has been added.

We’ve gone for Battens and then vertical planking which we’ve seen used on several goods sheds. 
we’ve started assembly of the main chimneys which has suddenly given a lot more character to the building.

The basic assembly of the doors is now complete, We need to score in the line of a ‘man door’ on the one side and add some fittings like hinges

 

Having an hour to spare yesterday a simple coaling stage has been put together, it still needs steps to the one side and to be painted but this nicely completes the shed area. (Although we still need a water crane)

 

3FD33F8A-8C87-472D-93C2-9ECBF817834A.jpeg.bb1d2e071b091867c272b13dfab2b810.jpeg

 

6415CB41-3E42-44A3-8F2C-EBA6BE4F2E68.jpeg.d2159ab0b4402700d9755b947c21f44e.jpeg

 

771D7ED8-57F3-4AAE-90E3-66497712C955.jpeg.8bc1560edfb1f658af6c07533686f0d8.jpeg

 

88711AEE-86D8-42F3-A8B5-38059B835373.jpeg.d3a829c1aca7e4e95b4f72d9f548255f.jpeg

 

A25DC6F0-A252-4082-9651-44B482D798AD.jpeg.5903b8ad305543751ec7f6708d06af4e.jpeg

 

A3E84074-6280-46C0-918A-C961A8AD63B9.jpeg.c30541aa68660fe4dc97af88486988bd.jpeg

 

2D269DC9-FC6C-4198-9319-ECAD59533753.jpeg.5b196592758343b71581cce83421b891.jpeg

 

  • Like 11
  • Craftsmanship/clever 3
Link to post
Share on other sites

The first section of track officially stuck down on the layout! This is the catch pit which was seen in some recent posts, Ideally I would have left this until track laying has started in earnest. However that is a fair way off at the moment! 


The catch pit, being flat and unsupported it has started to curl, so it was worth getting it stuck down to stabilise it.

 

73004C2C-496C-47E7-B2E3-96D4D42C38F9.jpeg.79deec4689cef837da665ebbacbb2e1c.jpeg
 

A2A387B5-52E7-4961-8949-69086EBBCE3F.jpeg.60053079a1ac96683258d37e3ddfe4cb.jpeg

  • Like 7
Link to post
Share on other sites

22 hours ago, Johndc120 said:

Further progress on the shed and surrounding area.

 

on the shed.

All of the brick has been painted (white washed on the inside).
Not keen to keep the white plastic, the underside of the roof has been added.

We’ve gone for Battens and then vertical planking which we’ve seen used on several goods sheds. 
we’ve started assembly of the main chimneys which has suddenly given a lot more character to the building.

The basic assembly of the doors is now complete, We need to score in the line of a ‘man door’ on the one side and add some fittings like hinges

 

Having an hour to spare yesterday a simple coaling stage has been put together, it still needs steps to the one side and to be painted but this nicely completes the shed area. (Although we still need a water crane)

 

3FD33F8A-8C87-472D-93C2-9ECBF817834A.jpeg.bb1d2e071b091867c272b13dfab2b810.jpeg

 

6415CB41-3E42-44A3-8F2C-EBA6BE4F2E68.jpeg.d2159ab0b4402700d9755b947c21f44e.jpeg

 

771D7ED8-57F3-4AAE-90E3-66497712C955.jpeg.8bc1560edfb1f658af6c07533686f0d8.jpeg

 

88711AEE-86D8-42F3-A8B5-38059B835373.jpeg.d3a829c1aca7e4e95b4f72d9f548255f.jpeg

 

A25DC6F0-A252-4082-9651-44B482D798AD.jpeg.5903b8ad305543751ec7f6708d06af4e.jpeg

 

A3E84074-6280-46C0-918A-C961A8AD63B9.jpeg.c30541aa68660fe4dc97af88486988bd.jpeg

 

2D269DC9-FC6C-4198-9319-ECAD59533753.jpeg.5b196592758343b71581cce83421b891.jpeg

 

Coming along treat this build Johndc...

  • Like 3
  • Agree 1
Link to post
Share on other sites

Amazing the difference just adding the roof to the building has done to the look of it, the end is now very much in site as all I need to do is add some detailing bits and fit the windows

 

0F0A86EB-830D-4E5C-A758-48E22D1C7571.jpeg.f092598fb175a077d4cf879c32c6973b.jpeg

 

7B5E8205-9DD0-4C93-BCE1-0561D7818876.jpeg.3e167612e899eca0928a681608bca75e.jpeg

 

it’s also made a massive difference to the light level inside the shed

 

1FDBC2A1-45C5-4A6B-BC3E-CE273C2AF38F.jpeg.21aae992e9e53cc5fa3be7c18662e720.jpeg

  • Like 8
Link to post
Share on other sites

Hi John, I'd seen bits and pieces of this before but just had a proper read through from the start. The originality and the quality of the structures and all your design work are really excellent. I like how you combine 3D printing for basic forms with traditional methods for finishing, it seems to be working a treat. Will look forward to seeing more taking shape.

 

Adam

  • Like 1
Link to post
Share on other sites

17 minutes ago, Calidore said:

Hi John, I'd seen bits and pieces of this before but just had a proper read through from the start. The originality and the quality of the structures and all your design work are really excellent. I like how you combine 3D printing for basic forms with traditional methods for finishing, it seems to be working a treat. Will look forward to seeing more taking shape.

 

Adam


Thank you very much Adam, I’m a massive advocate of 3D printing but it definitely has it’s limitations. 
 

the main one of course is unless your using a resin printer (which have their own limitations), the surface quality isn’t good enough. However I find it perfect for making the shells of buildings, it’s ABS plastic so plastic weld can stick styrene to it and it takes a fraction of the tame to design and make

 

John

  • Like 1
  • Agree 1
Link to post
Share on other sites

Some more work on interior detailing of the shed, trying to resemble what was at Wallingford shed. 
 

next job is to fit some side cabinets and some fire buckets

 

561641B9-E2B3-4094-9FD9-1AD83C1C41DC.jpeg.b1ca7e6941566fd639c37183e6d9ffe7.jpeg

 

F61AA79F-75D0-4A8A-B081-2897DAB8658E.jpeg.49a70e98756959ab0e4ce0778959382b.jpeg

(image flipped as we’re modelling the opposite hand)

 

We’ve also added the water tank roof which we can now start to detail

 

56174817-4DD3-485E-8C14-EBDE4095E9A8.jpeg.b8bee134e1647d4a4e289001c1087ca2.jpeg

  • Like 9
Link to post
Share on other sites

As a bit of a break from the engine shed, we’ve done a bit of work on the culvert. 
 

We’ve managed to get it painted, it was in 2 separate parts which have now been stuck together with a strip of 60 thou plasticard to support.


B489EC09-0B67-42B2-B89A-575F5665863E.jpeg.5ee8187b53e63e6c13617ed6e6759d81.jpeg

 

DCA576EA-0834-4322-A452-EF52E0A6C234.jpeg.ee2f360d4db430c4d74fc7b439193808.jpeg

 

D2EA5B08-9C9B-45DF-8B4A-9716E78E51F3.jpeg.dfefd9f344bcbb4d418c3869175490cc.jpeg

 

6A306A01-FD26-4CF9-A61C-F613F7D3A409.jpeg.b08bf5c5d3f6d6fbe1e11c04ece054d1.jpeg

 

C866072D-1E9D-406B-BE49-342E70C513BC.jpeg.531a80fb104c5ebdd0c92acf16be1b88.jpeg

 

 

for what will be quite a simple structure once on the layout, it was a complicated piece to design as it passes under 2 separate lines one of which has a point above. 

 

6E9341D7-2DCC-4EDA-96AF-AA2F4E83EA13.jpeg.f30d7c3010331db6cf8e7aa8858ec148.jpeg

 

 

it fits in this hole under the train

 

2956788F-6853-407C-9F3E-835D0D4295D5.jpeg.c2203db7b8183d63943333f421360e93.jpeg

 

  • Like 16
Link to post
Share on other sites

  • 5 weeks later...

Although we can’t do work on the layout at the moment, things are still progressing in the background, tonight we’ve been assembling the buffer stops ready for when track laying starts. These are Lanarkshire models kits which have been glued together with a piece of tissue paper in the joints to electrically isolate them.

 

AA4D5F98-BD29-41F7-B6C0-7C78CB7B7A1E.jpeg.a2b95addc7dc5042d9a8a583b09f28c1.jpeg
 

A3D203E3-8B4C-47A1-B6CB-85DE81E2442A.jpeg.40747a2aabd05a4410bc0a26129fd9b2.jpeg

 

1EBEE5D2-A39E-41B8-A5B6-82900710CB91.jpeg.992478c53acc6d7eba8899a9102d7ce4.jpeg

 

  • Like 5
  • Informative/Useful 1
Link to post
Share on other sites

This week I’ve also assembled a Mike’s models light yard crane. As supplied it comes with a rear counterweight, this was removed to make it correct for our use

 

seen here next to it’s bigger cousin, the 6T heavy yard crane, the small crane will be situated in our goods shed.

 

usually a goods shed would be fitted with gibbet style crane but as the design we have is not a through shed, it required the greater reach of the light crane

 

a good example of this is the one at Princetown 


the lifting capacity of this crane was only 1T so anything over that would have to be unloaded on the outside heavy crane

 

7E9CCFE8-6178-4C9F-BAE1-8A770B5F8C5B.jpeg.060d96df4d0efc8c426b40b1e1718ecb.jpeg

 

DA41FC3F-9B28-4192-9D4F-CAEA64FE5B8D.jpeg.e3825c44c898cf3c0d51cf90f0893875.jpeg

 

1F224C0A-6A25-4EC9-8CD4-85757A2FC300.jpeg.cdb0e3841e38aa4c6659b04fa2b6421e.jpeg
 

D5E95F31-AEB0-4641-913D-D33601E1D5E2.jpeg.188cd49d44ac8de637728efab3ffab16.jpeg

  • Like 11
Link to post
Share on other sites

  • 1 month later...

First bit of work on the layout in a couple of months. Last night we started the track work in ernest. We have fixed down all of the point timbers for the station end (just the 2 points at the junction left to do, hopefully we’ll get some rail down soon

 

we also cut away the cork around the kadee magnets and they are now in place

 

3B5D644C-D8F9-4860-9429-6241BBE72495.jpeg.d908f553f721ad2d960d55bcbdc3ad99.jpeg

 

FCD60867-F25D-4747-9D45-42C8CF16E3F6.jpeg.6e05a56e0aa526e8b16e040099cd07a8.jpeg

 

B858E5F5-AAAA-4B09-8B47-F5457E1154BB.jpeg.18d6fad421600b17ed816ef30eff2c2f.jpeg

  • Like 5
Link to post
Share on other sites

  • 2 weeks later...

First 3 sections of flexi track on the layout, we are using fast track by Exactoscale. The bit going up the gradient is the outgoing track, we have also laid the bay platform (with buffer) and most of the main platform along side it

 

AC986EC7-F4C5-491B-9201-F9C9B51CBCD3.jpeg.33449ec3883a3111b12daadea2245656.jpeg

 

7B0D1267-28C3-4E4F-846F-FD4439BB451B.jpeg.44145e6aa86fb8fc76d1d957c1bce692.jpeg

 

523670F1-B579-47EE-8176-F2ADE0443098.jpeg.9d63e07eb5c6ae8b155cb2e08bc1e9be.jpeg

 

 

We really like the way the track sweep round the corner and up the gradient to the bridge

 

369DFD57-7247-4344-8E2C-E34C5A98BD0D.jpeg.a434cd8fbfaa4845fd193fc6a631d2aa.jpeg

 

Couldn’t resist Putting the inspection saloon on to see how it ran on the track

 

9827D802-8D63-4063-A2D3-FC1C76A607F1.jpeg.c2250a1fdbfbaedef50c2a561a1d7869.jpeg

 

also an auto train in the bay and what will be something like out branch freight 

 

1C581DD3-2D1A-42D3-A1B5-30A61EAD73E3.jpeg.05ad12ae07e03460201b2e9ef6aabcec.jpeg

 

3313BE9E-F1FA-43EA-920A-55D36DE00CDC.jpeg.4f655164a120ddb7cd949bb581882e96.jpeg

  • Like 6
Link to post
Share on other sites

Lots more progress on track work yesterday, the second line (arrival line) down from the bridge has be laid and the head shunt which stays level up to the river is now in including the buffer stop

 

A371E7F1-DF37-40C3-9323-6C8B42772B3C.jpeg.2a4633304015e5c2ed11b98d6d0aced8.jpeg

 

8782B2E3-5209-4699-B76E-A738E16A47D9.jpeg.c00c359a9bc84b403bd114fccf34ac7f.jpeg
 

The 3 way point and the Y point that goes into the bay are progressing nicely 

 

E662D9A5-48F8-4B61-A95F-553F789E0255.jpeg.a2b2fcf5f23db2a9cf76337a78f811bf.jpeg

 

9ABEB063-5915-40D7-9721-8269D3B2C81C.jpeg.3f2928ceb0217cf10c18e37365d4c965.jpeg

 

The last section of the main platform has now been laid including the buffer stop, this meant I could work back towards the crossover on the loop line as well connecting in the catch pit for the cattle dock and the first section of block and beam track has gone in as a test for the loop

 

1F2AB199-59F0-4250-B1F8-7BACD134DF01.jpeg.1e38809cc1f4026332e1fae21e362fcc.jpeg

 

C435EBA3-2BED-41E9-AD87-CD7349CD70D6.jpeg.aaf1f58ec35d1d5e4528641fe099950f.jpeg

 

BE7B3BC5-2AB7-45CA-88C7-9EFD7892144E.jpeg.6cb42c033344fbefa1b603b90bb649d3.jpeg

 

077377BC-3662-4312-9088-AEDB30DC6178.jpeg.b62f526d73a715d721f81a169ed61efe.jpeg

  • Like 8
Link to post
Share on other sites

Bridge deck attempt 28!!! Maybe not but it feels like it, pretty Confident with this version, it fits nicely into the slots on the girder section without being too loose or tight. It now has recesses in the top which helps to reduce the stress built up in the curing process causing some of the warping. So fingers crossed!!!

 

58ECBE81-E6C2-4379-B0F4-45D495E45C2A.jpeg.4122bd4efb70cc499dc05c3c06346a5a.jpeg

 

3CDFEEAB-4A61-4E9F-BC22-5A793703632E.jpeg.b4c7cb202ac86ea052f192fcee1a036e.jpeg

 

0D512EA4-558B-4E2C-9D2D-FCE301E9110A.jpeg.1324654e0ad6ad11f7944fea7eaebbe5.jpeg

  • Like 12
Link to post
Share on other sites

Yesterday we also got quite a bit more done on the trackwork, all of the plain track on the station end is now in, including the buffer stops, the concrete pots for the loop line and the section across the ash pit in the shed

 

10876939-A95A-4D2C-B35D-E5FC574C9B05.jpeg.f5f1514c1c6e12ab972aa18b46611b75.jpeg

 

B5B30484-1747-42B9-92C1-D6F8C5B99C3A.jpeg.afe65322ca249080769d7504f6d21e60.jpeg

 

A0C470A7-D5A3-4C85-A9A0-4BC51A379572.jpeg.0858eb88a46f3681934863628abc2143.jpeg

 

31264821-67E4-40C4-A91D-082EEDDDBDC4.jpeg.fe860915f65c7864163d384de7753f9b.jpeg

 

It’s really nice to see it now all in place, and we can work out if all the stock fits where we hoped it would

 

With track laying into the shed it also means we’ve now stuck down the ash pit and shed floor, so this is now it’s final location. we really like the shed scene, it’s nice and compact but full of character

 

823CCB48-B642-4BD1-96DF-29C03571F56A.jpeg.e49c7dff7966549072af90339a190e7e.jpeg

 

BB1FBBD4-9737-46E8-AF48-B4F92A3738F7.jpeg.a9355ff801f96434197f6ab073fcf7d8.jpeg

 

Couldn’t resist digging out the signal posts and making sure they are still At the right distance from the track

 

D9DF0FE9-3274-47A2-A982-8E4C4BD383B2.jpeg.ffded49da8b51b7e1f6a15685e32e5e7.jpeg

 

4B559152-6838-475A-9625-12CDDC3E0457.jpeg.0dbd33b8746e1569a0b70180c9f74303.jpeg

  • Like 12
  • Craftsmanship/clever 1
Link to post
Share on other sites

After the success of Monday’s efforts on the bridge, the second half of the printing was done today. This meant the bridge could finally now be assembled and glued together.

 

39991AF2-7C47-4E8E-AB6F-7B38CDF8A566.jpeg.714a8fae4917535108579363631e533f.jpeg
 

6E0042E7-A852-4227-B760-79D1F752005F.jpeg.ea4664d08c52ede65e317e22d0c0a279.jpeg

 

B1E4D01C-A41C-4424-AF5D-658068AC5FCD.jpeg.de1034f24582718a382d1b355ff557ca.jpeg

 

the corrugated section on the top is to relieve some of the printing stresses which caused warping previously. Once ballasted over it won’t be seen.

 

of course we couldn’t resist putting it in situ and trialling some track across it!

 

C5964C0E-C987-432A-BC8C-F02594813DD2.jpeg.ed718f88f0383d498cbc10d8a0e4540a.jpeg

 

985361B2-E2FB-456D-AE3B-2C851D015ECA.jpeg.8dc59ec518cec2ab291950795beee8f8.jpeg

 

7C62822B-0425-42E1-ACB7-40376A242EF1.jpeg.56fff25a794247b3854f980d90861a06.jpeg

 

ED8B82E4-BC1A-464D-85A7-028BB93FEAEE.jpeg.078bd483eba300241f6f5d50199aaa20.jpeg

 

F36D9CB2-D17B-44D1-AF46-DFB8DCB48BA6.jpeg.fddfbc7f393a02201e5867605d34a1f4.jpeg

 

1D1CED5E-DDB3-4C45-B5D8-854653FC7C5E.jpeg.c6c225d7977a6f938230a0c4d66a03af.jpeg

 

C237220B-1CEC-45FE-91FA-33A5FCF355B6.jpeg.851ae4de13658f6e831d59e6bdd6a390.jpeg

 

next job is to paint it and the abutments ready to be fixed on the layout

  • Like 15
  • Craftsmanship/clever 4
Link to post
Share on other sites

A quick paint job on the abutments and they are now ready to be attached to the layout. 
 

I always paint my bricks by firstly covering the whole area in a stone grey and then dry brush on the brick colour after. It’s a slightly longer process but I’m really happy with the finish it gives

 

2DC4C6C5-6724-4D4C-9283-4CFCE8C6EEB1.jpeg.b1e9d413e919a77fa9e8a670024e4ab9.jpeg

 

6E579C69-F7A2-4B4C-B1A1-9771AAEA9A03.jpeg.b96a2e4f7cc698f38eb1273f9c336dec.jpeg

 

880E183E-C324-43D2-B6C0-85939B94DE18.jpeg.0d66160ed24f8cac8e38735779082ba4.jpeg

  • Like 9
  • Craftsmanship/clever 1
Link to post
Share on other sites

Yesterday we managed to have another good day on the layout. 
 

Track work continues, mainly adding closure rails including the first bits of the 3 way. Also the crossover in the platform has progressed to the same state as the others

 

3A70B1FB-2DC9-49C7-8702-7A897D118403.jpeg.0167471fa4690ba7e152646015b9f4ec.jpeg

 

826C0756-0D7C-4E8B-81D4-C209D3BCB4F0.jpeg.6804731236f113b4672bac469ddbcf86.jpeg

 

After painting the abutments of the main bridge during the week we’ve now attached these to the layout. The bridge section has had a first coat of paint, the final colour will be a lot lighter.

We also attached the culvert to the layout, when compared to the main bridge this is quite a small structure but with all of it’s angles it’s just as interesting. Glad we did it as 2 separate spans rather than 1 long culvert

 

95241C53-684A-4EDC-8DF5-706B6B18DD8F.jpeg.292807b3ff60292ea0fecc0df469b644.jpeg

 

FB33F5FD-C13A-4628-9C54-602C39C02EB3.jpeg.0fd824931f6ae706a38b05f07dc3aa9c.jpeg

 

7AEC98BF-A758-4EA7-82B6-6F391AC2F656.jpeg.a2228febfe51c75a23fae8c8799e353d.jpeg

 

95110BF2-531D-4BD7-AFF1-534AD1F01336.jpeg.7a97f2dffa0ac8f793a17af31cb87508.jpeg

 

1C525BD7-7188-42F7-AED3-D5AA0BC8039D.jpeg.7ea49eb7a3d3297ec95d1088bb0e1625.jpeg

 

B43F8390-1DB1-4949-9604-49D078D75138.jpeg.81f389d7cd2352731990fe5e86ea17af.jpeg

 

36C1E487-D138-45FE-9BFC-3E8F213111CE.jpeg.de57b1d335980c0f6711b69d41f9a061.jpeg

 

lastly we’ve been playing with some 3D printed bits, some for point rodding bits but also some Western region apparatus cases which will be dotted round the layout in the appropriate places

 

D7A59E91-AFEE-479C-84FD-A22AB2C55928.jpeg.26ff5dbb325244b4cf24f41b50609918.jpeg

 

8C620348-0058-4D0B-A3F0-5A528E7B8C57.jpeg.6bbc0d793228047ee22c3d6f681ef582.jpeg

 

61E6CB9B-C8AC-46A7-8051-6A049DCE5B21.jpeg.493a3decfa5e821e55b6bcca49d73015.jpeg

 

B4282D57-1456-4184-A206-72F85E8AED2D.jpeg.97e8e7a27dd2ae9e27ae4c605826c728.jpeg

 

590DAC7F-43A0-4000-B05E-01C1DA17E60D.jpeg.33b58ae2b44f3beb95c6703a050a8485.jpeg

  • Like 12
  • Craftsmanship/clever 2
Link to post
Share on other sites

  • 2 weeks later...

This week we have ticked off one of the major jobs on the layout, this is getting the main bridge stuck in place, this has meant we could continue with track laying over the bridge and run the plain track up towards the F/Y. This completes the maint track work on the layout and just leaves finishing off the points now!

 

6EE6C401-FA8B-42E4-BDF5-BD6CE245ED5F.jpeg.bebbc4c6d08421e3097c3d2c5275e9d7.jpeg

 

1B7B2D13-F983-479F-907C-8DB20EC09453.jpeg.b3a5347fa0e328a5c36056b3798570dc.jpeg

 

C0A2C0FA-D130-42F7-976E-FA8CD933C650.jpeg.c34285a16af52287c43de7e26c227dc7.jpeg

 

41BC1335-2458-422D-92B2-D916B128A196.jpeg.9e36668243fd8d47e6cb9bfe9d3466ef.jpeg

 

F24A447A-68B9-468B-988E-97EE97747F5A.jpeg.a0b13d7ef07e025d3ed361c9c2ea20ce.jpeg

 

0DDAFBB9-43C2-4D1A-B2D8-FF65666A8875.jpeg.4d75c2a64ef9fda132b01627701b0e7d.jpeg

 

139DC334-A383-462B-9364-B21EDCCF0D01.jpeg.16feb0b03007c866c966622fdfb4685a.jpeg

the curves in this line is to try and deceive people that the 2 tracks are going away from each other as it enters the tunnel, of course it had to come back straight to go onto the F/Y

 

as seen in the other shots, a plinth for the signal box has now been added, this brings it up to the correct height against the track and at the correct distance, it now has a much more commanding stance over the track

 

E6A14C97-F0F9-4217-8B3B-1718C8AD1E2E.jpeg.9a7463419f4638a5b3508fa7c6aad797.jpeg

 

574B5FDA-C74F-4370-BB82-C56469B6DDC2.jpeg.02c34f1ffae2b2d9664c031f2658c013.jpeg

 

finally work is still progressing slowly experimenting with point rodding, being made up of my own 3D printing and parts from modelu

 

1448A6DD-0F40-477D-ABBF-AF35884D8826.jpeg.ed62c7da02fffb783dd35b7adee061d2.jpeg

 

77C618AF-BBDF-42A9-B633-E9E489782B93.jpeg.3e905dacd2fac2dd53e649b2b736288b.jpeg

 

0B90A33A-887B-4C67-9495-62BB59C100AA.jpeg.97de28d49ff52aec216ac13d2a1c4836.jpeg

 

 

I was asked on another forum why not use the Wills kit over making your own, this photo shows the answer

 

0DF9CF96-D560-4F04-8DF5-7D6341CE4ADC.jpeg.9a26784e2c05f2026142ee2966529a91.jpeg

  • Like 13
  • Craftsmanship/clever 3
Link to post
Share on other sites

Some interesting bits of point rodding going in today. This is the section across the bridge and the first compensator, it’s a bit of a tight squeeze through the bridge but It’s the same as the prototype. The other option would be to have rollers attached to supports welded to the bridge sides.

 

0124D176-EABD-43B9-AE1F-FC5FCCFF29DC.jpeg.19235efdbe1efa5b4e5dbc62999a321c.jpeg

 

80EEA630-E33D-4000-AAFF-6C00BE61BD84.jpeg.a29799b1f7e1963e59cc0974462c7c77.jpeg

 

DB03A052-D4CF-4367-90BF-C2729F3C4DDE.jpeg.a93194b8399de6415f4295d05fd9c586.jpeg

 

B1DA43AF-7721-4232-8220-7A6F9F6D18C0.jpeg.4c1f3ecc90abea513c3cf7b9676776c5.jpeg

 

964BED18-410F-4706-B197-3FB359B90362.jpeg.780d1e44e49c1f9a9d11ec41b75595c3.jpeg

There is a slight rise to get up to sleeper level through the bridge so some custom made stools were required for this rising 0.2mm on each stool

 

0116A0C8-9E49-4BAE-B27F-26F0C449927B.jpeg.8e4a513bab0b8daf6618ec250a8a6c79.jpeg

Edited by Johndc120
Spelling correction
  • Like 7
  • Craftsmanship/clever 3
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...